RG-KA-60022 · RERA PRM/KA/RERA/1251/310/PR/190222/002446 · Last updated on RERA Karnataka portal: 25 Feb 2022
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
DNR SPRINGLEAF is a Residential/Group Housing project by DNR CORPORATION PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190222/002446 on 22 Feb 2019. Possession is promised by 30 Sep 2023. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameDNR SPRINGLEAF
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/190222/002446
- ReraGenie IDRG-KA-60022
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Feb 2019
- Promised completion30 Sep 2023
- Revised completionRevised to 30 Sep 2023 (originally 30 Dec 2022)
- Buildings2 building records
- Documents filed110 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | - | - | - | 25 | 0 | 25 |
| TOWER B | - | - | - | 34 | 0 | 34 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 25 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 25 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ALAY DESIGN COLLABORATORS |
| Engineer | SHRADHA DESIGNTECH PVT LTD |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed110
As listed on the registration, under the names the promoter filed them with; the newest 80 of 110 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190222/002446 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| RENEWED BESCOM NOCFile: BESCOM-NOC-24-02-2022.pdf | 25 Feb 2022 |
| BESCOM NOC-HIGHLIGHTED CLAUSE BY BESCOM AUTHORITYFile: BESCOM NOC-HIGHLIGHTED CLAUSE BY BESCOM.pdf | 1 Feb 2022 |
| SITE PLAN ELEVATION AND SECTION PLANFile: Site Plan Elevation Section Plan 10MB.jpg | 12 Jan 2022 |
| Updated no of inventory details as per modified planFile: Updated no of inventory details.pdf | 4 Oct 2021 |
| 1st to 9th floor plan and Terrace floorFile: 1st to 9th Floor Plan & Terrace .jpg | 4 Oct 2021 |
| Basement & Ground Floor PlanFile: Basement & Ground Floor Plan.jpg | 4 Oct 2021 |
| Site Plan, Elevation & Section PlanFile: Site Plan, Elevation & Section P.jpg | 4 Oct 2021 |
| Designated Bank account statement JAN TO JULY 2021File: BANK STATEMENT-JAN2021 TO JULY 2021.pdf | 18 Aug 2021 |
| Designated Bank account statement till date - AUGUST 2021File: BANK STATEMENT- AUGUST 2021.pdf | 18 Aug 2021 |
| CONSENT LETTER OF BUYERFile: B-803.pdf | 18 Aug 2021 |
| Total no of the units inventory detailsFile: DNR Springleaf 59 UNIT DETAILS.pdf | 18 Aug 2021 |
| BANK STATEMENT TILL DATEFile: BANK STATEMENT-TILL DATE.pdf | 6 Apr 2021 |
| Site plan, ElevationFile: SITE-ELEVATION-SECTION-PLAN.pdf | 6 Apr 2021 |
| TDR CALCULATION DETAILSFile: DNR Spring leaf - TDR Calculation details.pdf | 6 Apr 2021 |
| Designated Bank account statement till dateFile: Designated Bank Account Statement_Jan2021.pdf | 5 Mar 2021 |
| Designated Bank account statement till dateFile: Designated Bank Account Statement_Sep2020.pdf | 5 Mar 2021 |
| TDR CalculationFile: TDR CALCULATION.png | 5 Mar 2021 |
| commencement certificateFile: COMMENCEMENT CERTIFICATE-DNR SPRINGLEAF.pdf | 5 Mar 2021 |
| modified plan -site plan elevation and section planFile: Site Plan, Elevation & Section Plan.jpg | 5 Mar 2021 |
| modified plan - basement and ground floor planFile: Basement & Ground Floor Plan.jpg | 5 Mar 2021 |
| modified plan- first to ninth floor plan and terrace floor planFile: 1st to 9th Floor Plan & Terrace Floor Plan.jpg | 5 Mar 2021 |
| CertificateFile: Registration Certificate.pdf | - |
| Already registered project ongoing detailsFile: Already registered project ongoing detail.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Sanction -as per Modified Plan.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: SITE-ELEVATION-SECTION-PLAN.pdf | - |
| List Of AllotteesFile: Allottee Details.pdf | - |
| List Of ComplaintsFile: LIST OF COMPLAINTS.pdf | - |
| Consent LetterFile: Allottee Details.pdf | - |
| List Of Pending LitigationsFile: LIST OF PENDING LITIGATION.pdf | - |
| Chartered Accountant CertificateFile: FORM-4-CA CERTIFICATE.pdf | - |
| Notarized AffidavitFile: AFFIDAVIT CUM DECLARATION.pdf | - |
| Engineer CertificateFile: FORM-6-ENGINEERS CERTIFICATE.pdf | - |
| Architect CertificateFile: FORM-5- ARCHITECT CERTIFICATE.pdf | - |
| Structural Engineer Certificate for stability of structureFile: Stability Certificate.pdf | - |
| Modification of Plan DetailsFile: BUILDING PLAN.pdf | - |
| Modification of Plan DetailsFile: Site Plan, Elevation & Section Plan.jpg | - |
| Modification of Plan DetailsFile: Sanction Letter -as per registered Plan.pdf | - |
| Modification of Plan DetailsFile: Sanction -as per Modified Plan.pdf | - |
| Modification of Plan DetailsFile: Sold & Unsold units-As Per Registered Plan.pdf | - |
| Modification of Plan DetailsFile: Sold & Unsold units- As Per Modified Plan.pdf | - |
| Document 1File: FIRE & SAFETY-NOC.pdf | - |
| Document 2File: BESCOM NOC.pdf | - |
| Document 3File: BWSSB NOC.pdf | - |
| Document 4File: KSPCB NOC.pdf | - |
| Document 5File: BSNL NOC.pdf | - |
| Document 6File: Airport Authority-NOC.pdf | - |
| TDR CALCULATIONFile: TDR CALCULATION.pdf | - |
| TDR CERTIFICATE-ATTESTED COPYFile: TDR CERTIFICATES-ATTESTED COPIES.pdf | - |
| TOWER-A UNIT DETAILSFile: Tower A- Unit Details.pdf | - |
| TOWER-B UNIT DETAILSFile: Tower B-Unit Details.pdf | - |
| TOWER WISE UNIT DETAILS AS PER REGISTERED PLAN AND MODIFIED PLANFile: TOWER WISE UNIT DETAILS AS PER REGISTERED PLAN AND MODIFIED PLAN.pdf | - |
| LATITUDE LONGITUDEFile: Latitude and Longitude-DNR SPRINGLEAF.pdf | - |
| BASEMENT STILT FLOOR PLANFile: BASEMENT-STILT-FLOOR PLAN.pdf | - |
| 1ST AND TILL 9TH FLOOR PLANFile: 1ST, 2ND TO 8TH & 9TH FLOOR PLAN.pdf | - |
| Commencement Certificate | - |
| SITE PLAN | - |
| Proforma for Sale Deed | - |
| Proforma of Agreement of Sale | - |
| TITLE DOCUMENT | - |
| Approved Section of Building & infrastructure Plan of Plotting | - |
| Area Development Plan of Project Area | - |
| Proforma of Allotment Letter | - |
| Brochure of Current Project | - |
| Project Specification | - |
| EC from 13-02-2018 to till date | - |
| Notarized Affidavit for 3(1) Violation | - |
| BDA Katha -Koramangala | - |
| JDA Koramangala Property | - |
| NOC-Fire Force Department | - |
| AAI-NOC | - |
| BESCOM NOC | - |
| BWSSB NOC | - |
| KSPCB NOC | - |
| BSNL NOC | - |
| Approved Layout Plan | - |
| Approved Section of Building & infrastructure Plan of Plotting | - |
| BDA Katha -Koramangala | - |
| Balance Sheet 2017 - 2018File: Balance Sheet-2017.pdf | - |
| Balance Sheet 2016 - 2017File: Balance Sheet-2016.pdf | - |
| Balance Sheet 2015 - 2016File: Balance sheet-2018.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| DNR ATMOSPHERE | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep DNR SPRINGLEAF on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: DNR CORPORATION PVT LTD
DNR CORPORATION PVT LTD has 3 registrations on RERA Karnataka, including DNR SPRINGLEAF and DNR PARKLINK PHASE 2. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if DNR SPRINGLEAF is delayed beyond 30 Sep 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DNR SPRINGLEAF?
The registered promoter entity is DNR CORPORATION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DNR SPRINGLEAF?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DNR SPRINGLEAF?
The professionals named in the filing: Architect: ALAY DESIGN COLLABORATORS; Engineer: SHRADHA DESIGNTECH PVT LTD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DNR SPRINGLEAF?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback