Home / Browse projects / Bengaluru Urban, Karnataka / DNR HIGHLINE
DNR HIGHLINE
By DNR CORPORATION PRIVATE LIMITED
RG-KA-73883 · RERA PRM/KA/RERA/1251/309/PR/220118/004647 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
DNR HIGHLINE is a Residential/Group Housing project by DNR CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/220118/004647 on 18 Jan 2022. Possession is promised by 1 Oct 2027. The completion date has moved by 12 months from the original filing. 169 of the 218 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete.
At a glance
Project
- NameDNR HIGHLINE
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/220118/004647
- ReraGenie IDRG-KA-73883
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jan 2022
- Promised completion1 Oct 2027
- Revised completionRevised to 1 Oct 2027 (originally 1 Oct 2026)
- Buildings2 building records
- Documents filed189 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 90 | 0 | 90 |
| B | - | - | - | 128 | 0 | 128 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 17 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 99%.
Building: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 99% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 99% |
| Plastering inside , outside & Ceiling | 99% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 90% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 95% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 85% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 85% |
| Weather Proof work(tile,concrete) | 95% |
| Painting | 85% |
| Elevation work | 85% |
| Internal and External work including landscapes as per santioned drawings | 60% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 80% |
| Internal Roads & Footpaths | Yes | 0% |
| Sewage and Drainage System | Yes | 80% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 85% |
| Solid waste management and disposal | Yes | 30% |
| Water conservation | Yes | 20% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 50% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 60% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 50% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 50% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 92% |
| Lifts | Yes | 90% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 90% |
| Fire escapes | Yes | 90% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 50% |
| Basement | Yes | 90% |
| Terrace | Yes | 95% |
| Outer Wall | Yes | 30% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ANUSHKA CONSTRUCTIONS PRIVATE LIMITED | - | - |
| DAVANAM CONSTRUCTIONS PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 132.19 cr | Rs 3.52 cr |
| On-site expenditure-Consultants Fees | Rs 44.11 cr | Rs 7.72 lakh |
| Payment of taxes | Rs 33.40 cr | Rs 67.24 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 33.21 cr | Rs 57.65 lakh |
| On-site expenditure-Site Overhead | Rs 6.00 cr | Rs 7.35 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 3.25 cr | Rs 6.83 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | URBAN FRAME PRIVATE LIMITED |
| Engineer | PRASAD CONSULTANTS |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterForce Majeure
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed189
As listed on the registration, under the names the promoter filed them with; the newest 80 of 189 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/220118/004647 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4, Q2 Uploaded.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM -5 ARCHITECT CERTIFICATE.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM - 6 ENGINEER CERTIFICATE.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| BUILDING LICENCEFile: Building Licence 2025.pdf | 28 Sep 2026 |
| PLANFile: PLAN.pdf | 28 Sep 2026 |
| EX-5 ENGINEER LICENCEFile: Ex5 ENGINEER CERTIFICATE.pdf | 28 Sep 2026 |
| EX-6 ENGINEER LICENCEFile: Ex6 ENGINEER CERTIFICATE.pdf | 28 Sep 2026 |
| KSPCB ACKFile: KSPCB Ack.pdf | 28 Sep 2026 |
| SOLD AND UNSOLDFile: SOLD AND UNSOLD.pdf | 28 Sep 2026 |
| AFFIDAVIT FOR NOCFile: Affidavit.pdf | 28 Sep 2026 |
| CIVIL ENGINEER LICENCEFile: CIVIL ENGINEER LICENCE.pdf | 28 Sep 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4, CA (QU) - Highline_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE HIGHLINE.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE HIGHLINE.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA QU Highline.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Architect certificate.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Certificate.pdf | 15 Apr 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q3 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Fire and Safety | 15 Apr 2026 |
| Q3 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CHARTED ACCOUNTANT CERTIFICATE FORM 4_compressed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: ARCHITECT CERTIFICATE FORM 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENGINEER CERTIFICATE FORM 6.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| AGREEMENT OF SALE INCORPORATION SCHEDULE C PAYMENT PLANFile: AOS Oakalipuram RERA.pdf | 14 Jan 2022 |
| BWSSB NOCFile: BWSSB NOC.pdf | 12 Jan 2022 |
| AGREEMENT OF SALE DRAFT AS PER GOK PROVISIONSFile: AOS_Oakalipuram_RERA.pdf | 23 Dec 2021 |
| BWSSB-NOC-ACKNOWLEDGEMENTFile: BWSSB-NOC-ACKNOWLEDGEMENT.jpeg | 23 Dec 2021 |
| REVENUE RELATED CLAUSE IS HIGHLIGHTED IN JDA CLAUSE NO 7File: REPLY FOR THE QUERY WITH regard to revenue sharing.pdf | 23 Dec 2021 |
| ECFile: EC-01-04-2005 TO 03-10-2021.pdf | 6 Dec 2021 |
| AOS DRAFT AS PER NOTIFIED GOKFile: AOS_Oakalipuram_RERA.pdf | 29 Nov 2021 |
| SALE DEED DRAFT AS PER NOTIFIED GOKFile: PROFORMA OF SALE DEED.pdf | 29 Nov 2021 |
| STATUS OF THE PROJECTS OF DEVELOPER AND THEIR TRACK RECORDFile: TRACK RECORD OF DEVELOPER PROJECTS.pdf | 29 Nov 2021 |
| TITLE OPINIONFile: TITLE OPINION-OKALIPURAM.pdf | 29 Nov 2021 |
| DEED OF DISCHARGE FROM UNION BANKFile: Deed of Discharge-union bank.pdf | 29 Nov 2021 |
| RELEASE LETTER FROM UNION BANKFile: release letter-UNION BANK TO DAVANAM JWELLERS.pdf | 29 Nov 2021 |
| BSNL NOCFile: NOC-BSNL.pdf | 27 Oct 2021 |
| BWSSB NOCFile: NOC-BWSSB.pdf | 27 Oct 2021 |
| SITE PLANFile: Site Plan.pdf | 21 Oct 2021 |
| GROUND FLOOR PLANFile: Ground Floor Plan.pdf | 21 Oct 2021 |
| Elevation Section PlanFile: Elevation Section Plan.pdf | 21 Oct 2021 |
| 1ST BASEMENT FLOOR PLANFile: 1st Basement Floor Plan.pdf | 21 Oct 2021 |
| 2ND BASEMENT FLOOR PLANFile: 2nd Basement Floor Plan.pdf | 21 Oct 2021 |
| 3RD BASEMENT FLOOR PLANFile: 3rd Basement Floor Plan.pdf | 21 Oct 2021 |
| 1st to 17th Floor PlanFile: 1st to 17th Floor Plan.pdf | 21 Oct 2021 |
| 18th 19th & 21st Floor PlanFile: 18th 19th & 21st Floor Plan.pdf | 21 Oct 2021 |
| 20th 23rd & 24th Floor PlanFile: 20th 23rd & 24th Floor Plan.pdf | 21 Oct 2021 |
| 24th & 25th Floor PlanFile: 24th & 25th Floor Plan.pdf | 21 Oct 2021 |
| 26th & 27th Floor PlanFile: 26th & 27th Floor Plan.pdf | 21 Oct 2021 |
| 28th & Terrace Floor PlanFile: 28th & Terrace Floor Plan.pdf | 21 Oct 2021 |
| RENEWED KSPCB NOCFile: KSPCB-2021.pdf | 21 Oct 2021 |
| BWSSB -APPLIED ONLINE APPLICATION ACKNOWLEDGMENTFile: BWSSB-APPLICATION SUBMISSION.pdf | 21 Oct 2021 |
| CANCELLATION JDA WITH PACIFIC HEIGHTS BY DAVANAMFile: DEED OF CANCELLATION-JDA.pdf | 21 Oct 2021 |
| REVOCATION OF POWER OF ATTORNEY WITH PACIFIC HEIGHTS BY DAVANAMFile: DEED OF REVOCATION-1.pdf | 21 Oct 2021 |
| Break up development details with type of flat/houseFile: DNR Highline_Unit Details-breakup devlopment details.pdf | 21 Oct 2021 |
| ENCUMBRANCE CERTIFICATE FROM 01-04-2005 TO 03-10-2021File: EC-01-04-2005 TO 03-10-2021.pdf | 5 Oct 2021 |
| BUILDING LICENSE WITH CONDITIONSFile: SANCTION & LICENCE & Condition for Highline Project.pdf | 5 Oct 2021 |
| STP DETAILSFile: STP details-DNR HIGHLINE.pdf | 5 Oct 2021 |
| STP LOCATION CAPACITY WITH SECTION DETAILSFile: DNR HIGHLINE_STP LOCATION CAPACITY WITH SECTION DETAILS.PDF | 5 Oct 2021 |
| PROJECT SPECIFICATION WITH AUTHORISED SIGNEDFile: PROJECT SPECIFICATION-AUTHORISED SIGNED.pdf | 5 Oct 2021 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| DNR SPRINGLEAF | - | Ongoing | Sep 2023 | Not delivered |
| DNR CASABLANCA | - | Ongoing | Jun 2022 | Not delivered |
| DNR REFLECTION | - | Completed | - | No date filed |
| DNR ATMOSPHERE | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep DNR HIGHLINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: DNR CORPORATION PRIVATE LIMITED
DNR Corporation Private Limited has 3 registrations on RERA Karnataka, including DNR SOLACE and DNR HIGHLINE. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if DNR HIGHLINE is delayed beyond 1 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DNR HIGHLINE?
The registered promoter entity is DNR CORPORATION PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DNR HIGHLINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DNR HIGHLINE?
The professionals named in the filing: Architect: URBAN FRAME PRIVATE LIMITED; Engineer: PRASAD CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DNR HIGHLINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.