ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / DivyaSree Quiet Side

Registration approved No litigation declared Residential/Group Housing project

DivyaSree Quiet Side

By DIVYASREE INFRASTRUCTURE PROJECTS PRIVATE LIMITED

RG-KA-52236 · RERA PRM/KA/RERA/1251/472/PR/291026/009050 · Last updated on RERA Karnataka portal: 27 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2031Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 102 documents Report an error

DivyaSree Quiet Side is a Residential/Group Housing project by DIVYASREE INFRASTRUCTURE PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/291026/009050 on 29 Oct 2026. Possession is promised by 30 Dec 2031.

At a glance

Project

  • NameDivyaSree Quiet Side
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/291026/009050
  • ReraGenie IDRG-KA-52236

Builder

  • NameDIVYASREE INFRASTRUCTURE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202KA2010PTC052729
  • GSTIN23AADCD3654M1Z9
  • Authorized SignatoryAvinash Suresh
  • CeoAvinash Suresh
  • DirectorsSagi Raju Srinivasulu, Divya Varadan
  • Project HeadAvinash Suresh
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Oct 2026
  • Promised completion30 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---60060
Block B---88088
Block C---88088

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 27 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 27 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,308 sq m
Named landowners6
LandownerVillageDistrict
P S Prafulla--
Archana P S--
Ashwini Suryanarayan Murthy--
P S Prafulla--
Archana P S--
Ashwini Suryanarayan Murthy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 223.34 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 177.18 cr-
Administrative CostsRs 38.39 cr-
On-site expenditure-Consultants FeesRs 6.77 cr-
Payment of taxesRs 1.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSharad Maithel
EngineerB E Pruthviraja
Chartered AccountantSamba Moorthy Velakur

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed102

As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/291026/009050 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Agreement for SaleFile: Agreement for Sale.pdf27 Oct 2026
Grant orderFile: 1 Grant order.pdf17 Oct 2026
Death Certificate of Suryanarayana MurthyFile: 1 Death Certificate of Suryanarayana Murthy.pdf17 Oct 2026
Family Tree of Surya NarayanamurthyFile: 1 Family Tree of Surya Narayanamurthy.pdf17 Oct 2026
DivyaSree Quiet Side - Hissa Survey Tippany Sy No 6File: 1 DivyaSree Quiet Side - Hissa Survey Tippany Sy No 6.pdf17 Oct 2026
Hissa Survey Tippany Sy No 5File: 1 Hissa Survey Tippany Sy No 5.pdf17 Oct 2026
Relinquishment DeedFile: 3 Relinquishment Deed.pdf17 Oct 2026
RRTCR 29_12_13File: 1 RRTCR 29_12_13.pdf17 Oct 2026
Agreement for SaleFile: Agreement to sell .pdf17 Oct 2026
RTC, survey 5/3-
Mutation, survey 5/3-
Encumbrance Certificate, survey 5/3-
Conversion/Alienation Order, survey 5/3-
JDA, survey 5/3-
Khatha, survey 5/3-
RTC, survey 6/1-
Mutation, survey 6/1-
Encumbrance Certificate, survey 6/1-
Conversion/Alienation Order, survey 6/1-
JDA, survey 6/1-
Khatha, survey 6/1-
Registration CertificateFile: DIPPL COI.pdf-
Memorandum of AssociationFile: DIPPL MOA.pdf-
Article of AssociationFile: DIPPL AOA.pdf-
GST CertificateFile: DIPPL GST Certificate.pdf-
Organization StructureFile: DIPPL Organisation Structure.pdf-
Certificate issued by CA Form 1File: DivyaSree Quiet Side - Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: DivyaSree Quiet Side Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: DivyaSree Quiet Side Form 3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: DivyaSree Quiet Side-Non Litigation Affidavit.pdf-
Balance Sheet 2025 - 2026File: DIPPL-Provisional Balance Sheet FY 25-26 and Clarification on sales.pdf-
Balance Sheet 2024 - 2025File: DIPPL Balance Sheet FY 2024-25 and Clarification Sales.pdf-
Balance Sheet 2023 - 2024File: DIPPL Balance Sheet FY 2023-24.pdf-
Audited Profit and Loss Statement 2025 - 2026File: DIPPL-Provisional Profit & Loss FY 25-26 and Clarification on sales.pdf-
Audited Profit and Loss Statement 2024 - 2025File: DIPPL Profit and Loss FY 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: DIPPL Profit and Loss FY 2023-24.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: DIPPL ITR FY 2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: DIPPL ITR FY 2023-24.pdf-
Director's Report 2025 - 2026File: DIPPL-Provisonal Financials FY 25-26.pdf-
Director's Report 2024 - 2025File: DIPPL Director Report FY 2024-25.pdf-
Director's Report 2023 - 2024File: DIPPL Director Report FY 2023-24.pdf-
Cash Flow Statement 2025 - 2026File: DIPPL-Provisonal Financials FY 25-26.pdf-
Cash Flow Statement 2024 - 2025File: DIPPL Cash Flow Statement FY 2024-25.pdf-
Auditor's Report 2025 - 2026File: DIPPL-Provisonal Financials FY 25-26.pdf-
Auditor's Report 2024 - 2025File: DIPPL Auditors Report FY 2024-25.pdf-
Auditor's Report 2023 - 2024File: DIPPL Auditors Report FY 2023-24.pdf-
DivyaSree Quiet Side Building License-
DivyaSree Quiet Side Approved Building Plan-
DivyaSree Quiet Side Approved Building Plan-
DivyaSree Quiet Side Structural Stability certificate-
DivyaSree Quiet Side Project Specifications-
DivyaSree Quiet Side-Brochure Declaration-
DivyaSree Quiet Side Relinquishment Deed-
DivyaSree Quiet Side-Proforma of Agreement for Sale-
DivyaSree Quiet Side - Proforma of Allotment Letter-
DivyaSree Quiet Side-Form B Affidavit-
DivyaSree Quiet Side Section 3(1) Affidavit-
DivyaSree Quiet Side- JDA Affidavit-
DivyaSree Quiet Side Legal Opinion-
Divyasree Quiet Side BESCOM NOC & Affidavit-
Divyasree Quiet Side BWSSB NOC-
Divyasree Quiet Side KSPCB NOC-
Divyasree Quiet Side SEIAA NOC-
Divyasree Quiet Side Fire NOC-
DivyaSree Quiet Side AAI NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
DivyaSree Quiet Side - GPA-
DivyaSree Quiet Side Aakarabndh Sy No 5 3 and 6 1-
DivyaSree Quiet Side Land Cost Calculation Sheet-
DivyaSree Quiet Side - Surveyor Sketch-
DivyaSree Quiet Side - Hissa Survey Tippany Sy No 5-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
77° LIFE157/2,157/3A,157/3B,159/1B, 77 Life, 77 Town Center, Yemalur Main Road , Off. Old Airport Road , Bengaluru East , Bengaluru Urban, Karnataka - 560037Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DivyaSree Quiet Side on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDivyaSree Quiet SideOther 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: DIVYASREE INFRASTRUCTURE PROJECTS PRIVATE LIMITED

DivyaSree Infrastructure Projects Private Limited has 2 registrations on RERA Karnataka, including 77° LIFE and DivyaSree Quiet Side. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DivyaSree Quiet Side is delayed beyond 30 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DivyaSree Quiet Side?

The registered promoter entity is DIVYASREE INFRASTRUCTURE PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45202KA2010PTC052729 and GSTIN 23AADCD3654M1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DivyaSree Quiet Side?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DivyaSree Quiet Side?

The professionals named in the filing: Architect: Sharad Maithel; Engineer: B E Pruthviraja; Chartered Accountant: Samba Moorthy Velakur. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DivyaSree Quiet Side?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DivyaSree Quiet Side. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DivyaSree Quiet Side to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.