Red flags

  • 9 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
9Complaints at RERA Karnatakaon this registration
Jump to the 38 documents Report an error

DIVYA JSR LIMELITE is a Residential/Group Housing project by DIVYA INFRA PROPERTIES PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171026/000567 on 26 Oct 2017. Possession is promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NameDIVYA JSR LIMELITE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/171026/000567
  • ReraGenie IDRG-KA-30192

Builder

  • NameDIVYA INFRA PROPERTIES PVT LTD
  • Entity typeCompany
  • CINU70200KA2005PTC036361
  • Authorized SignatoryMALISETTY SATYA RAVIPRASAD
  • DirectorM DIVYA RAVI
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Oct 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TULIP---1120112
PRIMROSE & ORCHID---2380238

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,473 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 65.94 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASLAM ARCHITECTS AND INTERIOR DESIGNERS PRIVATE LIMITED
EngineerDESIGN VENTURES ENGINEERING CONSULTANTS (INDIA) PRIVATE LIMITED

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/220622/000567Dec 2018 → Dec 2019

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka9

Case no.ComplainantRespondentFiled
CMP/190707/0003484-DIVYA INFRA PROPERTIES PVT LTD07/07/2019
CMP/190707/0003502-DIVYA INFRA PROPERTIES PVT LTD07/07/2019
CMP/190708/0003507-DIVYA INFRA PROPERTIES PVT LTD08/07/2019
CMP/190710/0003509-DIVYA INFRA PROPERTIES PVT LTD10/07/2019
CMP/190711/0003545-DIVYA INFRA PROPERTIES PVT LTD11/07/2019
CMP/190712/0003542-DIVYA INFRA PROPERTIES PVT LTD12/07/2019
CMP/190724/0003543-DIVYA INFRA PROPERTIES PVT LTD24/07/2019
CMP/221010/0010069-DIVYA INFRA PROPERTIES PVT LTD10/10/2022
01307/2023-DIVYA INFRA PROPERTIES PVT LTD01/09/2023

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171026/000567 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: MOA & AOA.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Architects Certificate for status of work .pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate Status of Work .pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilzed .PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architects certificate for Penidng work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer certificate Pending Work .pdf-
CA Certificate for Funds required for Project CompletionFile: CA Fund Required.PDF-
AffidavitFile: RERA -FORM B.PDF-
Latest Encumbrance CertificateFile: RERA-EC.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold & Unsold Flats details.xlsx-
Document 1-
commencement certificate-
approved plan-
DRAFT COPY - SALE-DEED-final_2-
Draft Agreement_P_-
JDA-
Approved section of building-
approved plan-
allotment letter-
brochure-
ALL NOC-
Project Specification-
EC-
Khata Certificate-
Coversion-
Balance Sheet 2014 - 2015File: New Doc 2017-07-31 (2)_2.jpg-
Balance Sheet 2013 - 2014File: New Doc 2017-07-31 (1)_10.jpg-
Audited Profit and Loss Statement 2014 - 2015File: New Doc 2017-07-31 (2)_3.jpg-
Audited Profit and Loss Statement 2013 - 2014File: New Doc 2017-07-31 (1)_11.jpg-
Cash Flow Statement 2013 - 2014File: CASH FLOW - 2014-15.jpg-
Auditor's Report 2014 - 2015File: audit report.jpg-
Auditor's Report 2013 - 2014File: auditor report.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: New Doc 2017-07-31 (2)_1.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: New Doc 2017-07-31 (1)_1.jpg-
merge_from_ofoct-
Prospectus/Brochure-
Advertisement Copy 1File: PRESS ADVERTISEMENT.docx-
Tower Excel SheetFile: PRM-KA-RERA-1251-309-PR-171026-000567.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
DIVYA MSR GATEWAY-CompletedJul 2017No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DIVYA JSR LIMELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: DIVYA INFRA PROPERTIES PVT LTD

DIVYA INFRA PROPERTIES PVT LTD has 1 registration on RERA Karnataka, including DIVYA JSR LIMELITE. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DIVYA JSR LIMELITE is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DIVYA JSR LIMELITE?

The registered promoter entity is DIVYA INFRA PROPERTIES PVT LTD, a company as per the filing. Its CIN U70200KA2005PTC036361 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DIVYA JSR LIMELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DIVYA JSR LIMELITE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at DIVYA JSR LIMELITE?

The professionals named in the filing: Architect: ASLAM ARCHITECTS AND INTERIOR DESIGNERS PRIVATE LIMITED; Engineer: DESIGN VENTURES ENGINEERING CONSULTANTS (INDIA) PRIVATE LIMITED. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIVYA JSR LIMELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIVYA JSR LIMELITE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIVYA JSR LIMELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.