Home / Browse projects / Uttara Kannada, Karnataka / DIMA Heights

Registration approved No litigation declared Mixed Development project

DIMA Heights

By Om Ganeshaya Namah Constructions

RG-KA-28717 · RERA PRM/KA/RERA/1274/350/PR/300623/006024 · Last updated on RERA Karnataka portal: 19 Jun 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 120 documents Report an error

DIMA Heights is a Mixed Development project by Om Ganeshaya Namah Constructions in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/350/PR/300623/006024 on 30 Jun 2023. Possession is promised by 8 Jul 2024.

At a glance

Project

  • NameDIMA Heights
  • TypeMixed Development
  • Location
    • Uttara Kannada
    • 581301
  • Pincode581301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1274/350/PR/300623/006024
  • ReraGenie IDRG-KA-28717

Builder

  • NameOm Ganeshaya Namah Constructions
  • Entity typeProprietorship Firm
  • GSTIN29ARPPC4052Q1Z6
  • Authorized SignatoryChalamani M Balaraju
  • Other registrations2 more →

Key dates

this monthRegisteredJun 2023PromisedJul 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Jun 2023
  • Promised completion8 Jul 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DiMa Heights-----37

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 19 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area961 sq m
Named landowners1
LandownerVillageDistrict
Chalamani M Balaraju--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.28 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 8.48 cr-
On-site expenditure-Consultants FeesRs 79.88 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKHALEEL AHMED
EngineerSHAHID ZAHID KHAN
Chartered AccountantKIRAN K KENIKAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed120

As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/350/PR/300623/006024 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
DIMA Heights Letter Response to all Query - LetterFile: DIMA Heights Points- Reply.pdf19 Jun 2023
Upload CA certificate in CA letter headFile: CA Certificate Dima Height.pdf19 Jun 2023
Upload profit and loss account and balance sheet, 2019-20 with CA UDIN along withFile: ITR 2019-20 with Udin.pdf19 Jun 2023
Upload profit and loss account and balance sheet 2020-21 with CA UDIN along withFile: ITR 2020-21 with UDIN.pdf19 Jun 2023
Upload profit and loss account and balance sheet 2021-22 with CA UDIN along withFile: ITR 2021-22 with Udin.pdf19 Jun 2023
The promoter not uploaded conversion order for sy.no. 83A2 Hence not Ok.File: NA Order Clarification.pdf19 Jun 2023
Upload CDP map showing the proposed site. (not Uploaded)File: CDP MAP Dima HEights.pdf19 Jun 2023
Upload relinquishment deed (Road widening area) (not Uploaded)File: Relishment Deed Road Purpose.pdf19 Jun 2023
Height of the building mentioned in the development details page is not matching with the sanctionFile: Height Clarification.pdf19 Jun 2023
Once again not uploaded. Please upload the NOC issued by Power supply authority along with the copyFile: Electricity Suppy along with receipt.pdf19 Jun 2023
Once again not uploaded. Please upload the brief estimated cost of construction for civil worksFile: Civil Engineer Estimate.pdf19 Jun 2023
Uploaded proforma of Allotment letter is cropped up and not in full copy. Therefore Please uploadFile: allotment letter.pdf19 Jun 2023
ALLOTMENT LETTERFile: ALLOTMENT LETTER.pdf19 May 2023
CA CertificateFile: CA Certificate Form 1 (1).pdf19 May 2023
engineer certificateFile: engineer certificate.pdf19 May 2023
LAYOUTFile: LAYOUT FINAL.pdf19 May 2023
mapFile: VILLAGE MAP (2).jpeg13 Apr 2023
water nocFile: Water NOC Dima Heights (1).pdf13 Apr 2023
AGREEMENT TO SALEFile: Agreement of Sale Proforma final.pdf14 Mar 2023
area statement for commercial cum residence Dima Heights (1)File: area statement for commercial cum residence Dima Heights (1).pdf14 Mar 2023
DOCUMENTFile: DOCUMENT.jpeg14 Mar 2023
Guidence VAlue Dima HeightsFile: Guidence VAlue Dima Heights.pdf14 Mar 2023
ITR 21-22File: ITR 21-22.pdf14 Mar 2023
ITR 2019-20File: ITR 2019-20.pdf14 Mar 2023
ITR 2020-21File: ITR 2020-21.pdf14 Mar 2023
VILLAGE MAPFile: VILLAGE MAP (2).jpeg14 Mar 2023
WATER NOCFile: Water NOC Dima Heights (1).pdf14 Mar 2023
Agreement of Sale Proforma finalFile: Agreement of Sale Proforma final.pdf14 Feb 2023
CA Certificate Form 1File: CA Certificate Form 1 (1).pdf14 Feb 2023
Chalamani ITR AY 2019-20File: Chalamani ITR AY 2019-20.pdf14 Feb 2023
Chalamani ITR AY 2020-21File: Chalamani ITR AY 2020-21.pdf14 Feb 2023
Chamani ITR AY 2021-22File: Chamani ITR AY 2021-22.pdf14 Feb 2023
engineer certificateFile: engineer certificate.pdf14 Feb 2023
NA OrderFile: NA Order.pdf14 Feb 2023
Road Widening Point No 6File: Road Widening Point No 6.pdf14 Feb 2023
stpFile: stp.pdf14 Feb 2023
AGREEMENT OF SALEFile: Agreement of Sale Proforma final.pdf12 Jan 2023
APPROVED PLANFile: APPROVED PLAN- JULIET-KARWAR.pdf12 Jan 2023
ITRFile: Chamani ITR AY 2021-22.pdf12 Jan 2023
COMBINED PROPERTYFile: COMBINED PROPERTY ORDER 1.pdf12 Jan 2023
CTS MAPFile: CTS MAP.jpg12 Jan 2023
CTSFile: CTS.jpg12 Jan 2023
CTS 1-10File: CTS1-10.pdf12 Jan 2023
FORM 3File: FORM NO 3 (1).jpg12 Jan 2023
FORM 3File: FORM NO 3 (2).jpg12 Jan 2023
FORM 3File: Form No 3 DiMa Heights.pdf12 Jan 2023
LAYOUT COPYFile: LAYOUT COPY.jpg12 Jan 2023
Legal ScrutinyFile: Legal Scrutiny DiMa Heights.pdf12 Jan 2023
PERMISSION APPROVED PLANFile: Premission Approval Plan.pdf12 Jan 2023
DOCUMENTSFile: signedpdfnew (9).pdf12 Jan 2023
NA ORDERFile: NA ORDER COPY 1.pdf12 Jan 2023
RTC, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Mutation, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Encumbrance Certificate, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Conversion/Alienation Order, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Sale/Title/Gift Deed, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Khatha, survey 83A2,83A1A / 4B/13-2-20-28C / 3950,3951,3952,3953,3954,4046-
Registration CertificateFile: GST.pdf-
Certificate issued by CA Form 1File: CA Certificate Form 1 (1).pdf-
Certificate issued by Engineer Form 3File: engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION.pdf-
Certificate from Chartered AccountFile: CA Certificate Form 1 (1).pdf-
Balance Sheet 2021 - 2022File: ITR 21-22_compressed (1).pdf-
Balance Sheet 2020 - 2021File: ITR 2020-21_compressed.pdf-
Balance Sheet 2019 - 2020File: ITR 2019-20_compressed.pdf-
Audited Profit and Loss Statement 2021 - 2022File: ITR 21-22_compressed (1).pdf-
Audited Profit and Loss Statement 2020 - 2021File: ITR 2020-21_compressed.pdf-
Audited Profit and Loss Statement 2019 - 2020File: ITR 2019-20_compressed.pdf-
Cash Flow Statement 2021 - 2022File: ITR 21-22_compressed (1).pdf-
Cash Flow Statement 2020 - 2021File: ITR 2020-21_compressed.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 21-22_compressed (1).pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21_compressed.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2019-20_compressed.pdf-
COMMENCEMENT CERTIFICATE-
Temporary electric Bill Dima-
LAYOUT FINAL-
LAYOUT FINAL-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one has not
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep DIMA Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

2 kmDIMA HeightsOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Om Ganeshaya Namah Constructions

Om Ganeshaya Namah Constructions has 3 registrations on RERA Karnataka, including DIMA Heights and NAKSHATRA APARTMENT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if DIMA Heights is delayed beyond 8 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DIMA Heights?

The registered promoter entity is Om Ganeshaya Namah Constructions, a proprietorship firm as per the filing. Its GSTIN 29ARPPC4052Q1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DIMA Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DIMA Heights?

The professionals named in the filing: Architect: KHALEEL AHMED; Engineer: SHAHID ZAHID KHAN; Chartered Accountant: KIRAN K KENIKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIMA Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIMA Heights. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIMA Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.