Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
17 of 17Construction stages doneevery applicable stage filed complete
16 of 36Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 134 documents Report an error

DHIRAAN LOTUS is a Residential/Group Housing project by DHIRAAN INFRASTRUCTURE PVT. LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/150125/007383 on 15 Jan 2025. Possession is promised by 31 Dec 2027. 20 of the 36 units on this registration are recorded sold or booked, and 17 of 17 construction stages are filed complete.

At a glance

Project

  • NameDHIRAAN LOTUS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/150125/007383
  • ReraGenie IDRG-KA-75150

Builder

  • NameDHIRAAN INFRASTRUCTURE PVT. LTD
  • Entity typeCompany
  • CINU70100KA2015PTC079292
  • GSTIN29AAFCD3114N1Z1
  • Authorized SignatorySURESH B S
  • Managing DirectorSURESH B S
  • DirectorsSURESH B S, REKHA B G
  • Project HeadSURESH B S
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Jan 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed134 files

Current status

56%20 of 36 units booked
73.0%Of the estimated cost spent so far

Figures as on 8 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 17 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)Not applicable
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities44

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes100%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes100%
Street LightingNoNot applicable
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes100%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes100%
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes100%
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes100%
Air ConditioningNoNot applicable
Multipurpose HallNoNot applicable
Children’s Play areaNoNot applicable
Toddlers’ Swimming poolNoNot applicable
Rainwater HarvestingNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes100%
Outer WallYes100%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes100%
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
Indrani--
Venkatesh--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.14 cr
Cost incurredRs 7.40 cr
Spent of the estimate73.03%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 8.20 crRs 5.74 cr
Payment of taxesRs 84.00 lakh-
Administrative CostsRs 65.00 lakh-
On-site expenditure-Site OverheadRs 45.00 lakh-
On-site expenditure-Consultants Fees-Rs 98.46 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSrimathi J Adiga
EngineerVishnu Kumar
Chartered AccountantMahaveer Bhansali Jain

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed134

As listed on the registration, under the names the promoter filed them with; the newest 80 of 134 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/150125/007383 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form - 4, CA rera QR - DL - Jun26.pdf8 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form5,Q1,2026-27,Dhiraan Lotus.pdf8 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FOREM-6 DHIRAAN LOTUS 30-06-2026.pdf8 Jul 2026
Q1 2026-27 Water supply and sewage board8 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)8 Jul 2026
Q1 2026-27 KPTCL- BESCOM8 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form - 4, CA rera QR - DL - Mar26 signed.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form5, Q4,2025-26,Dhiraan Lotus.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6 DHIRAAN LOTUS 31-03-2026.pdf10 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form - 4, Q3.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5,Q3.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6 Q3.pdf13 Jan 2026
Form-6 DHIRAAN LOTUS 30-10-2024File: 1 Form-6 DHIRAAN LOTUS 30-10-2024.pdf9 Dec 2024
FORM-3 DHIRAAN LOTUSFile: 2 FORM-3 DHIRAAN LOTUS.pdf9 Dec 2024
Common_Area_and_AmenitiesFile: 3 Common_Area_and_Amenities.pdf9 Dec 2024
Clarification on STP DesignFile: 5 Clarification on STP Design.pdf9 Dec 2024
Land Cost Calculation SheetFile: 6 Land Cost Calculation Sheet.jpeg9 Dec 2024
Cash flow Statement 23 -24File: 7 Cash flow Statement 23 -24.pdf9 Dec 2024
Cash Flow Statement 22-23File: 8 Cash Flow Statement 22-23.pdf9 Dec 2024
Cash Flow statement 21-22File: 9 Cash Flow statement 21-22.pdf9 Dec 2024
Dhiraan ITR 23-24File: 1 Dhiraan ITR 23-24.pdf9 Dec 2024
Dhiraan Financials FY 2023-24File: 2 Dhiraan Financials FY 2023-24.pdf9 Dec 2024
Director Report FY 202223File: 3 Director Report FY 202223.pdf9 Dec 2024
Audit Report FY 202223File: 4 Audit Report FY 202223.pdf9 Dec 2024
Dhiraan ITR 202223File: 5 Dhiraan ITR 202223.pdf9 Dec 2024
Balance Sheet and PL FY 202223 with UDINFile: 6 Balance Sheet and PL FY 202223 with UDIN.pdf9 Dec 2024
Director Report FY 202122File: 7 Director Report FY 202122.pdf9 Dec 2024
Balance Sheet and PL FY 202122 with UDINFile: 8 Balance Sheet and PL FY 202122 with UDIN.pdf9 Dec 2024
Audit Report FY 202122File: 9 Audit Report FY 202122.pdf9 Dec 2024
Dhiraan ITR 202122File: 10 Dhiraan ITR 202122.pdf9 Dec 2024
Dhiraan ITR 202021File: 11 Dhiraan ITR 202021.pdf9 Dec 2024
Audit Report FY 202021File: 12 Audit Report FY 202021.pdf9 Dec 2024
Director Report FY 202021File: 13 Director Report FY 202021.pdf9 Dec 2024
Balance Sheet and PL FY 202021 with UDINFile: 14 Balance Sheet and PL FY 202021 with UDIN.pdf9 Dec 2024
Source of Funds with supporting docsFile: 10 Source of Funds with supporting docs.pdf9 Dec 2024
Quarterly filing clarificationFile: 11 Quarterly filing clarification.pdf9 Dec 2024
EC SY NO 119-4File: EC SY NO 119-4.pdf9 Dec 2024
EC SY NO 119-3File: EC SY NO 119-3.pdf9 Dec 2024
ECC-07112024-6283031File: ECC-07112024-6283031.pdf9 Dec 2024
Vibaga Patra 1File: 1 Vibaga Patra 1.pdf9 Dec 2024
PREMILINARY REPORTFile: 2 PREMILINARY REPORT.pdf9 Dec 2024
Lotus Mother DeedFile: 3 Lotus Mother Deed.pdf9 Dec 2024
Aakarband LotusFile: 4 Aakarband Lotus.pdf9 Dec 2024
Lotus Hiss and PhodiFile: 5 Lotus Hiss and Phodi.pdf9 Dec 2024
MR COPYFile: MR COPY.pdf9 Dec 2024
RTC, survey 199/3-
Mutation, survey 199/3-
Encumbrance Certificate, survey 199/3-
Conversion/Alienation Order, survey 199/3-
JDA, survey 199/3-
Khatha, survey 199/3-
RTC, survey 199/4-
Mutation, survey 199/4-
Encumbrance Certificate, survey 199/4-
Conversion/Alienation Order, survey 199/4-
JDA, survey 199/4-
Khatha, survey 199/4-
Registration CertificateFile: Incorporation Certificate.pdf-
Memorandum of AssociationFile: MOA.pdf-
Article of AssociationFile: AOA.pdf-
GST CertificateFile: DHIRAAN INFRASTRUCTURE PVT LTD GSTRCF.pdf-
Organization StructureFile: DHIRAAN Organisation stru.jpeg-
Certificate issued by CA Form 1File: Form 1 new - Dhiraan Lotus.pdf-
Certificate issued by Engineer Form 3File: 2 FORM-3 DHIRAAN LOTUS.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit Lotus.pdf-
Certificate from Chartered AccountFile: Form 1 new - Dhiraan Lotus.pdf-
Balance Sheet 2023 - 2024File: Not Avaialable.jpg-
Balance Sheet 2022 - 2023File: Balance Sheet and PL FY 202223 with UDIN.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet and PL FY 202122 with UDIN.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Balance Sheet and PL FY 202223 with UDIN.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Balance Sheet and PL FY 202122 with UDIN.pdf-
Director's Report 2022 - 2023File: Director Report FY 202223.pdf-
Director's Report 2021 - 2022File: Director Report FY 202122.pdf-
Auditor's Report 2022 - 2023File: Audit Report FY 202223.pdf-
Auditor's Report 2021 - 2022File: Audit Report FY 202122.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Dhiraan ITR 202223.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Dhiraan ITR 202122.pdf-

How this compares with Bengaluru Urban

56%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DHIRAAN LOTUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: DHIRAAN INFRASTRUCTURE PVT. LTD

DHIRAAN INFRASTRUCTURE PVT LTD has 4 registrations on RERA Karnataka, including DHIRAAN URBAN FOREST and Dhiraan Northbrook. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DHIRAAN LOTUS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DHIRAAN LOTUS?

The registered promoter entity is DHIRAAN INFRASTRUCTURE PVT. LTD, a company as per the filing. Its CIN U70100KA2015PTC079292 and GSTIN 29AAFCD3114N1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DHIRAAN LOTUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DHIRAAN LOTUS?

The professionals named in the filing: Architect: Srimathi J Adiga; Engineer: Vishnu Kumar; Chartered Accountant: Mahaveer Bhansali Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHIRAAN LOTUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHIRAAN LOTUS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHIRAAN LOTUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.