Home / Browse projects / Bengaluru Urban, Karnataka / DHATRI ULTIMA

Registration approved No litigation declared Residential/Group Housing project

DHATRI ULTIMA

By DHATRI VENTURES

RG-KA-51019 · RERA PRM/KA/RERA/1251/472/PR/291022/005377 · Last updated on RERA Karnataka portal: 19 Oct 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Apr 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 144 documents Report an error

DHATRI ULTIMA is a Residential/Group Housing project by DHATRI VENTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/291022/005377 on 29 Oct 2022. Possession is promised by 29 Apr 2025.

At a glance

Project

  • NameDHATRI ULTIMA
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/291022/005377
  • ReraGenie IDRG-KA-51019

Builder

  • NameDHATRI VENTURES
  • Entity typePartnership Firm
  • GSTIN29AANFD0869K1ZU
  • Authorized SignatoryVENU GOPALA REDDY NV

Key dates

this monthRegisteredOct 2022PromisedApr 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Oct 2022
  • Promised completion29 Apr 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed144 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---18018

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 19 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area758 sq m
Named landowners2
LandownerVillageDistrict
C.DINAKAR--
C.MURALI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.84 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.38 cr-
Payment of taxesRs 13.27 lakh-
On-site expenditure-Salaries of workersRs 10.00 lakh-
On-site expenditure-Site OverheadRs 10.00 lakh-
On-site expenditure-Consultants FeesRs 7.50 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectZEPHYR CONSULTANTS AND ENGINEERS
EngineerZEPHYR CONSULTANTS AND ENGINEERS
Chartered AccountantCA Yogananda Prakash Reddy,

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed144

As listed on the registration, under the names the promoter filed them with; the newest 80 of 144 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/291022/005377 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
SUPPLEMENTARY PARTNERSHIP DEEDFile: SUPPLEMENTARY PARTNERSHIP DEED.pdf19 Oct 2022
BESCOM NOCFile: BESCOM NOC.pdf19 Oct 2022
UPDATED CA CERTIFICATEFile: Form-Reg - 1, Chartered Accountant (Reg) of Dhatri Ultima.pdf24 Sep 2022
UPDATED BANK DETAILS AND OTHER SALE AGREEMENTFile: AGREEMENT TO SELL DHATRI VENTURES (1).pdf24 Sep 2022
DECLARATION BESCOM WITH STAMP PAPERFile: DECLARATION BESCOM.pdf24 Sep 2022
DECLARATION BWSSB WITH STAMP PAPERFile: DECLARATION BWSSB.pdf24 Sep 2022
Dhatri Ultima CA CERTIFICATEFile: Dhatri Ultima CA CERTIFICATE.pdf3 Sep 2022
Clarification Conversion OrderFile: Clarification Conversion Order.pdf3 Sep 2022
e CDP Plan attached showing the project land coming in the preview of residential unit as per BangaFile: 307Yelahanka _merged.pdf3 Sep 2022
AMALGAMATION KATHAFile: AMALGAMATION KATHA.pdf3 Sep 2022
C DINAKAR KATHAFile: C DINAKAR KATHA.pdf3 Sep 2022
C MURALI KATHAFile: C MURALI KATHA.pdf3 Sep 2022
Land Cost ClarificationFile: LAND COST CLARIFICATION.pdf3 Sep 2022
AGREEMENT TO SELL DHATRI VENTURESFile: AGREEMENT TO SELL DHATRI VENTURES.pdf3 Sep 2022
BESCOM DECLARATIONFile: BESCOM DECLARATION.pdf3 Sep 2022
BWSSB DECLARATIONFile: BWSSB DECLARATION.pdf3 Sep 2022
Upload chartered accountant certificate in prescribed format form-01File: RERA_Dhatri Ventures CA CERTIFICATE.pdf5 Aug 2022
need conversion orderFile: CONVERSION CLARIFICATION ORDER.pdf5 Aug 2022
C MURALI KATHAFile: C MURALI KATHA.pdf5 Aug 2022
C DINAKAR KATHAFile: C DINAKAR KATHA.pdf5 Aug 2022
AMALGAMATION KATHAFile: AMALGAMATION KATHA.pdf5 Aug 2022
MURALI SALE DEEDFile: MURALI SALE DEED.pdf5 Aug 2022
EC LAND FROM 01/04/2004 TO 04/08/2022 WITH JD REFLECTING FOR SITE NO 17, 18 19 & 20File: EC SITES AND JD REFLECTING.pdf5 Aug 2022
EC FOR SY NOFile: EC SY NO.pdf5 Aug 2022
AFFIDAVITE BY LANDOWNERS WITH LATEST PRESCRIBED FORMAT BY RERAFile: AFFIDAVITE JD.pdf5 Aug 2022
GPA MENTIONED IN SEARCH REPORTFile: GPA.pdf5 Aug 2022
lease Refer the page no-11 marked to ATTURFile: GUIDANCE_VALUE_OF_PROPERTY_BU_SRO.pdf5 Aug 2022
COMPLETE BUILDING LICENCE AND PLANFile: LICENCE WITH PLAN.pdf5 Aug 2022
single plot layout, single plot layout Plan. AND Upload the Extract of master plan CLARIFICATIONFile: DEVELOPMENT PLAN DECLARATION ORDER.pdf5 Aug 2022
SALE AGREEMENT DRAFT WITH AMENITIES SPECIFICATION AND COMPLETION DATEFile: SALE AGREEMENT DRAFT WITH AMENITIES SPECIFICATION AND COMPLETION DATE.pdf5 Aug 2022
BESCOM DECLARATIONFile: BESCOM DECLARATION.pdf5 Aug 2022
BWSSB DECLARATIONFile: BWSSB DECLARATION.pdf5 Aug 2022
FIRM REGISTRATION CERTIFICATEFile: FIRM REGISTRATION CERTIFICATE.jpeg14 Jul 2022
Dhatri Ultima CA CERTIFICATEFile: Dhatri Ultima CA CERTIFICATE.pdf14 Jul 2022
PlanFile: Plan.pdf14 Jul 2022
BANK CHEQUEFile: BANK CHEQUE.jpeg14 Jul 2022
SALE DEED MURALIFile: SALE DEED MURALI.pdf14 Jul 2022
SALE DEED DINKARFile: SALE DEED DINKAR.pdf14 Jul 2022
EC AS ON 12.07.2022File: EC.pdf14 Jul 2022
FORM B WITH PROJECT COMPLETION DATEFile: FORM B.pdf14 Jul 2022
DHATRI ULTIMA SEARCH REPORTFile: SEARCH REPORT.pdf14 Jul 2022
GUIDANCE VALUE OF PROPERTY BU SROFile: GUIDANCE VALUE OF PROPERTY BU SRO.pdf14 Jul 2022
AFFIDAVIT NON LIIGATIONFile: AFFIDAVIT NON LIIGATION.pdf14 Jul 2022
DHATRI ULTIMA BUILDING LICENCEFile: BUILDING LICENCE.pdf14 Jul 2022
DHATRI ULTIMA SINGLE PLOT LAYOUTFile: DHATRI ULTIMA SINGLE PLOT LAYOUT.pdf14 Jul 2022
SINGLE PLOT LAYOUT PLANFile: SINGLE PLOT LAYOUT PLAN.pdf14 Jul 2022
COMMENCEMENT CERTIFICATEFile: COMMENCEMENT CERTIFICATE.pdf14 Jul 2022
DHARI ULTIMA VILLAGE MAPFile: DHARI ULTIMA VILLAGE MAP.pdf14 Jul 2022
EXTRACT OF MASTER PLANFile: EXTRACT OF MASTER PLAN.pdf14 Jul 2022
AREA DETAILSFile: AREA DETAILS.pdf14 Jul 2022
COMMAN AREA DETAILSFile: COMMAN AREA DETAILS.pdf14 Jul 2022
Dhatri Ultima CA CERTIFICATEFile: Dhatri Ultima CA CERTIFICATE.pdf14 Jul 2022
SECTION 3(1) NOTARIZED AFFIDAVITFile: SECTION 3(1) NOTARIZED AFFIDAVIT.pdf14 Jul 2022
Proforma Sale AgreementFile: Proforma Sale Agreement.pdf14 Jul 2022
BESCOM PAYMENT RECEIPTFile: BESCOM PAYMENT RECEIPT.pdf14 Jul 2022
BWSSBFile: BWSSB.pdf14 Jul 2022
STP LINE DRAWINGFile: STP LINE DRAWING.pdf14 Jul 2022
SPECIFICATIONSFile: SPECIFICATIONS.pdf14 Jul 2022
RTC, survey 38/19/20/19/20,38/17/18/17/18-
Mutation, survey 38/19/20/19/20,38/17/18/17/18-
Encumbrance Certificate, survey 38/19/20/19/20,38/17/18/17/18-
JDA, survey 38/19/20/19/20,38/17/18/17/18-
Khatha, survey 38/19/20/19/20,38/17/18/17/18-
Registration CertificateFile: FIRM REGISTRATION CERTIFICATE.jpeg-
Partnership DeedFile: Partnership Deed_compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-Reg - 1, Chartered Accountant (Reg) of Dhatri Ultima_compressed.pdf-
Certificate issued by Architect Form 2File: ARCHITECTE CERTIFICATE_compressed.pdf-
Certificate issued by Engineer Form 3File: Form 3 Dhatri Ultima ENGINEER CERTIFICATE.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT NON LIIGATION.pdf-
Certificate from Chartered AccountFile: Form-Reg - 1, Chartered Accountant (Reg) of Dhatri Ultima_compressed.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2021-22.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet 2020-21.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2019-20.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L 2021-22.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DHATRI ULTIMA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDHATRI ULTIMAOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: DHATRI VENTURES

DHATRI VENTURES has 1 registration on RERA Karnataka, including DHATRI ULTIMA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DHATRI ULTIMA is delayed beyond 29 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DHATRI ULTIMA?

The registered promoter entity is DHATRI VENTURES, a partnership firm as per the filing. Its GSTIN 29AANFD0869K1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DHATRI ULTIMA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DHATRI ULTIMA?

The professionals named in the filing: Architect: ZEPHYR CONSULTANTS AND ENGINEERS; Engineer: ZEPHYR CONSULTANTS AND ENGINEERS; Chartered Accountant: CA Yogananda Prakash Reddy,. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHATRI ULTIMA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHATRI ULTIMA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHATRI ULTIMA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.