Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Definer Dolce Vita is a Residential/Group Housing project by Definer Properties Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/181024/007150 on 18 Oct 2024. Possession is promised by 4 Nov 2029. 40 of the 105 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameDefiner Dolce Vita
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560064
- Pincode560064
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/181024/007150
- ReraGenie IDRG-KA-40849
Builder
- NameDefiner Properties Private Limited
- Entity typeCompany
- CINU45100KA2022PTC164041
- GSTIN29AAJDC4515F1ZO
- Authorized SignatorySagiraju Ravivarma
- DirectorsSagiraju Ravivarma, Sagiraju Ravivarma, Savitha
- Project HeadShankarappa Mudigoudar
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Oct 2024
- Promised completion4 Nov 2029
- Revised completionNone
- Buildings1 building record
- Documents filed221 files
Current status
Figures as on 24 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dolce Vita | - | - | - | 105 | 0 | 105 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 24 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 99%.
Building: 29% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 50% |
| Retaining wall (All types) | 99% |
| RCC or MS Framed structure | 50% |
| Masonry Construction | 15% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 10% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 24 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 50% |
| Sewage and Drainage System | Yes | 35% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 3% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 30% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 20% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 10% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 78% |
| Parks & Tree planting | Yes | 2% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 5% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 50% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 2% |
| Indoor Sports facility | Yes | 10% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 25% |
| Lifts | Yes | 25% |
| Corridor/Lobbies | Yes | 20% |
| Fire escapes | Yes | 20% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 10% |
| Basement | Yes | 90% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Anantharamaiah L | - | - |
| Anantharamaiah L | - | - |
| Anantharamaiah L | - | - |
| Anantharamaiah L | - | - |
| Anantharamaiah L | - | - |
| Anantharamaiah L | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 78.32 cr | Rs 41.69 cr |
| On-site expenditure-Site Overhead | Rs 2.05 cr | - |
| On-site expenditure-Salaries of workers | Rs 1.32 cr | Rs 50.24 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 1.28 cr | Rs 1.80 lakh |
| On-site expenditure-Consultants Fees | Rs 46.05 lakh | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 28.01 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Excel Architects. |
| Engineer | Nixit Consultants (OPC) Pvt Ltd |
| Chartered Accountant | T Sriram,Mehta & Tadimalla |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00601/2026 | - | Definer Properties Private Limited | 26/05/2026 |
Documents filed221
As listed on the registration, under the names the promoter filed them with; the newest 80 of 221 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/181024/007150 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 24 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: EXCEL ARCHITECTS 07-10-2026.pdf | 24 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 24 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 24 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 24 Oct 2026 |
| Q2 2026-27 Fire and Safety | 24 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 24 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 24 Oct 2026 |
| structural engineer licence of engineer who has signed the structural stability certificate.File: Ambrish BBMP certificate (1).pdf | 14 Oct 2026 |
| renewed BESCOM NOC-AffidavitFile: Affidavit -RERA.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,area details etc.File: 1st,2nd,3rd,4th,5th_compressed.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: 6 to 13th Floor Plan_compressed.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: 14th and Terrace_compressed.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: Basement Floor Plan_compressed.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: Site Plan_compressed.pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: Section and Elevation_compressed (1).pdf | 14 Oct 2026 |
| approved plans showing the index which includes Floor details,units details,aFile: Ground Floor_compressed.pdf | 14 Oct 2026 |
| foundation drawing showing the number of floors considered for design.File: R0-COLUMN RAFT MARKING LAYOUT.pdf | 14 Oct 2026 |
| foundation drawing showing the number of floors considered for design.File: R0-GENERAL NOTES.pdf | 14 Oct 2026 |
| sold and unsold units details with project name and address along with signature.File: DDV - Revised Unit Details (1).pdf | 3 Oct 2026 |
| revised and elaborate Structural stability certificate mentioning the design criteria (for how manyFile: Stability_Dolce Vita.pdf | 3 Oct 2026 |
| the engineer licence of engineer who has signed the engineer certificate form-6.File: Engineer License.pdf | 3 Oct 2026 |
| sold and unsold units details are not matching to total units,kindly upload the abstract of sold andFile: Abstract of Sold and Unsold Unit Details.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Dolce Vita (Airport Authority NOC).pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Fire NOC Dolce Vita.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Dolce Vita Pollution control board NOC.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Geological - NOC Dolce Vita.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Water Noc- Dolce Vita.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: BSNL NOC- DOLCE VITA.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: BESCOM NOC.pdf | 3 Oct 2026 |
| NOC's for incresed load.File: Environmental Clearance.pdf | 3 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q1- Form 4 CA.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q-Form 5 AC.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q1-Form 6 CE.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q1 2026-27 Fire and Safety | 14 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 14 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM -4.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM -5.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6.pdf | 10 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 10 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 10 Apr 2026 |
| Q4 2025-26 Fire and Safety | 10 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 10 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 10 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q3 CA.pdf | 19 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q3 A C.pdf | 19 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q3 CE.pdf | 19 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 19 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 19 Jan 2026 |
| Q3 2025-26 Fire and Safety | 19 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 19 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 19 Jan 2026 |
| Query dated 15.10.24 explanationFile: RERA.pdf | 16 Oct 2024 |
| FINANCIAL STRENGTH TO RAISEFile: RERA Letter.pdf | 10 Oct 2024 |
| Source of FundsFile: BajajSanction.pdf | 10 Oct 2024 |
| Site E-156File: Saledeed E -156.pdf | 10 Oct 2024 |
| Site E-21File: manyata Sale E-21.pdf | 10 Oct 2024 |
| Sale deed VokkaleriFile: SALE DEED 289 vokkaleri.pdf | 10 Oct 2024 |
| Sale Deed VokkaleriFile: SALE DEED OF VARADARJ391.pdf | 10 Oct 2024 |
| Sale Deed VokkaleriFile: sale deed SY NO 291 VENKATESHACHARYA VOKELARI 005.pdf | 10 Oct 2024 |
| Bank affidavitFile: RERA Affidavit.pdf | 1 Oct 2024 |
| Rera fee receiptFile: RERA FEES DOLCE VITA.pdf | 1 Oct 2024 |
| MOAFile: dv moa.pdf | 25 Sep 2024 |
| ITRFile: ITR.pdf | 25 Sep 2024 |
| Layout planFile: Site Plan_compressed.pdf | 25 Sep 2024 |
| auditors reportFile: Auditors Report.pdf | 25 Sep 2024 |
| Cash flowFile: Cash flow.pdf | 25 Sep 2024 |
| CA DetailsFile: Self Attested Membership Certificate- Varun (1).pdf | 25 Sep 2024 |
| RTC 56-9File: RTC 56-9.pdf | 25 Sep 2024 |
| RTC 116-5File: RTC 116-5.pdf | 25 Sep 2024 |
| RTC 116-6File: RTC 116-6.pdf | 25 Sep 2024 |
| RTC 116-11File: RTC 116-11.pdf | 25 Sep 2024 |
| RTC 116-12File: RTC 116-12.pdf | 25 Sep 2024 |
| RTC 116-13File: RTC 116-13.pdf | 25 Sep 2024 |
| MR CopyFile: Mutation.pdf | 25 Sep 2024 |
| Litigation AffidavitFile: non litigation.pdf | 25 Sep 2024 |
| ECFile: EC latest.pdf | 25 Sep 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Definer Dolce Vita on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
Sattva Lumina
Sattva Resi Private Limited
Brigade Eternia
Brigade Enterprises Ltd
Nikoo Homes V - Phase - 1
Bhartiya Urban Private Limited
GODREJ AVELINE
GODREJ SSPDL GREEN ACRES PRIVATE LIMITED
ORCHID SALISBURY
GOYAL HARIYANA ENTERPRISES
See every Bengaluru Urban project, with the district possession charts
Builder: Definer Properties Private Limited
Definer Properties Private Limited has 1 registration on RERA Karnataka, including Definer Dolce Vita. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Definer Dolce Vita is delayed beyond 4 Nov 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Definer Dolce Vita?
The registered promoter entity is Definer Properties Private Limited, a company as per the filing. Its CIN U45100KA2022PTC164041 and GSTIN 29AAJDC4515F1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Definer Dolce Vita?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Definer Dolce Vita?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Definer Dolce Vita?
The professionals named in the filing: Architect: Excel Architects.; Engineer: Nixit Consultants (OPC) Pvt Ltd; Chartered Accountant: T Sriram,Mehta & Tadimalla. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Definer Dolce Vita?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback