  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2021Possession promisedmoved 6 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

DAIWIK SPANDANA is a Residential/Group Housing project by DAIWIK HOUSING PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180627/001915 on 27 Jun 2018. Possession is promised by 30 Mar 2021. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameDAIWIK SPANDANA
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/180627/001915
  • ReraGenie IDRG-KA-45815

Builder

  • NameDAIWIK HOUSING PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109KA2013PTC069543
  • Authorized SignatoryB T NANJA REDDY
  • DirectorsB T NANJA REDDY, A NAGARAJA REDDY
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2018First promiseSep 2020Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Jun 2018
  • Promised completion30 Mar 2021
  • Revised completionRevised to 30 Mar 2021 (originally 30 Sep 2020)
  • Buildings2 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---31031
BLOCK B---31031

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesNoNot applicable
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,105 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS CHANDRA SHEKAR
EngineerM S THIMMA REDDY

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2020 → Mar 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180627/001915 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: CERTIFICATION OF INCORPORATION.pdf-
COMMENCEMENT LETTER-
LAYOUT PLAN-
APPROVED LAYOUT PLANS-
SPANDANA ABSOLUTE SALE DEED-
SPANDANA - AGREEMENT OF SALE-
SALE DEED AND RTC-
LAYOUT PLAN-
LAYOUT PLAN-
SPANDANA PROFORMA OF ALLOTMENT LETTER-
BROUCHER-SPANDANA-
NOC OF POLLUTIONS-
PROJECT SPECIFICATIONS-
EC-
KHATHA AND TAX PAID RECEIPT-
SPANDANA JDA & GPA & SHARING AGREEMENT-
CONVERTION KLR ACT 1961-
FIRE FORCE-
AIRPORT AUTHORITY-
BWSSB-
NOC OF POLLUTIONS-
STATE ENVIROMENT-
BSNL-
NEIGHBORING NOC-
Unnamed document-
URBAN LAND CEILING-
BMRCL-
ART & COMMISSIONS-
RAILWAY NOC-
DIST MAGISTRATE-
COASTAL AUTHORITY-
APPROVED LAYOUT PLANS-
APPROVED LAYOUT PLANS-
CONVERATION LETTER COPY-
Balance Sheet 2016 - 2017File: BALANCE SHEET FY 2016-17.pdf-
Balance Sheet 2015 - 2016File: BALANCE SHEET FY 15-16.pdf-
Balance Sheet 2014 - 2015File: BALANCE SHEET FY 14-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PROFIT AND LOSS FY 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L ACCOUNT FY 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P&L ACCOUNT FY 14-15.pdf-
Director's Report 2016 - 2017File: DIRECTORS REPORT.pdf-
Director's Report 2015 - 2016File: DIRECTOR REPORT FY 2015-16.pdf-
Director's Report 2014 - 2015File: DIRECTOR REPORT FY 2014-15.pdf-
Cash Flow Statement 2016 - 2017File: CASH FLOW FY 2016-17.pdf-
Cash Flow Statement 2015 - 2016File: CASH FLOW FY 2015-16.pdf-
Auditor's Report 2016 - 2017File: AUDITORS REPORTS.pdf-
Auditor's Report 2015 - 2016File: AUDIT REPORT FY 15-16.pdf-
Auditor's Report 2014 - 2015File: AUDIT REPORT FY 14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR FY 15-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: CASH FLOW FY 2014-15.pdf-
FORM B-
Prospectus/BrochureFile: BROUCHER SPANDANA.pdf-
Advertisement Copy 1File: Spandan Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180627_001915.xlsx-
Occupancy CertificateFile: OC - DAIWIK SPANDANA.pdf-
Completion certificateFile: OC - DAIWIK SPANDANA.pdf-
Registered Agreement of SaleFile: SALE AND CONSTRUCTION AGREEMENT.pdf-
Registered conveyance deed for an individual unitFile: ABSOLUTE SALE DEED UNIT NO.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 6 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DAIWIK SPANDANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDAIWIK SPANDANAOther 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: DAIWIK HOUSING PRIVATE LIMITED

DAIWIK HOUSING PRIVATE LIMITED has 3 registrations on RERA Karnataka, including DAIWIK SPARSH and DAIWIK SALVINA SAPPHIRE. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DAIWIK SPANDANA is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DAIWIK SPANDANA?

The registered promoter entity is DAIWIK HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U70109KA2013PTC069543 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DAIWIK SPANDANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DAIWIK SPANDANA?

The professionals named in the filing: Architect: S CHANDRA SHEKAR; Engineer: M S THIMMA REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DAIWIK SPANDANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DAIWIK SPANDANA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DAIWIK SPANDANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.