ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Construction of 1293 Dus at Kenchanapura Sy.No.63

Registration approved No litigation declared Residential/Group Housing project

Construction of 1293 Dus at Kenchanapura Sy.No.63

By Rajiv Gandhi Housing Corporation Limited

RG-KA-86021 · RERA PRM/KA/RERA/1251/310/PR/100822/005150

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 34 documents Report an error

Construction of 1293 Dus at Kenchanapura Sy.No.63 is a Residential/Group Housing project by Rajiv Gandhi Housing Corporation Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/100822/005150 on 10 Aug 2022. Possession is promised by 20 Feb 2025.

At a glance

Project

  • NameConstruction of 1293 Dus at Kenchanapura Sy.No.63
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/100822/005150
  • ReraGenie IDRG-KA-86021

Builder

  • NameRajiv Gandhi Housing Corporation Limited
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryExecutive Engineer
  • Other registrations18 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2022PromisedFeb 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Aug 2022
  • Promised completion20 Feb 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-A---6380638
Block-B---2250225
Block-C---2640264
Block-D---1660166

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Rajiv Gandhi Housing Corporation Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 181.63 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 181.63 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACS Design Consulting Pvt. Ltd.
EngineerACS Design Consulting Pvt. Ltd.
Chartered Accountantfbffjzf

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed34

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/100822/005150 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 63-
Mutation, survey 63-
Encumbrance Certificate, survey 63-
Conversion/Alienation Order, survey 63-
Khatha, survey 63-
Registration CertificateFile: Registration Change of Company name & address.jpg-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Balance Sheet 2019 - 2020File: Balance Sheet March 2021.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2019-20.jpg-
Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss 2021.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit & Loss.jpg-
Cash Flow Statement 2019 - 2020File: Cash Flow 2021.pdf-
Auditor's Report 2019 - 2020File: Auditor's report 2021.pdf-
Auditor's Report 2018 - 2019File: Audit 2019-20.jpg-
Income Tax Return Acknowledgement 2019 - 2020File: income tax 2020-21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Income tax report.jpg-
Kenchanapura approval-
Kenchanapura approved Development plan-
Kenchanapura approved Development plan_compressed-
Kenchanapura approved Development plan-
Kenchanapura approved Development plan_compressed-
Kenchanapura approved Development plan-
new technical specifications-
Kenchanapura approved Development plan_compressed-
Kenchanapura Structural Stability-
udd 10 ttp 2018-
Kenchanapura land documents-
GRAM_PANCHYAT_NOC_COPY (1) - Copy-
OrderCertificate (23) (1)-
airport NOC - Copy_compressed-
BSNL NOC - Copy_compressed-
Notice to proceed-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Construction of 1293 Dus at Kenchanapura Sy. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Rajiv Gandhi Housing Corporation Limited

RAJIV GANDHI HOUSING CORPORATION LIMITED has 19 registrations on RERA Karnataka, including J BHINGIPURA RGHCL and CM 1 Lakh Multi Storey Bengaluru Housing Prg. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Construction of 1293 Dus at Kenchanapura Sy.No.63 is delayed beyond 20 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 1293 Dus at Kenchanapura Sy.No.63?

The registered promoter entity is Rajiv Gandhi Housing Corporation Limited, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 1293 Dus at Kenchanapura Sy.No.63?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 1293 Dus at Kenchanapura Sy.No.63?

The professionals named in the filing: Architect: ACS Design Consulting Pvt. Ltd.; Engineer: ACS Design Consulting Pvt. Ltd.; Chartered Accountant: fbffjzf. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 1293 Dus at Kenchanapura Sy.No.63?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 1293 Dus at Kenchanapura Sy.No.63. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 1293 Dus at Kenchanapura Sy. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.