Registration approved No litigation declared Mixed Development project

Concorde Mayfair

By Concorde Housing Corporation Pvt Ltd

RG-KA-71483 · RERA PRM/KA/RERA/1251/309/PR/030524/006839 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Nov 2028Possession promisedno revision filed
3 of 18Construction stages donefurthest along: Retaining wall (All types), 85%
366 of 477Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 211 documents Report an error

Concorde Mayfair is a Mixed Development project by Concorde Housing Corporation Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/030524/006839 on 3 May 2024. Possession is promised by 30 Nov 2028. 111 of the 477 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.

At a glance

Project

  • NameConcorde Mayfair
  • TypeMixed Development
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/030524/006839
  • ReraGenie IDRG-KA-71483

Builder

  • NameConcorde Housing Corporation Pvt Ltd
  • Entity typeCompany
  • CINU70102KA2008PTC046886
  • GSTIN29AADCC4087F1ZK
  • Authorized SignatoryGangadhar S
  • ChairmanB S Nesara
  • DirectorsB S Nesara, R G Anil, R G Sunil, B S Shivarama
  • Project HeadAjaz Ahmed
  • Other registrations10 more →
  • Declared earlier projects12 →

Key dates

this monthRegisteredMay 2024PromisedNov 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 May 2024
  • Promised completion30 Nov 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed211 files

Current status

23%111 of 477 units booked
6.2%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---56056
B---54054
C---55055
D---52052
Commercial---0260260

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 85%.

Building: 39% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)80%
Retaining wall (All types)85%
RCC or MS Framed structure82%
Masonry Construction50%
Plastering inside , outside & Ceiling45%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification20%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing25%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)15%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes67%
Sewage and Drainage SystemYes60%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes30%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes60%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes45%
LiftsYes45%
Corridor/LobbiesYes45%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes50%
TerraceYes0%
Outer WallYes5%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership9

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,551 sq m
Named landowners9
LandownerVillageDistrict
Y G Vasanth--
Y G Murthy--
Y K Channappa--
Y N Ashwatha--
Y G Ravi Kumar--
Y M Nanjappa--
Y M Jayanna--
Y M Ramanna--
Suchitra S--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 222.89 cr
Cost incurredRs 13.84 cr
Spent of the estimate6.21%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 93.89 crRs 7.95 cr
On-site expenditure-Salaries of workersRs 49.11 crRs 75.42 lakh
On-site expenditure-Site OverheadRs 27.92 crRs 63.42 lakh
Payment of taxesRs 26.82 crRs 1.44 cr
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 19.38 crRs 18.89 lakh
On-site expenditure-Consultants FeesRs 2.25 crRs 2.14 cr
Payment of PremiumsRs 2.04 cr-
Payment of cessRs 1.48 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)-Rs 73.94 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIndrajit S Kembhavi
EngineerAjith Kumar D
Chartered AccountantP Vinod Kumar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed211

As listed on the registration, under the names the promoter filed them with; the newest 80 of 211 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/030524/006839 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM -4 Mayfair SD.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Mayfair - RERA FORM 5 09-10-2026.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: May fair engr.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Labour and Education Department15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CHCPL-Form 4 Mafair Q1.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Mayfair Arch Cert.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engr Cert.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Labour and Education Department15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rera - Q4 -Mayfair Sd.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Mayfair Arch Cert.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engn Cert.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Labour and Education Department15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Mayfair_F4_Q3_FY 25-26.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Arch Cert Mayfair.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engn Cert.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Labour and Education Department14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
Revised CA certificate with bank account deatilsFile: Revised CA certificate.pdf29 Apr 2024
Pass sheet of 30% bank accountFile: 862024- 30.pdf29 Apr 2024
Pass sheet of 70% bank accountFile: 882024- 70.pdf29 Apr 2024
Pass sheet of 100% bank accountFile: 872024- 100.pdf29 Apr 2024
Affidavit for bank accountFile: Affidavit for bank account.pdf29 Apr 2024
Certified area statement & Units break upFile: ARER STATEMENT - Common Area & Amenities.pdf29 Apr 2024
Certificate for source of fundsFile: CA Certificate_Investment_Mayfair.pdf29 Apr 2024
Balance sheet with schedule for 2020-21File: CHCPL_Balance Sheet with Schedule_FY 20-21.pdf29 Apr 2024
Balance sheet with schedule for 2021-22File: CHCPL_Balance Sheet with Schedule_FY 21-22.pdf29 Apr 2024
Balance sheet with schedule for 2022-23File: CHCPL_Balance Sheet with Schedule_FY 22-23.pdf29 Apr 2024
NAC for relinquishment deedFile: NAC FOR RELINQUISHMENT DEED - MAYFAIR.pdf29 Apr 2024
NOC_SEIAA for MOEF clearanceFile: NOC_SEIAA MOEF Clearance.pdf29 Apr 2024
Jakkur NOCFile: Revised Jakkur Aerodrome NOC.pdf29 Apr 2024
Title deed for SuchitraaaFile: Title deed for Suchitraa.pdf29 Apr 2024
Title deed for Sy No 141File: Title deed for Sy No 141_compressed.pdf29 Apr 2024
Title deed for Y G Vasanath, Y G MurthyFile: Title deed for Y G Vasanth and Y G Murthy and Y K Channappa_compressed.pdf29 Apr 2024
Title deed for Y K ChannappaFile: Title deed for Y K Channappa.pdf29 Apr 2024
Title deed for Y N AshwathaFile: Title deed for Y N Ashwatha.pdf29 Apr 2024
Village map showing the proposed siteFile: Village map.pdf29 Apr 2024
ClarificationsFile: Clarifications.pdf29 Apr 2024
Profit & loss statement with schedule for 2022-23File: CHCPL_Profit and Loss Schedule_FY 22-23.pdf29 Apr 2024
Profit & loss statement with schedule for 2021-22File: CHCPL_Profit and Loss Schedule_FY 21-22.pdf29 Apr 2024
Profit & loss statement with schedule for 2020-21File: CHCPL_Profit and Loss Schedule_FY 20-21.pdf29 Apr 2024
KSPCB fee payment receiptFile: KSPCB.pdf29 Apr 2024
Revised Jakkur NOCFile: Revised Jakkur Aerodrome NOC.pdf29 Apr 2024
Self attested KYC of B S NesaraFile: Self attested KYC of B S Nesara.pdf29 Apr 2024
Self attested KYC of B S ShivaramaFile: Self attested KYC of B S Shivarama.pdf29 Apr 2024
Self attested KYC of R G AnilFile: Self attested KYC of R G Anil.pdf29 Apr 2024
Self attested KYC of R G SunilFile: Self attested KYC of R G Sunil.pdf29 Apr 2024
Certified carpet area calculationsFile: Carpet area calculations.pdf29 Apr 2024
RTC, survey 140-
Mutation, survey 140-
Encumbrance Certificate, survey 140-
Conversion/Alienation Order, survey 140-
Sale/Title/Gift Deed, survey 140-
JDA, survey 140-

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date2 under way, not due yet3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Concorde AntaresSy No.26/1 & 26/2, Chikkabettahalli Village, Yelahanka Hobli, Bangalore North TalukOngoingDec 2028Not due yet
Concorde EquitySy No.134/2,135/1,135/2,135/4,137/3,139/1,140/2,151,155/1 and 155/2 of Maliyappanahalli Village, Kasaba Hobli, Malur Taluk,OngoingDec 2026Not due yet
Concorde EconexPlot No.27A, Doddanekundi Industrial Area, 1st Phase, Doddanekundi Village, K R Puram Hobli, Bangalore East TalukOngoingMar 2026Not delivered
Concorde AurigaSy No.31/2B, 34/1 & 35, Medihalli Village, Bidarahalli Hobli, Bangalore EastOngoingJun 2025Not delivered
Concorde LuxepolisNo.29, K P Puttanna Chetty RoadOngoingSep 2024Not delivered
Concorde Spring MeadowsSy No.5/1C & 7, Chikkasandra Village, Yeshwanthpura HobliCompleted-No date filed
Concorde Spring MeadowsSy No.5/1C & 7, Chikkasandra Village, Yeshwanthpura HobliCompleted-No date filed
Concorde EpitomeSy No.130/6, Kammasandra Village, Attibele Hobli, Anekal TalukCompleted-No date filed

How this compares with Bengaluru Urban

23%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Concorde Mayfair on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmConcorde MayfairOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Concorde Housing Corporation Pvt Ltd

Concorde Housing Corporation Pvt Ltd has 11 registrations on RERA Karnataka, including Concorde Mayfair and Concorde Spring Meadows. Its filings declare 12 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Concorde Mayfair is delayed beyond 30 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Concorde Mayfair?

The registered promoter entity is Concorde Housing Corporation Pvt Ltd, a company as per the filing. Its CIN U70102KA2008PTC046886 and GSTIN 29AADCC4087F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Concorde Mayfair?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Concorde Mayfair?

The professionals named in the filing: Architect: Indrajit S Kembhavi; Engineer: Ajith Kumar D; Chartered Accountant: P Vinod Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Concorde Mayfair?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Concorde Mayfair. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Concorde Mayfair to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.