Concorde Mayfair
By Concorde Housing Corporation Pvt Ltd
RG-KA-71483 · RERA PRM/KA/RERA/1251/309/PR/030524/006839 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Concorde Mayfair is a Mixed Development project by Concorde Housing Corporation Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/030524/006839 on 3 May 2024. Possession is promised by 30 Nov 2028. 111 of the 477 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.
At a glance
Project
- NameConcorde Mayfair
- TypeMixed Development
- Location
- Bengaluru North
- Bengaluru Urban
- 560064
- Pincode560064
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/030524/006839
- ReraGenie IDRG-KA-71483
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 May 2024
- Promised completion30 Nov 2028
- Revised completionNone
- Buildings5 building records
- Documents filed211 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 56 | 0 | 56 |
| B | - | - | - | 54 | 0 | 54 |
| C | - | - | - | 55 | 0 | 55 |
| D | - | - | - | 52 | 0 | 52 |
| Commercial | - | - | - | 0 | 260 | 260 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 85%.
Building: 39% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 80% |
| Retaining wall (All types) | 85% |
| RCC or MS Framed structure | 82% |
| Masonry Construction | 50% |
| Plastering inside , outside & Ceiling | 45% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 20% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 25% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 15% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 67% |
| Sewage and Drainage System | Yes | 60% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 30% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 60% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 45% |
| Lifts | Yes | 45% |
| Corridor/Lobbies | Yes | 45% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 50% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 5% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership9
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Y G Vasanth | - | - |
| Y G Murthy | - | - |
| Y K Channappa | - | - |
| Y N Ashwatha | - | - |
| Y G Ravi Kumar | - | - |
| Y M Nanjappa | - | - |
| Y M Jayanna | - | - |
| Y M Ramanna | - | - |
| Suchitra S | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 93.89 cr | Rs 7.95 cr |
| On-site expenditure-Salaries of workers | Rs 49.11 cr | Rs 75.42 lakh |
| On-site expenditure-Site Overhead | Rs 27.92 cr | Rs 63.42 lakh |
| Payment of taxes | Rs 26.82 cr | Rs 1.44 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 19.38 cr | Rs 18.89 lakh |
| On-site expenditure-Consultants Fees | Rs 2.25 cr | Rs 2.14 cr |
| Payment of Premiums | Rs 2.04 cr | - |
| Payment of cess | Rs 1.48 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 73.94 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Indrajit S Kembhavi |
| Engineer | Ajith Kumar D |
| Chartered Accountant | P Vinod Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed211
As listed on the registration, under the names the promoter filed them with; the newest 80 of 211 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/030524/006839 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM -4 Mayfair SD.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Mayfair - RERA FORM 5 09-10-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: May fair engr.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Labour and Education Department | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CHCPL-Form 4 Mafair Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Mayfair Arch Cert.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engr Cert.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Labour and Education Department | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rera - Q4 -Mayfair Sd.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Mayfair Arch Cert.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engn Cert.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Labour and Education Department | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Mayfair_F4_Q3_FY 25-26.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Arch Cert Mayfair.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Mayfair Engn Cert.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Labour and Education Department | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Revised CA certificate with bank account deatilsFile: Revised CA certificate.pdf | 29 Apr 2024 |
| Pass sheet of 30% bank accountFile: 862024- 30.pdf | 29 Apr 2024 |
| Pass sheet of 70% bank accountFile: 882024- 70.pdf | 29 Apr 2024 |
| Pass sheet of 100% bank accountFile: 872024- 100.pdf | 29 Apr 2024 |
| Affidavit for bank accountFile: Affidavit for bank account.pdf | 29 Apr 2024 |
| Certified area statement & Units break upFile: ARER STATEMENT - Common Area & Amenities.pdf | 29 Apr 2024 |
| Certificate for source of fundsFile: CA Certificate_Investment_Mayfair.pdf | 29 Apr 2024 |
| Balance sheet with schedule for 2020-21File: CHCPL_Balance Sheet with Schedule_FY 20-21.pdf | 29 Apr 2024 |
| Balance sheet with schedule for 2021-22File: CHCPL_Balance Sheet with Schedule_FY 21-22.pdf | 29 Apr 2024 |
| Balance sheet with schedule for 2022-23File: CHCPL_Balance Sheet with Schedule_FY 22-23.pdf | 29 Apr 2024 |
| NAC for relinquishment deedFile: NAC FOR RELINQUISHMENT DEED - MAYFAIR.pdf | 29 Apr 2024 |
| NOC_SEIAA for MOEF clearanceFile: NOC_SEIAA MOEF Clearance.pdf | 29 Apr 2024 |
| Jakkur NOCFile: Revised Jakkur Aerodrome NOC.pdf | 29 Apr 2024 |
| Title deed for SuchitraaaFile: Title deed for Suchitraa.pdf | 29 Apr 2024 |
| Title deed for Sy No 141File: Title deed for Sy No 141_compressed.pdf | 29 Apr 2024 |
| Title deed for Y G Vasanath, Y G MurthyFile: Title deed for Y G Vasanth and Y G Murthy and Y K Channappa_compressed.pdf | 29 Apr 2024 |
| Title deed for Y K ChannappaFile: Title deed for Y K Channappa.pdf | 29 Apr 2024 |
| Title deed for Y N AshwathaFile: Title deed for Y N Ashwatha.pdf | 29 Apr 2024 |
| Village map showing the proposed siteFile: Village map.pdf | 29 Apr 2024 |
| ClarificationsFile: Clarifications.pdf | 29 Apr 2024 |
| Profit & loss statement with schedule for 2022-23File: CHCPL_Profit and Loss Schedule_FY 22-23.pdf | 29 Apr 2024 |
| Profit & loss statement with schedule for 2021-22File: CHCPL_Profit and Loss Schedule_FY 21-22.pdf | 29 Apr 2024 |
| Profit & loss statement with schedule for 2020-21File: CHCPL_Profit and Loss Schedule_FY 20-21.pdf | 29 Apr 2024 |
| KSPCB fee payment receiptFile: KSPCB.pdf | 29 Apr 2024 |
| Revised Jakkur NOCFile: Revised Jakkur Aerodrome NOC.pdf | 29 Apr 2024 |
| Self attested KYC of B S NesaraFile: Self attested KYC of B S Nesara.pdf | 29 Apr 2024 |
| Self attested KYC of B S ShivaramaFile: Self attested KYC of B S Shivarama.pdf | 29 Apr 2024 |
| Self attested KYC of R G AnilFile: Self attested KYC of R G Anil.pdf | 29 Apr 2024 |
| Self attested KYC of R G SunilFile: Self attested KYC of R G Sunil.pdf | 29 Apr 2024 |
| Certified carpet area calculationsFile: Carpet area calculations.pdf | 29 Apr 2024 |
| RTC, survey 140 | - |
| Mutation, survey 140 | - |
| Encumbrance Certificate, survey 140 | - |
| Conversion/Alienation Order, survey 140 | - |
| Sale/Title/Gift Deed, survey 140 | - |
| JDA, survey 140 | - |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Concorde Antares | Sy No.26/1 & 26/2, Chikkabettahalli Village, Yelahanka Hobli, Bangalore North Taluk | Ongoing | Dec 2028 | Not due yet |
| Concorde Equity | Sy No.134/2,135/1,135/2,135/4,137/3,139/1,140/2,151,155/1 and 155/2 of Maliyappanahalli Village, Kasaba Hobli, Malur Taluk, | Ongoing | Dec 2026 | Not due yet |
| Concorde Econex | Plot No.27A, Doddanekundi Industrial Area, 1st Phase, Doddanekundi Village, K R Puram Hobli, Bangalore East Taluk | Ongoing | Mar 2026 | Not delivered |
| Concorde Auriga | Sy No.31/2B, 34/1 & 35, Medihalli Village, Bidarahalli Hobli, Bangalore East | Ongoing | Jun 2025 | Not delivered |
| Concorde Luxepolis | No.29, K P Puttanna Chetty Road | Ongoing | Sep 2024 | Not delivered |
| Concorde Spring Meadows | Sy No.5/1C & 7, Chikkasandra Village, Yeshwanthpura Hobli | Completed | - | No date filed |
| Concorde Spring Meadows | Sy No.5/1C & 7, Chikkasandra Village, Yeshwanthpura Hobli | Completed | - | No date filed |
| Concorde Epitome | Sy No.130/6, Kammasandra Village, Attibele Hobli, Anekal Taluk | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Concorde Mayfair on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
Sattva Lumina
Sattva Resi Private Limited
Brigade Eternia
Brigade Enterprises Ltd
Nikoo Homes V - Phase - 1
Bhartiya Urban Private Limited
GODREJ AVELINE
GODREJ SSPDL GREEN ACRES PRIVATE LIMITED
ORCHID SALISBURY
GOYAL HARIYANA ENTERPRISES
See every Bengaluru Urban project, with the district possession charts
Builder: Concorde Housing Corporation Pvt Ltd
Concorde Housing Corporation Pvt Ltd has 11 registrations on RERA Karnataka, including Concorde Mayfair and Concorde Spring Meadows. Its filings declare 12 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Concorde Mayfair is delayed beyond 30 Nov 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Concorde Mayfair?
The registered promoter entity is Concorde Housing Corporation Pvt Ltd, a company as per the filing. Its CIN U70102KA2008PTC046886 and GSTIN 29AADCC4087F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Concorde Mayfair?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Concorde Mayfair?
The professionals named in the filing: Architect: Indrajit S Kembhavi; Engineer: Ajith Kumar D; Chartered Accountant: P Vinod Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Concorde Mayfair?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.