Concorde Eleve
By Concorde Housing Corporation Pvt Ltd
RG-KA-10731 · RERA PRM/KA/RERA/1251/446/PR/210325/007608 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Concorde Eleve is a Residential/Group Housing project by Concorde Housing Corporation Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210325/007608 on 21 Mar 2025. Possession is promised by 31 Dec 2030. 21 of the 142 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameConcorde Eleve
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560064
- Pincode560064
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/210325/007608
- ReraGenie IDRG-KA-10731
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Mar 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed114 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 136 | 0 | 136 |
| B | - | - | - | 0 | 6 | 6 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.
Building: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 95% |
| Foundation footing work | 85% |
| Upto Plinth Level | 65% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 25% |
| Retaining wall (All types) | 45% |
| RCC or MS Framed structure | 10% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Electra Equipment Company I Pvt Ltd | - | - |
| Srinidhi Properties | - | - |
| Eltra Equipment I Pvt Ltd | - | - |
| Srinidhi Properties | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 67.96 cr | Rs 4.31 cr |
| On-site expenditure-Site Overhead | Rs 37.18 cr | Rs 43.18 lakh |
| On-site expenditure-Salaries of workers | Rs 24.52 cr | Rs 25.32 lakh |
| Payment of taxes | Rs 17.27 cr | Rs 83.78 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 12.47 cr | Rs 13.58 lakh |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 12.04 cr | Rs 29.76 lakh |
| On-site expenditure-Consultants Fees | Rs 1.86 cr | Rs 9.56 lakh |
| Payment of cess | Rs 1.21 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nanda Kumar V |
| Engineer | Ajith Kumar D |
| Chartered Accountant | CA Pattipati Vinod Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed114
As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210325/007608 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: ELEVE Form 5 Architect.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Eleve engr.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CHCPL-Form 4 Eleve Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ELEVE Form-5 Architect.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Eleve Engr Cert.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rera -Q4 -Eleve Sd.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Eleve Arch Cert.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eleve Engn Cert.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Eleve -Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Eleve Arch Cert.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eleve Engn Cert.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Clarfications for enquiryFile: Clarifications.pdf | 19 Mar 2025 |
| BBMP Circular regarding single plot layout planFile: BBMP Circular.pdf | 19 Mar 2025 |
| BDA Conversion opinionFile: BDA Conversion opinion.pdf | 19 Mar 2025 |
| Demarcation of proposed land on CDPFile: Demarcation of proposed land on CDP.pdf | 19 Mar 2025 |
| Demarcation of proposed land on Village mapFile: Demarcation of proposed land on Village map.pdf | 19 Mar 2025 |
| Joint survey sketchFile: JOINT SURVEY SKETCH.pdf | 19 Mar 2025 |
| Plan approval letterFile: PLAN SANCTION LETTER.pdf | 19 Mar 2025 |
| Registration CertificateFile: CHCPLCertificate of Incorporation.pdf | - |
| Memorandum of AssociationFile: CHCPLMOA.PDF | - |
| Article of AssociationFile: CHCPLAOA.pdf | - |
| GST CertificateFile: CHCPLGST Certifcate.pdf | - |
| Organization StructureFile: Organisation Chart of CHCPL Head Office.pdf | - |
| Certificate issued by CA Form 1File: Form -1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 2_Architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3_Engineer certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit- No Litigation 202423.pdf | - |
| Balance Sheet 2023 - 2024File: CHCPL_Balance Sheet with Schedule_FY 23-24_compressed.pdf | - |
| Balance Sheet 2022 - 2023File: CHCPL_Balance Sheet with Schedule_FY 22-23.pdf | - |
| Balance Sheet 2021 - 2022File: CHCPL_Balance Sheet with Schedule_FY 22-23.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: CHCPL_Profit and Loss with Schedule_FY 23-24_compressed.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: CHCPL_Profit and Loss with Schedule_FY 22-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: CHCPL_Profit and Loss with Schedule_FY 22-23.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: CHCPL ITR Ack_FY 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: CHCPL_ITR Ack_Fy 22-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: CHCPL_ITR Ack_Fy 22-23.pdf | - |
| Director's Report 2023 - 2024File: CHCPL_Directors Report_FY 23-24_compressed.pdf | - |
| Director's Report 2022 - 2023File: CHCPL_Directors Report_Fy22-23_compressed.pdf | - |
| Director's Report 2021 - 2022File: CHCPL_Directors Report_Fy22-23_compressed.pdf | - |
| Cash Flow Statement 2023 - 2024File: CHCPL_Cash Flow Statement_FY23-24.pdf | - |
| Cash Flow Statement 2022 - 2023File: CHCPL_Cash Flow Statement_FY 22-23.pdf | - |
| Auditor's Report 2023 - 2024File: CHCPL_Audit Report_FY23-24.pdf | - |
| Auditor's Report 2022 - 2023File: CHCPL_Audit Report_Fy 22-23.pdf | - |
| Auditor's Report 2021 - 2022File: CHCPL_Audit Report_Fy 22-23.pdf | - |
| Plan Sanction Letter | - |
| All -PLAN_compressed | - |
| ELEVATION & SECTION | - |
| Structural stability certificate | - |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Concorde Antares | Sy No.26/1 & 26/2, ChikkabettahalliVillage, Yelahanka Hobli, BangaloreNorth Taluk | Ongoing | Dec 2028 | Not due yet |
| Concorde Equity | Sy.No.134/2,135/1,135/2,135/4,137/3,139/1,140/2,151,155/1and 155/2 of Maliyappanahalli Village, Kasaba Hobli, Malur Taluk | Ongoing | Dec 2026 | Not due yet |
| Concorde Econex | Plot No.27A, Doddanekundi IndustrialArea, 1st Phase, Doddanekundi Village,K R Puram Hobli, Bangalore East Taluk | Ongoing | Mar 2026 | Not delivered |
| Concorde Auriga | Sy No.31/2B, 34/1 & 35, Medihalli Village, Bidarahalli Hobli, Bangalore East | Ongoing | Jun 2025 | Not delivered |
| Concorde Spring Meadows | Sy No.5/1C & 7, Chikkasandra Village,Yeshwanthpura Hobli | Completed | - | No date filed |
| Concorde Luxepolis | No.29, K P Puttanna Chetty Road, Chamrajpet | Completed | - | No date filed |
| Concorde Epitome | Sy No.130/6, Kammasandra Village,Attibele Hobli, Anekal Taluk | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Concorde Eleve on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
Sattva Lumina
Sattva Resi Private Limited
Brigade Eternia
Brigade Enterprises Ltd
Nikoo Homes V - Phase - 1
Bhartiya Urban Private Limited
GODREJ AVELINE
GODREJ SSPDL GREEN ACRES PRIVATE LIMITED
ORCHID SALISBURY
GOYAL HARIYANA ENTERPRISES
See every Bengaluru Urban project, with the district possession charts
Builder: Concorde Housing Corporation Pvt Ltd
Concorde Housing Corporation Pvt Ltd has 11 registrations on RERA Karnataka, including Concorde Mayfair and Concorde Spring Meadows. Its filings declare 12 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Concorde Eleve is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Concorde Eleve?
The registered promoter entity is Concorde Housing Corporation Pvt Ltd, a company as per the filing. Its CIN U70102KA2008PTC046886 and GSTIN 29AADCC4087F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Concorde Eleve?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Concorde Eleve?
The professionals named in the filing: Architect: Nanda Kumar V; Engineer: Ajith Kumar D; Chartered Accountant: CA Pattipati Vinod Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Concorde Eleve?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.