ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Columbia Belleza

Registration approved Residential/Group Housing project

Columbia Belleza

By JANKAL SANKALPA VENTURES

RG-KA-21975 · RERA PRM/KA/RERA/1251/310/PR/171223/002221 · Last updated on RERA Karnataka portal: 8 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • 26 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Sep 2022Possession promisedmoved 21 months from the original
26Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

Columbia Belleza is a Residential/Group Housing project by JANKAL SANKALPA VENTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171223/002221 on 23 Dec 2017. Possession is promised by 30 Sep 2022. The completion date has moved by 21 months from the original filing. 26 complaints are on record with the regulator.

At a glance

Project

  • NameColumbia Belleza
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171223/002221
  • ReraGenie IDRG-KA-21975

Builder

  • NameJANKAL SANKALPA VENTURES
  • Entity typeCompany
  • Authorized SignatoryRamesh L
  • OthersSurendra Babu P
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2017First promiseDec 2020Revised toSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Dec 2017
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Dec 2020)
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Altmount---62062
Clermount---62062

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 8 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,210 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 38.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2020 → Sep 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/230131/002221Sep 2021 → Sep 2022

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka26

Case no.ComplainantRespondentFiled
CMP/210921/0008359-Columbia Infra Holdings21/09/2021
CMP/211108/0008526-Columbia Infra Holdings08/11/2021
CMP/211202/0008664-Columbia Infra Holdings02/12/2021
00027/2023-Columbia Infra Holdings05/01/2023
00217/2023-Columbia Infra Holdings21/02/2023
00318/2023-Columbia Infra Holdings09/03/2023
00557/2023-Columbia Infra Holdings26/04/2023
00558/2023-Columbia Infra Holdings26/04/2023
00638/2023-Columbia Infra Holdings02/05/2023
00687/2023-Columbia Infra Holdings06/05/2023
00689/2023-Columbia Infra Holdings06/05/2023
00690/2023-Columbia Infra Holdings06/05/2023
00691/2023-Columbia Infra Holdings06/05/2023
00692/2023-Columbia Infra Holdings06/05/2023
00693/2023-Columbia Infra Holdings06/05/2023
00694/2023-Columbia Infra Holdings06/05/2023
00695/2023-Columbia Infra Holdings06/05/2023
00703/2023-Columbia Infra Holdings06/05/2023
00786/2023-Columbia Infra Holdings20/05/2023
00932/2023-Columbia Infra Holdings16/06/2023
00944/2023-Columbia Infra Holdings21/06/2023
01166/2023-Columbia Infra Holdings24/07/2023
01597/2023-Columbia Infra Holdings16/10/2023
01717/2023-Columbia Infra Holdings16/11/2023
00233/2024-Columbia Infra Holdings27/02/2024
00291/2024-Columbia Infra Holdings18/03/2024

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171223/002221 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OF 1File: CFO.pdf8 Apr 2022
OF 1File: BWSSB NOC.pdf28 Mar 2022
OF 1File: KSPCB Ack Columbia.pdf28 Mar 2022
OF 1File: form B.pdf28 Mar 2022
OF 1File: form B.pdf18 Feb 2022
OF 1File: sale agreement draft.pdf18 Feb 2022
OF 2File: KSPCB Ack Columbia.pdf18 Feb 2022
OF 1File: POORNAKRITI PROFILE.pdf18 Feb 2022
OF 2File: form B.pdf18 Feb 2022
OF 4File: sold n unsold units-converted.pdf18 Feb 2022
OF 5File: KSPCB Ack Columbia.pdf18 Feb 2022
OF 5File: BWSSB.pdf18 Feb 2022
OF 6File: Columbia Belleza Structural Stability Certificate_signed.pdf18 Feb 2022
of 1File: Project registration certificate.pdf26 Jan 2022
of 2&3File: Affidavit.pdf26 Jan 2022
of 1File: Building plan-compressed.pdf26 Jan 2022
of 2File: CC.pdf26 Jan 2022
3of 1File: Affidavit.pdf26 Jan 2022
of 2File: CL.pdf26 Jan 2022
of 3File: Details of sold & unsold units.xlsx26 Jan 2022
of 4File: 17_Proforma Sale Deed.pdf26 Jan 2022
of 5File: Allotment letter.pdf26 Jan 2022
of 6File: STP DETAIL.pdf26 Jan 2022
of 7File: BESCOM NOC.pdf26 Jan 2022
of 10File: Reason for extension.pdf26 Jan 2022
of 11File: Latitude & longitude.pdf26 Jan 2022
of 12File: Details.pdf26 Jan 2022
CertificateFile: 1_Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate for status of work as on date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - Work completed.pdf-
CA Certificate for Funds UtilizationFile: CA fund utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate for pending works.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA funds required.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: EC-compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: sold n unsold units-converted.pdf-
NOC DetailsFile: BESCOM NOC.pdf-
6_Commencement Certificate-
Site Plan-
7 8 Floors Plan-
17_Proforma Sale Deed-
9_Proforma Sale Agreement-
20_Sale Deed-
12_Area Development Plan Of Project Area-
9 10 11 Floors Plan-
13_Booking & Allotment Form-
14_Brochure-
16_Project Specifications-
5_EC-
10_Mutation-
19_ Joint Developement Agreement-
10_RTC-
Conversion-
15_NOC FIRE-
15_NOC AIRPORT-
15_NOC BESCOM-
15_NOC BWSSB-
15_NOC KSPCB-
15_NOC BSNL-
1 to 6 Floors Plan-
7 8 Floors Plan-
Land Merge Doc-
Balance Sheet 2016 - 2017File: it returns 2017-2018 comp.pdf-
Balance Sheet 2015 - 2016File: it columbia 2016-17.pdf-
Balance Sheet 2014 - 2015File: 3_Partners Financials 2013-14.pdf-
Audited Profit and Loss Statement 2016 - 2017File: it returns 2017-2018 comp.pdf-
Audited Profit and Loss Statement 2015 - 2016File: it columbia 2016-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 3_Partners Financials 2013-14.pdf-
Director's Report 2016 - 2017File: it returns 2017-2018 comp.pdf-
Director's Report 2015 - 2016File: it columbia 2016-17.pdf-
Director's Report 2014 - 2015File: 3_Partners Financials 2013-14.pdf-
Cash Flow Statement 2016 - 2017File: it returns 2017-2018 comp.pdf-
Cash Flow Statement 2015 - 2016File: it columbia 2016-17.pdf-
Auditor's Report 2016 - 2017File: it returns 2017-2018 comp.pdf-
Auditor's Report 2015 - 2016File: it columbia 2016-17.pdf-
Auditor's Report 2014 - 2015File: 3_Partners Financials 2013-14.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: it returns 2017-2018 comp.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: it columbia 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 3_Partners Financials 2013-14.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Columbia Belleza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: JANKAL SANKALPA VENTURES

JANKAL SANKALPA VENTURES has 2 registrations on RERA Karnataka, including JANKAL STELLAR HEIGHTS and Columbia Belleza. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Columbia Belleza is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Columbia Belleza?

The registered promoter entity is JANKAL SANKALPA VENTURES, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Columbia Belleza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Columbia Belleza?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Columbia Belleza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Columbia Belleza. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Columbia Belleza to a free account