Home / Browse projects / Bengaluru Urban, Karnataka / Columbia Belleza
Columbia Belleza
RG-KA-21975 · RERA PRM/KA/RERA/1251/310/PR/171223/002221 · Last updated on RERA Karnataka portal: 8 Apr 2022
Source: official RERA Karnataka filing
Red flags
- 26 complaints at RERA Karnataka
- Completion date moved by 21 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
Columbia Belleza is a Residential/Group Housing project by JANKAL SANKALPA VENTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171223/002221 on 23 Dec 2017. Possession is promised by 30 Sep 2022. The completion date has moved by 21 months from the original filing. 26 complaints are on record with the regulator.
At a glance
Project
- NameColumbia Belleza
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/171223/002221
- ReraGenie IDRG-KA-21975
Builder
- NameJANKAL SANKALPA VENTURES
- Entity typeCompany
- Authorized SignatoryRamesh L
- OthersSurendra Babu P
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 Dec 2017
- Promised completion30 Sep 2022
- Revised completionRevised to 30 Sep 2022 (originally 31 Dec 2020)
- Buildings2 building records
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Altmount | - | - | - | 62 | 0 | 62 |
| Clermount | - | - | - | 62 | 0 | 62 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 8 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 8 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterFinancial crunch
Complaints filed with RERA Karnataka26
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/210921/0008359 | - | Columbia Infra Holdings | 21/09/2021 |
| CMP/211108/0008526 | - | Columbia Infra Holdings | 08/11/2021 |
| CMP/211202/0008664 | - | Columbia Infra Holdings | 02/12/2021 |
| 00027/2023 | - | Columbia Infra Holdings | 05/01/2023 |
| 00217/2023 | - | Columbia Infra Holdings | 21/02/2023 |
| 00318/2023 | - | Columbia Infra Holdings | 09/03/2023 |
| 00557/2023 | - | Columbia Infra Holdings | 26/04/2023 |
| 00558/2023 | - | Columbia Infra Holdings | 26/04/2023 |
| 00638/2023 | - | Columbia Infra Holdings | 02/05/2023 |
| 00687/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00689/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00690/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00691/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00692/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00693/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00694/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00695/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00703/2023 | - | Columbia Infra Holdings | 06/05/2023 |
| 00786/2023 | - | Columbia Infra Holdings | 20/05/2023 |
| 00932/2023 | - | Columbia Infra Holdings | 16/06/2023 |
| 00944/2023 | - | Columbia Infra Holdings | 21/06/2023 |
| 01166/2023 | - | Columbia Infra Holdings | 24/07/2023 |
| 01597/2023 | - | Columbia Infra Holdings | 16/10/2023 |
| 01717/2023 | - | Columbia Infra Holdings | 16/11/2023 |
| 00233/2024 | - | Columbia Infra Holdings | 27/02/2024 |
| 00291/2024 | - | Columbia Infra Holdings | 18/03/2024 |
Documents filed84
As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171223/002221 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| OF 1File: CFO.pdf | 8 Apr 2022 |
| OF 1File: BWSSB NOC.pdf | 28 Mar 2022 |
| OF 1File: KSPCB Ack Columbia.pdf | 28 Mar 2022 |
| OF 1File: form B.pdf | 28 Mar 2022 |
| OF 1File: form B.pdf | 18 Feb 2022 |
| OF 1File: sale agreement draft.pdf | 18 Feb 2022 |
| OF 2File: KSPCB Ack Columbia.pdf | 18 Feb 2022 |
| OF 1File: POORNAKRITI PROFILE.pdf | 18 Feb 2022 |
| OF 2File: form B.pdf | 18 Feb 2022 |
| OF 4File: sold n unsold units-converted.pdf | 18 Feb 2022 |
| OF 5File: KSPCB Ack Columbia.pdf | 18 Feb 2022 |
| OF 5File: BWSSB.pdf | 18 Feb 2022 |
| OF 6File: Columbia Belleza Structural Stability Certificate_signed.pdf | 18 Feb 2022 |
| of 1File: Project registration certificate.pdf | 26 Jan 2022 |
| of 2&3File: Affidavit.pdf | 26 Jan 2022 |
| of 1File: Building plan-compressed.pdf | 26 Jan 2022 |
| of 2File: CC.pdf | 26 Jan 2022 |
| 3of 1File: Affidavit.pdf | 26 Jan 2022 |
| of 2File: CL.pdf | 26 Jan 2022 |
| of 3File: Details of sold & unsold units.xlsx | 26 Jan 2022 |
| of 4File: 17_Proforma Sale Deed.pdf | 26 Jan 2022 |
| of 5File: Allotment letter.pdf | 26 Jan 2022 |
| of 6File: STP DETAIL.pdf | 26 Jan 2022 |
| of 7File: BESCOM NOC.pdf | 26 Jan 2022 |
| of 10File: Reason for extension.pdf | 26 Jan 2022 |
| of 11File: Latitude & longitude.pdf | 26 Jan 2022 |
| of 12File: Details.pdf | 26 Jan 2022 |
| CertificateFile: 1_Registration Certificate.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Architect certificate for status of work as on date.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - Work completed.pdf | - |
| CA Certificate for Funds UtilizationFile: CA fund utilization.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Architect certificate for pending works.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - Work Pending.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA funds required.pdf | - |
| AffidavitFile: Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: EC-compressed.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: sold n unsold units-converted.pdf | - |
| NOC DetailsFile: BESCOM NOC.pdf | - |
| 6_Commencement Certificate | - |
| Site Plan | - |
| 7 8 Floors Plan | - |
| 17_Proforma Sale Deed | - |
| 9_Proforma Sale Agreement | - |
| 20_Sale Deed | - |
| 12_Area Development Plan Of Project Area | - |
| 9 10 11 Floors Plan | - |
| 13_Booking & Allotment Form | - |
| 14_Brochure | - |
| 16_Project Specifications | - |
| 5_EC | - |
| 10_Mutation | - |
| 19_ Joint Developement Agreement | - |
| 10_RTC | - |
| Conversion | - |
| 15_NOC FIRE | - |
| 15_NOC AIRPORT | - |
| 15_NOC BESCOM | - |
| 15_NOC BWSSB | - |
| 15_NOC KSPCB | - |
| 15_NOC BSNL | - |
| 1 to 6 Floors Plan | - |
| 7 8 Floors Plan | - |
| Land Merge Doc | - |
| Balance Sheet 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Balance Sheet 2015 - 2016File: it columbia 2016-17.pdf | - |
| Balance Sheet 2014 - 2015File: 3_Partners Financials 2013-14.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: it columbia 2016-17.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: 3_Partners Financials 2013-14.pdf | - |
| Director's Report 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Director's Report 2015 - 2016File: it columbia 2016-17.pdf | - |
| Director's Report 2014 - 2015File: 3_Partners Financials 2013-14.pdf | - |
| Cash Flow Statement 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Cash Flow Statement 2015 - 2016File: it columbia 2016-17.pdf | - |
| Auditor's Report 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Auditor's Report 2015 - 2016File: it columbia 2016-17.pdf | - |
| Auditor's Report 2014 - 2015File: 3_Partners Financials 2013-14.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: it returns 2017-2018 comp.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: it columbia 2016-17.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: 3_Partners Financials 2013-14.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Columbia Belleza on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: JANKAL SANKALPA VENTURES
JANKAL SANKALPA VENTURES has 2 registrations on RERA Karnataka, including JANKAL STELLAR HEIGHTS and Columbia Belleza. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Columbia Belleza is delayed beyond 30 Sep 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Columbia Belleza?
The registered promoter entity is JANKAL SANKALPA VENTURES, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Columbia Belleza?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Columbia Belleza?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in Columbia Belleza?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback