ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Chick Cottage Residences

Registration approved Residential/Group Housing project

Chick Cottage Residences

By Tree of Life Dwellings LLP

RG-KA-23063 · RERA PRM/KA/RERA/1251/446/PR/171214/000803

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 11 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2020Possession promisedmoved 11 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 39 documents Report an error

Chick Cottage Residences is a Residential/Group Housing project by Tree of Life Dwellings LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171214/000803 on 14 Dec 2017. Possession is promised by 30 Aug 2020. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameChick Cottage Residences
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/171214/000803
  • ReraGenie IDRG-KA-23063

Builder

  • NameTree of Life Dwellings LLP
  • Entity typeOther
  • Authorized SignatorySaroja Chandrashekaran

Key dates

this monthRegisteredDec 2017First promiseSep 2019Revised toAug 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Dec 2017
  • Promised completion30 Aug 2020
  • Revised completionRevised to 30 Aug 2020 (originally 2 Sep 2019)
  • Buildings1 building record
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHICK COTTAGE RESIDENCESS---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,281 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.84 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAus Architecture
EngineerS & S Associates

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2019 → May 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/200303/000803May 2021 → Aug 2020

Reason as filed by the promoterApplied for modification

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171214/000803 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Tree of Life_Certificate of Incorporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate-Completed works.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: Funds Utilisation.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate-Pending works.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate-Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Funds Required.PDF-
AffidavitFile: Affidavit for project extension.PDF-
Latest Encumbrance CertificateFile: Latest EC.PDF-
Consent letter from 2/3rd of AllotteesFile: NOC.pdf-
Relevant Document/sFile: Compensation clause.PDF-
Details Of Sold/ Un-sold UnitsFile: Flat Details [Sold or Unsold].PDF-
NOC DetailsFile: NOC.pdf-
Document 1File: Form B.PDF-
Document 2File: Email notice reply_9.1.2020-all attachments.pdf-
Document 3File: 2.IDBI Closure documents.pdf-
Document 4File: Sold and Unsold.xlsx-
Document 5File: Affifavit Compensation and NOCs.pdf-
Document 6File: Sold and Unsold land owner.xlsx-
Commencement certificate-
Proforma-
saledeed-
Chickcottage plan copy-
Plan sanction BBMP-
Project specification-
TOL E C_May 2017-
Chick Cottage Residences Khatha certificate and extract-
JDA Registered document-
Aryenish-chickcottage tax payment-2017-18-
Balance Sheet 2015 - 2016File: Balance sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and loss account.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT return acknowledgement.pdf-
Prospectus/BrochureFile: CHICK COTTAGE2.pdf-
Advertisement Copy 1File: CHICK COTTAGE_G+3.jpeg (1).jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_171214_000803.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Completion certificate issued by the competent authorityFile: Engineer Certificate.pdf-
Registered Agreement of SaleFile: JDA Registered document_2.pdf-
Registered conveyance deed for an individual unitFile: Conveyance deed.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 11 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Chick Cottage Residences on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Tree of Life Dwellings LLP

Tree of Life Dwellings LLP has 1 registration on RERA Karnataka, including Chick Cottage Residences. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Chick Cottage Residences is delayed beyond 30 Aug 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Chick Cottage Residences?

The registered promoter entity is Tree of Life Dwellings LLP. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Chick Cottage Residences?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Chick Cottage Residences?

The professionals named in the filing: Architect: Aus Architecture; Engineer: S & S Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chick Cottage Residences?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chick Cottage Residences. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chick Cottage Residences to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.