Home / Browse projects / Bengaluru Urban, Karnataka / Chartered Hummingbird
Chartered Hummingbird
RG-KA-87421 · RERA PRM/KA/RERA/1251/310/PR/170824/000049
Source: official RERA Karnataka filing
Red flags
- 2 complaints at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Chartered Hummingbird is a Residential/Group Housing project by Chartered Housing Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170824/000049 on 24 Aug 2017. Possession is promised by 31 Dec 2018. 2 complaints are on record with the regulator.
At a glance
Project
- NameChartered Hummingbird
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/170824/000049
- ReraGenie IDRG-KA-87421
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on24 Aug 2017
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings1 building record
- Documents filed40 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Chartered Hummingbird | - | - | - | 117 | 0 | 117 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | Not applicable |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | Not applicable |
| Basic work of Water supply, Sanitary and Electrification | Not applicable |
| Dadoing, Skirting, Flooring, Tiles work (All types) | Not applicable |
| Railing and Grill fixing | Not applicable |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s PR Design Group |
| Engineer | M/s. Design Consortium |
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/221105/0010186 | - | Chartered Housing Pvt Ltd | 05/11/2022 |
| 00608/2023 | - | Chartered Housing Pvt Ltd | 29/04/2023 |
Documents filed40
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170824/000049 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: Copy of Reg Certificate.pdf | - |
| Cc | - |
| Building Plan | - |
| Layout Plan | - |
| Chartered HB Sale deed | - |
| SA- Humming Bird | - |
| RTC | - |
| Building Section | - |
| Development Plan | - |
| Allotment lettr- CHB | - |
| Brochure | - |
| Noc pcb | - |
| Specs | - |
| EC | - |
| Khatha , Extract & Tax Paid Recipt | - |
| Balance Sheet 2015 - 2016File: BS 16.pdf | - |
| Balance Sheet 2014 - 2015File: BS15.pdf | - |
| Balance Sheet 2013 - 2014File: BS 14.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: PF 16.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: PF 15.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: PF 14.pdf | - |
| Director's Report 2015 - 2016File: DR16.pdf | - |
| Director's Report 2014 - 2015File: DR15.pdf | - |
| Director's Report 2013 - 2014File: DR14.pdf | - |
| Cash Flow Statement 2015 - 2016File: CF 16.pdf | - |
| Cash Flow Statement 2014 - 2015File: CF 15.pdf | - |
| Auditor's Report 2015 - 2016File: AR16.pdf | - |
| Auditor's Report 2014 - 2015File: AR15.pdf | - |
| Auditor's Report 2013 - 2014File: AR14.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: IT 16.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: IT 15.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: IT 14.pdf | - |
| Declaration Form B | - |
| Prospectus/BrochureFile: Chartered Hummingbird brochure.PDF | - |
| Advertisement Copy 1File: Advertisement copy.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_170824_000049.xlsx | - |
| Occupancy CertificateFile: Occupancy Certificate 1mb.pdf | - |
| Completion certificateFile: Completion Certificate 1mb.pdf | - |
| Registered Agreement of SaleFile: Sale Agreement-Flat no 008 final.pdf | - |
| Registered conveyance deed for an individual unitFile: CHB Registered Sale Deed Agreement.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Chartered Grasshopper | - | Completed | Jul 2017 | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Chartered Hummingbird on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Chartered Housing Pvt Ltd
Chartered Housing Pvt Ltd has 3 registrations on RERA Karnataka, including Chartered Windsong - 2 and Chartered Veda. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Chartered Hummingbird is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Chartered Hummingbird?
The registered promoter entity is Chartered Housing Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Chartered Hummingbird?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Chartered Hummingbird?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Chartered Hummingbird?
The professionals named in the filing: Architect: M/s PR Design Group; Engineer: M/s. Design Consortium. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chartered Hummingbird?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback