Home / Browse projects / Raigarh, Maharashtra / CHANDRADARSHAN HEIGHTS PHASE III

Registered No litigation declared Residential / Group Housing project

CHANDRADARSHAN HEIGHTS PHASE III

By TATVARAJ DEVELOPERS

RG-MH-81793 · RERA P52000048310 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
15 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 98%
11 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

CHANDRADARSHAN HEIGHTS PHASE III is a Residential / Group Housing project by TATVARAJ DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000048310 on 26 Dec 2022. Possession is promised by 31 Dec 2027. 41 of the 52 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.

At a glance

Project

  • NameCHANDRADARSHAN HEIGHTS PHASE III
  • TypeResidential / Group Housing
  • Location
    • VILLAGE BHUVANESHWAR
    • ROHA
    • Roha Ashtami (M Cl)
    • Raigarh
    • 402116
  • Pincode402116
  • RERA no.P52000048310
  • ReraGenie IDRG-MH-81793

Builder

  • NameTATVARAJ DEVELOPERS
  • Entity typePartnership
  • PartnersSUNNY RAJENDRA JAIN, MANISH NEMICHAND OSWAL

Key dates

this monthRegisteredDec 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Current status

79%41 of 52 units booked
98.0%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA6620727
BUILDING BNA6025025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

BUILDING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
BUILDING A11
BUILDING B11

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,102 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Aug 2025
LandownerVillageDistrict
GOPARAM DHUKAJI SUNDESHAKoladRaigarh
RAJESH KUMAR PRABHURAMJI MALIWarseRaigarh
LALA RAM-Jalor
SAVITA SANTOSH PANKARWarseRaigarh
SWATI RAVINDRA DEVAREWarseRaigarh

Approvals and building plan

Sanctioning authorityDistrict Collector of Raigad
Permissible FSI2102.48
Proposed, not sanctioned2,102 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROHA
Estimated costRs 4.36 cr
Cost incurredRs 4.28 cr
Work done98.0%
BuildingWingEstimatedIncurred
BUILDING BNARs 2.15 crRs 2.11 cr
BUILDING ANARs 1.90 crRs 1.86 cr
-NARs 30.78 lakhRs 30.16 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU CONSULTANT AND ENGINEERS
EngineerC B JOSHI
EngineerKIRAN ANIL BHAGAT
Chartered AccountantRUTUJA SAJJAN NARSINGH
Chartered AccountantRONAK A JAIN
Chartered AccountantNusrat Banu Sayed
PartnerRole in project
TATVARAJ DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tatvaraj Developers Form 1.pdf7 May 2026
Withdrawal Update Form 2File: Tatvaraj Developers Form 2.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 of Chandradarshan Heights Phase III as on 31-12-2025.pdf7 May 2026
Withdrawal Update Form 1File: Form 1_30092025.pdf11 Mar 2026
Withdrawal Update Form 1File: Form 1_31122025.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2_30092025.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2_31122025.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3 of Chandradarshan Heights Phase III as on 30-09-2025.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3 of Chandradarshan Heights Phase III as on 31-12-2025.pdf11 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf5 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf5 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf5 Oct 2025
Form 5 (FY 2022-2023)File: Form -5 FY 22-23.pdf5 Oct 2025
Form 5 (FY 2023-2024)File: Form -5 FY 23-24.pdf5 Oct 2025
Form 1File: Form 1.pdf10 Aug 2025
Form 2File: Form 2.pdf10 Aug 2025
Form 3File: Form 3.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units 31032025 Tatvaraj.pdf10 Aug 2025
Form 2A (FY 2022-2023)File: Form 2A Tatvaraj Developers 2023.pdf10 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A Tatvaraj Developers 2024.pdf10 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Tatvaraj Developers 2025.pdf10 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-03-2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30-06-2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30-09-2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-12-2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-12-2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-03-2023.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Heights Phase III as on Sep 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Heights Phase III as on Dec 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Heights Phase III as on June 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Heights Phase III as on March 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Heights Phase III as on March 2023.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Date 31-03-2023 (1).pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Date -31-03-2024 (1).pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Date - 30-06-2024.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Date - 30-09-2024.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Date - 31-12-2024 (1).pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Chandradarshan Heights Phase III as on FY 22-23.pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Chandradarshan Heights Phase III as on FY - 23-24.pdf3 Mar 2025
Declaration in FORM BFile: Final form B Sunny_11zon.pdf15 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf15 Dec 2022
Copy of the legal title reportFile: New Legal title Plot No 1.pdf6 Dec 2022
Copy of the legal title reportFile: New Legal title Plot No 2.pdf6 Dec 2022
Details of encumbrances concerned to FinanceFile: No Encrumberances Certificate _ Tatvaraj Dev.pdf30 Nov 2022
Details of encumbrances concerned to LegalFile: No Encrumberances Certificate _ Tatvaraj Dev.pdf30 Nov 2022
Proforma of Allotment letterFile: allotment letter new.pdf25 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: No encumbearance letter of Bank account.pdf25 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation report of Allotment letter.pdf25 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report of Agreement for sale.pdf25 Nov 2022
Layout approvalFile: scan0538_11zon.pdf19 Nov 2022
Layout approvalFile: scan0539_11zon.pdf19 Nov 2022
Layout approvalFile: scan0540_11zon.pdf19 Nov 2022
Building plan approvalFile: scan0538_11zon.pdf19 Nov 2022
Building plan approvalFile: scan0539_11zon.pdf19 Nov 2022
Building plan approvalFile: scan0540_11zon.pdf19 Nov 2022
PAN CardFile: Pan Card (Firm).pdf19 Nov 2022
Details of encumbrances concerned to FinanceFile: No Encumberance Final.pdf19 Nov 2022
Details of encumbrances concerned to LegalFile: No Encumberance Final.pdf19 Nov 2022
Copy of Layout Approval (in case of layout)File: scan0538_11zon.pdf19 Nov 2022
Copy of Layout Approval (in case of layout)File: scan0539_11zon.pdf19 Nov 2022
Copy of Layout Approval (in case of layout)File: scan0540_11zon.pdf19 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: scan0538_11zon.pdf19 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: scan0539_11zon.pdf19 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: scan0540_11zon.pdf19 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_Tatvaraj Dev_11zon.pdf19 Nov 2022
Declaration about Commencement CertificateFile: Declaration About CC_ Tatvaraj Dev.pdf19 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate150_11zon.pdf19 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate149_11zon.pdf19 Nov 2022
CERSAI detailsFile: Cersai Report.pdf19 Nov 2022
Proforma of Agreement for saleFile: Agreement for sale part 1.pdf19 Nov 2022
Proforma of Agreement for saleFile: Agreement for sale part 2.pdf19 Nov 2022

How this compares with Raigarh

79%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHANDRADARSHAN HEIGHTS PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ROHA5,900+ in Raigarh

Builder: TATVARAJ DEVELOPERS

TATVARAJ DEVELOPERS has 1 registration on MahaRERA, including CHANDRADARSHAN HEIGHTS PHASE III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if CHANDRADARSHAN HEIGHTS PHASE III is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHANDRADARSHAN HEIGHTS PHASE III?

The registered promoter entity is TATVARAJ DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHANDRADARSHAN HEIGHTS PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHANDRADARSHAN HEIGHTS PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHANDRADARSHAN HEIGHTS PHASE III?

The professionals named in the filing: Architect: VASTU CONSULTANT AND ENGINEERS; Engineer: C B JOSHI; Engineer: KIRAN ANIL BHAGAT; Chartered Accountant: RUTUJA SAJJAN NARSINGH; Chartered Accountant: RONAK A JAIN; Chartered Accountant: Nusrat Banu Sayed. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHANDRADARSHAN HEIGHTS PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHANDRADARSHAN HEIGHTS PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHANDRADARSHAN HEIGHTS PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.