Home / Browse projects / Bengaluru Urban, Karnataka / CENTURY ETHOS (SHELTORS SHARE)

Registration approved Residential/Group Housing project

CENTURY ETHOS (SHELTORS SHARE)

By CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED

RG-KA-20370 · RERA PRM/KA/RERA/1251/309/PR/201001/003627 · Last updated on RERA Karnataka portal: 1 Mar 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2022Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 104 documents Report an error

CENTURY ETHOS (SHELTORS SHARE) is a Residential/Group Housing project by CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/201001/003627 on 1 Oct 2020. Possession is promised by 30 Jun 2022. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameCENTURY ETHOS (SHELTORS SHARE)
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/201001/003627
  • ReraGenie IDRG-KA-20370

Builder

  • NameCENTURY SHELTORS DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109KA2019PTC130679
  • Authorized SignatoryMAHESH PRABHU

Key dates

this monthRegisteredOct 2020First promiseJun 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Oct 2020
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
  • Buildings3 building records
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARGON---64064
BRONZE---51051
CHROME---21021

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 1 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,575 sq m
Named landowners1
LandownerVillageDistrict
CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 185.41 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/230119/003627Jun 2021 → Jun 2022

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed104

As listed on the registration, under the names the promoter filed them with; the newest 80 of 104 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/201001/003627 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Bank StatementFile: Bank Statement.pdf1 Mar 2022
Bank StatementFile: Bank Statement.pdf7 Feb 2022
Bank StatementwsFile: Bank Statements.pdf19 Nov 2021
Revised Form BFile: FORM B - Revised.pdf19 Nov 2021
Affidavit Form Ex-7File: Affidavit Form-Ex7.pdf19 Nov 2021
Sanction LetterFile: Ethos-BBMPPlansanctionLiscence.pdf19 Nov 2021
Site PlanFile: Site Plan.PDF19 Nov 2021
2nd Basement PlanFile: 2nd Basement.PDF19 Nov 2021
1st Basement PlanFile: 1st Basement.PDF19 Nov 2021
Ground Floor PlanFile: Ground Floor.PDF19 Nov 2021
1st Floor PlanFile: 1st Floor.PDF19 Nov 2021
2nd Floor PlanFile: 2nd Floor.PDF19 Nov 2021
3rd to 19th FloorFile: 3to19 Floors.PDF19 Nov 2021
20th FloorFile: 20th Floor.PDF19 Nov 2021
Section DrawingFile: Section.PDF19 Nov 2021
Elevation DrawingFile: Elevation.PDF19 Nov 2021
KSPCB Renewed NoCFile: KSPCB 2020.pdf19 Nov 2021
SEIAA Renewed NoCFile: MoEF - SEIAA.pdf19 Nov 2021
Engineer Certificate Form Ex-5File: Century Ethos Sheltors Share Form Ex 5.pdf19 Nov 2021
Engineer Certificate Form Ex-6File: Century Ethos Sheltors Share Form Ex 6.pdf19 Nov 2021
Project Member DetailsFile: Project Member Details.pdf19 Nov 2021
Section 18(1) AffidavitFile: Section 18 Affidavit.pdf19 Nov 2021
Break-up Development DetailsFile: Unit-wise Details.pdf19 Nov 2021
STP DrawingsFile: STP Report and Drawings.pdf19 Nov 2021
Clarification Letter on Development AreaFile: Century Ethos clarification Signed.pdf25 Sep 2020
Architect PlanFile: Architect Plan.pdf25 Sep 2020
Balance Amount Paid - ReceiptFile: Paid Receipt.pdf25 Sep 2020
Project Head detailsFile: Project Member Details.pdf21 Sep 2020
Clear Copy of the Sanctioned PlanFile: Ethos BBMP Merged Docs_compressed.pdf21 Sep 2020
Self attested PAN of Century Sheltors Developers Private LimitedFile: CSDPL PAN - Attested.pdf21 Sep 2020
Self Attested PAN of Mahesh PrabhuFile: MP PAN - Attested.pdf21 Sep 2020
Undertaking Letter on Sale DeedFile: Letter on Sale Deed.pdf21 Sep 2020
EC from 01-04-2017 till 15-09-2020File: EC from 01.04.2017 to 15.09.2020 09192020 (1).pdf21 Sep 2020
CertificateFile: CERTIFICATE OF INCORPORATION.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Century Ethos Sheltors Share Form Ex 1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Century Ethos Sheltors Share Form Ex 5.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized ethos share.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Century Ethos Sheltors Share Form Ex 2.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Century Ethos Sheltors Share Form Ex 5.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required ethos share.pdf-
AffidavitFile: CSDPL Affidavits REDUCED.pdf-
Latest Encumbrance CertificateFile: ETHOS EC reduced.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Commencement Certificate-ETHOS_1501323100051-
Building Plan-ETHOS_1501323100059-
Approved Layout Plan-
Sale deed format (RERA final)-
ATS - RERA Ethos (resi) part I & 2 -
Ethos - Sale Deed - Combined_1507880174046-
Building Plan-ETHOS_1501323100059-
Ethos-DP_1501323100068-
Allotment letter format - Ethos-
DRAFT LTR TO RERA-AGENT-
SPECIFICATIONS_1501323100163-
Ethos - EC - Combined_1507880173961-
Section3 Affidavit CSDPL-
JD Affidavit CSDPL-
RTC_Khata_Combined-
CSDPL JD documents-
Unnamed document-
ETHOS - CONVERSION ORDERS_new_1505531975470-
Unnamed document-
Previous Project Draft-
Unnamed document-
Unnamed document-
FIRE-NOC_1505531975480-
AAI-NOC_1505531975488-
BESCOM-NOC_1505531975495-
BWSSB-NOC-
KSPCB-NOC-
MOEF-NOC_1505531975515-
BSNL-NOC_1505531975520-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep CENTURY ETHOS (SHELTORS SHARE) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmCENTURY ETHOS (SHELTORS Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED

CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including CENTURY ETHOS (SHELTORS SHARE). Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if CENTURY ETHOS (SHELTORS SHARE) is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of CENTURY ETHOS (SHELTORS SHARE)?

The registered promoter entity is CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U70109KA2019PTC130679 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in CENTURY ETHOS (SHELTORS SHARE)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in CENTURY ETHOS (SHELTORS SHARE)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTURY ETHOS (SHELTORS SHARE). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTURY ETHOS (SHELTORS SHARE) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.