Home / Browse projects / Bengaluru Urban, Karnataka / Century Central

Registration approved Mixed Development project

Century Central

By Century joint Development Private Limited

RG-KA-29396 · RERA PRM/KA/RERA/1251/310/PR/171015/000351

Source: official RERA Karnataka filing

Red flags

  • 3 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2019Possession promisedmoved 12 months from the original
3Complaints at RERA Karnatakaon this registration
Jump to the 63 documents Report an error

Century Central is a Mixed Development project by Century joint Development Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171015/000351 on 15 Oct 2017. Possession is promised by 30 Jun 2019. The completion date has moved by 12 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameCentury Central
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171015/000351
  • ReraGenie IDRG-KA-29396

Builder

  • NameCentury joint Development Private Limited
  • Entity typeCompany
  • CINU70200KA2010PTC052710
  • Authorized SignatoryMahesh Prabhu
  • OthersNeelakanth Patil
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2017First promiseJun 2018Revised toJun 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion30 Jun 2019
  • Revised completionRevised to 30 Jun 2019 (originally 30 Jun 2018)
  • Buildings6 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---33033
B---40040
C---20020
D---60060
E---39039
F---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,084 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 159.90 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/200103/000351Jun 2018 → Jun 2019

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
CMP/190721/0003655-Century joint Development Private Limited21/07/2019
CMP/190801/0003757-Century joint Development Private Limited01/08/2019
CMP/190805/0003761-Century joint Development Private Limited05/08/2019

Documents filed63

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171015/000351 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: CJDPL-Certificate of Incorporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: CENTRAL-STATUS OF WORK.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Century Central.pdf-
CA Certificate for Funds UtilizationFile: CA Cert Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: CENTRAL-PENDING WORK.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg Cert - Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Cert Funds Required.pdf-
AffidavitFile: Form B - CJD Central.pdf-
Latest Encumbrance Certificate-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: CJD Extension.pdf-
Document 2File: CJD Sec 18.pdf-
Document 3File: CJD Sec 18.pdf-
Document 4File: Central Customers NoC reduced.pdf-
CC-
Building Plan-
NA Sheet-
Sale Deed - FORMAT-
Agreement to Sell-
Legal Opinion-2011 Revised-
Section Plans Revised-
Building Plan-
Proforma of Allotment Letter - Central-
Central E brochure for RERA compressed-
NOCs-
CENTRAL-SPECIFICATION-
EC-
RTC_khata_Central-
CENTRAL-JDA-
Century_Central_Sale_deed-
Century_Central_Conversion_Order_opt-
FIRE-NOC [04-05-2012]_opt-
AAI-
BESCOM-NOC [8-06-2011]-
BWSSB-NOC [02-02-2012]-
KSPCB-NOC [22-06-2011]_opt-
BSNL-NOC [29-07-2010]-
METRO-NOC [19-05-2012]-
Central_Section_Elevation-
Balance Sheet 2015 - 2016File: CJD-AUDITED FINANCIAL STATEMENT-FY-2015-16.pdf-
Balance Sheet 2014 - 2015File: CJD Signed Financials 14-15 Revised.pdf-
Balance Sheet 2013 - 2014File: CJD Bs 2014 final.pdf-
Audited Profit and Loss Statement 2015 - 2016File: CJD-AUDITED FINANCIAL STATEMENT-FY-2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: CJD Signed Financials 14-15 Revised.pdf-
Audited Profit and Loss Statement 2013 - 2014File: CJD Bs 2014 final.pdf-
Director's Report 2015 - 2016File: Boards' Report & MGT-9 Revised.pdf-
Director's Report 2014 - 2015File: Boards Report 2014-15.pdf-
Director's Report 2013 - 2014File: CJD Directors Rpt 2014.pdf-
Cash Flow Statement 2015 - 2016File: CJD-AUDITED FINANCIAL STATEMENT-FY-2015-16.pdf-
Cash Flow Statement 2014 - 2015File: CJD Signed Financials 14-15 Revised.pdf-
Auditor's Report 2015 - 2016File: Audit Report Standalone.pdf-
Auditor's Report 2014 - 2015File: Audit Report Standalone.pdf-
Auditor's Report 2013 - 2014File: Audit Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: CJD ITR ack AY 16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: CJD ITR 2015- Ack.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: CJD ITR 6 AY 14-15-ACK.pdf-
Form B Central-
Prospectus/BrochureFile: Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171015_000351.xlsx-
Occupancy CertificateFile: Central-OC(07122019)_compressed.pdf-
Completion certificate issued by the competent authorityFile: Central-OC(07122019)_compressed.pdf-
Registered Agreement of SaleFile: Central Letter on Sale Agreements.pdf-
Registered conveyance deed for an individual unitFile: Residential -Sale Deed Format - Century Central.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Century Saras-CompletedJul 2017No date filed
Century Linea-CompletedJul 2017No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Century Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Century joint Development Private Limited

Century joint Development Private Limited has 1 registration on RERA Karnataka, including Century Central. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Century Central is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Century Central?

The registered promoter entity is Century joint Development Private Limited, a company as per the filing. Its CIN U70200KA2010PTC052710 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Century Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Century Central?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Century Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Century Central. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Century Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.