CENTRUM BUSINESS SQUARE PHASE 1

By SQUAREFEET CONSTRUCTION

RG-MH-28184 · RERA P51700025651 · Last updated on MahaRERA portal: 4 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

CENTRUM BUSINESS SQUARE PHASE 1 is a Others project by SQUAREFEET CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700025651 on 1 Jul 2020. The registration is recorded completed; possession was promised by 30 Jun 2027.

At a glance

Project

  • NameCENTRUM BUSINESS SQUARE PHASE 1
  • TypeOthers
  • Location
    • ROAD NO. 16
    • WAGLE ESTATE
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700025651
  • ReraGenie IDRG-MH-28184

Builder

  • NameSQUAREFEET CONSTRUCTION
  • Entity typePartnership
  • PartnersSACHIN CHANDRU MIRANI, VIVEK MAHESHCHANRA MANGLA, MANSUKH VELJI SHAH, DEEPAK PARASMAL JAIN, MONISH RAMESH SHAH, NIKET RAMESH SHAH, NAVIN PANCHALAL SAVLA, DHAVAL HANSRAJ SAVLA, SAJJANRAJ SAMPATRAJ JAIN, DEEPAK DHARSHI BHEDA, LEENA DHARMENDRA PATEL, RAMESH VELJI SHAH
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJul 2020PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Jul 2020
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IT PARK BUILDING A WINGNA170000
SHOPPING ARCADE BUILDING B WINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

IT PARK BUILDING A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHOPPING ARCADE BUILDING B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed350

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots350
Closed/Covered350
BuildingClosed/CoveredTotal
IT PARK BUILDING A WING275275
SHOPPING ARCADE BUILDING B WING7575

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,669 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI35007.0
Proposed, not sanctioned17,504 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP1 CENTRUM ITPARK WAGLE ESTATE THANE WEST400604

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SUDHIR THORAT APICES STUDIO PVT LTD
EngineerDHARMENDRA K PATEL
Chartered AccountantNEHA AMIT BIYANI
PartnerRole in project
SQUAREFEET CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2025

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING B- FORM 4.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING B- FORM 4.pdf4 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: WING B- FORM 4.pdf4 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: WING B- FORM 4.pdf4 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: WING B- FORM 4.pdf4 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WING A- FORM 4.pdf4 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: 2024-01-06- FORM IV-for 31-12-2023.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 1-04-2021 TO 31-03-22.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-12-2023 (Squarefeet Construction)-compressed.pdf18 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER CERTIFICATE_31-12-23_SQUAREFEET CONSTRUCTION (2).pdf18 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2023 Form 3 - SF Construction (2).pdf18 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC A WING 13-12-2023.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2023 (Squarefeet Construction)-c.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_30-09-23_SQUAREFEET CONSTRUCTION-compressed.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2023 Form 3 - SF Construction-compressed.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2023.pdf14 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2023.pdf14 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2023.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_30-06-23_SQUAREFEET CONSTRUCTION_2.pdf14 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-06-2023 Form 3 - SF Construction (2) (1).pdf14 Sep 2023
Building plan approvalFile: Revised plan new .pdf29 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Revised plan new .pdf29 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Approval D-1 Cc.pdf29 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC D-1 'A' wing.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Architect Certificate 31-12-2022 (Squarefeet Construction) (1).pdf13 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Image 2.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Image 2.pdf11 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2022 FORM 1.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_30-09-22 FORM 2.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_30-09-22 FORM 2.pdf4 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Register CBS B wing.pdf14 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: D-1 Part OC.pdf7 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Squarefeet_Construction__Form_5__FY_2020-21_.pdf28 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC RERA CERTIFICATE Form 2.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificatr D1.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SQ-Feet Constuction FORM 3_compressed.pdf2 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SQ-Feet Constuction_compressed.pdf30 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021-07-29_RERA CERTIFICATE-.pdf28 Jul 2021
Building plan approvalFile: 1 Plan.pdf23 Jul 2021
Building plan approvalFile: 2 Plan.pdf23 Jul 2021
Building plan approvalFile: 3 Plan.pdf23 Jul 2021
Building plan approvalFile: 4 Plan.pdf23 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 1 Plan.pdf23 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 2 Plan.pdf23 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 3 Plan.pdf23 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 4 Plan.pdf23 Jul 2021
Building plan approvalFile: Re-revised drawings 27-01-2021_(2).pdf26 Mar 2021
Building plan approvalFile: Re-revised drawings 27-01-2021_ (1).pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Re-revised drawings 27-01-2021_(2).pdf26 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Re-revised drawings 27-01-2021_ (1).pdf26 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf26 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf26 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf26 Mar 2021
Proforma of Allotment letterFile: CBSAgreement 1-20.pdf23 Mar 2021
Proforma of Allotment letterFile: CBSAgreement 1-20.pdf23 Mar 2021
Proforma of Allotment letterFile: CBS Agreement 21-42.pdf23 Mar 2021
Building plan approvalFile: Re-revised drawings 4-6.pdf11 Mar 2021
Building plan approvalFile: Re-revised drawings 4-6.pdf11 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Re-revised drawings 4-6.pdf11 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Re-revised drawings 4-6.pdf11 Mar 2021
Building plan approvalFile: Page 1 to 5_.pdf28 Jan 2021
Building plan approvalFile: Page 6 to 9.pdf28 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 1 to 5_.pdf28 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 6 to 9.pdf28 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Plan Approval letter.pdf28 Jan 2021
Copy of the legal title reportFile: TITTLE-converted.pdf19 Jun 2020
Layout approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-1.pdf16 Jun 2020
Layout approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-2.pdf16 Jun 2020
Layout approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-3.pdf16 Jun 2020
Building plan approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-4.pdf16 Jun 2020
Building plan approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-5.pdf16 Jun 2020
Building plan approvalFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-6.pdf16 Jun 2020
PAN CardFile: PAN CARD OF SQUAREFEET CONTRUCTION-converted.pdf16 Jun 2020
Details of encumbrancesFile: encumbrances squarefeet contruction.pdf16 Jun 2020
Copy of Layout Approval (in case of layout)File: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-1.pdf16 Jun 2020
Copy of Layout Approval (in case of layout)File: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-2.pdf16 Jun 2020
Copy of Layout Approval (in case of layout)File: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-3.pdf16 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-4.pdf16 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT OF SQUAREFEET CONSTRUCTION-compressed-5.pdf16 Jun 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CENTRUM BUSINESS SQUARE PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGLE ESTATE7,600+ in Thane

2 kmCENTRUM BUSINESS SQUARE Completed 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: SQUAREFEET CONSTRUCTION

SQUAREFEET CONSTRUCTION has 2 registrations on MahaRERA, including CENTRUM BUSINESS SQUARE PHASE 1 and CENTRUM BUSINESS SQUARE PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CENTRUM BUSINESS SQUARE PHASE 1 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CENTRUM BUSINESS SQUARE PHASE 1?

The registered promoter entity is SQUAREFEET CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CENTRUM BUSINESS SQUARE PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CENTRUM BUSINESS SQUARE PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CENTRUM BUSINESS SQUARE PHASE 1?

The professionals named in the filing: Architect: AR SUDHIR THORAT APICES STUDIO PVT LTD; Engineer: DHARMENDRA K PATEL; Chartered Accountant: NEHA AMIT BIYANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CENTRUM BUSINESS SQUARE PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTRUM BUSINESS SQUARE PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTRUM BUSINESS SQUARE PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.