Registration approved Residential/Group Housing project

Casagrand Florella

By Casa Grande Garden City Builders Private Limited

RG-KA-06127 · RERA PRM/KA/RERA/1251/308/PR/210319/004044 · Last updated on RERA Karnataka portal: 26 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • 12 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2023Possession promisedmoved 12 months from the original
12Complaints at RERA Karnatakaon this registration
Jump to the 80 documents Report an error

Casagrand Florella is a Residential/Group Housing project by Casa Grande Garden City Builders Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210319/004044 on 19 Mar 2021. Possession is promised by 9 Mar 2023. The completion date has moved by 12 months from the original filing. 12 complaints are on record with the regulator.

At a glance

Project

  • NameCasagrand Florella
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/210319/004044
  • ReraGenie IDRG-KA-06127

Builder

  • NameCasa Grande Garden City Builders Private Limited
  • Entity typeCompany
  • CINU45205KA2015PTC082415
  • Authorized SignatoryKarjee Kishore Kumar
  • DirectorsArun Kumar M N, K R Anerudan
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2021First promiseMar 2022Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Mar 2021
  • Promised completion9 Mar 2023
  • Revised completionRevised to 9 Mar 2023 (originally 9 Mar 2022)
  • Buildings3 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block 1---11011
Block 2---20020
Block 3---505

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 26 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,980 sq m
Named landowners1
LandownerVillageDistrict
Casa Grande Garden City Builders Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.59 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPraveen
EngineerSuresh

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/308/PR/220819/004044Mar 2022 → Mar 2023

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka12

Case no.ComplainantRespondentFiled
CMP/220616/0009641-Casa Grande Garden City Builders Private Limited16/06/2022
CMP/221221/0010496-Casa Grande Garden City Builders Private Limited21/12/2022
01833/2023-Casa Grande Garden City Builders Private Limited15/12/2023
00986/2024-Casa Grande Garden City Builders Private Limited07/10/2024
01000/2024-Casa Grande Garden City Builders Private Limited10/10/2024
01007/2024-Casa Grande Garden City Builders Private Limited15/10/2024
01014/2024-Casa Grande Garden City Builders Private Limited15/10/2024
01015/2024-Casa Grande Garden City Builders Private Limited15/10/2024
01086/2024-Casa Grande Garden City Builders Private Limited07/11/2024
00247/2025-Casa Grande Garden City Builders Private Limited05/02/2025
00248/2025-Casa Grande Garden City Builders Private Limited05/02/2025
00249/2025-Casa Grande Garden City Builders Private Limited05/02/2025

Documents filed80

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210319/004044 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Clarification on KSPCB NOCFile: KSPCB NOC Validity clarification.pdf26 Apr 2022
List of AllotteesFile: FLORELLA PH 1 Sold Vs Unsold.XLSX26 Apr 2022
Sold and unsold unit detailsFile: FLORELLA PH 1 Sold Vs Unsold.XLSX26 Apr 2022
Clarification on Cost DetailsFile: Clarification on Cost Details.pdf26 Apr 2022
Clarification on Area DetailsFile: Clarification on Area Details.pdf26 Apr 2022
Structural Stability CertificateFile: Florella Phase 1 Stability certificate.pdf26 Apr 2022
STP DemarcationFile: Florella sanction drawing with STP location.pdf26 Apr 2022
Proforma AOSFile: Agreement draft as per RERA - Final.pdf26 Apr 2022
Proforma Allotment LetterFile: FLORELLA ALLOTMENT LETTER.pdf26 Apr 2022
BrochureFile: Brochure Florella Ph 1.pdf26 Apr 2022
BWSSB NOCFile: Panchayat Water NOC.pdf26 Apr 2022
BESCOM NOCFile: BESCOM NOC Sy no 214.pdf26 Apr 2022
CertificateFile: Certificate of Incorporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer work completed.pdf-
CA Certificate for Funds UtilizationFile: CA Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer - work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Fund Required.pdf-
AffidavitFile: Florella PH 1- Affidavit.pdf-
Latest Encumbrance CertificateFile: Upto date EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 2File: Florella PH 1 - Form B.pdf-
Document 3File: Florella PH 1 - Seeking Extension.pdf-
Document 4File: Florella Queries Answered.pdf-
Building License-
Approved Plans-
Approved Plans-
Board Resolution-
Sale Deed S Medahalli-
Approved Plans-
Approved Plans-
Project Specification-
Upto date Encumbrance Certificate-
Sec 3(1) Non-violation affidavit-
Khatha-
MOA and AOA-
Conversion order 214 SR97-
Unnamed document-
Unnamed document-
Unnamed document-
Relinguishment Deed for both road and land bank-
Unnamed document-
Unnamed document-
NOC-BESCOM-
NOC-Water-
NOC-KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Approved Plans-
License plan and specification-
Unnamed document-
Balance Sheet 2019 - 2020File: Submission.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2018-19.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet 2017-18.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Submission.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and loss 2018-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit and loss 2017-18.pdf-
Director's Report 2019 - 2020File: Submission.pdf-
Cash Flow Statement 2019 - 2020File: Submission.pdf-
Cash Flow Statement 2018 - 2019File: Cash flow 2018-19.pdf-
Auditor's Report 2019 - 2020File: Submission.pdf-
Auditor's Report 2018 - 2019File: Audit Report 2018-19.pdf-
Auditor's Report 2017 - 2018File: Audit Report 2017-18.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Submission.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR for 2018-19.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR for 2017-18.pdf-
Form-B Affidavit-
Prospectus/BrochureFile: PRMKARERA1251308PR210319004044.pdf-
Tower Excel SheetFile: Casagrand Florella - Rera Template.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Casagrand Royce-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Casagrand Florella on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmCasagrand FlorellaOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: Casa Grande Garden City Builders Private Limited

Casa Grande Garden City Builders Private Limited has 2 registrations on RERA Karnataka, including Casagrand Florella and CASAGRAND FLAMINGO. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Casagrand Florella is delayed beyond 9 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Casagrand Florella?

The registered promoter entity is Casa Grande Garden City Builders Private Limited, a company as per the filing. Its CIN U45205KA2015PTC082415 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Casagrand Florella?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Casagrand Florella?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Casagrand Florella?

The professionals named in the filing: Architect: Praveen; Engineer: Suresh. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Casagrand Florella?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Casagrand Florella. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Casagrand Florella to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.