Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Sep 2026Possession promisedmoved 21 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 28 documents Report an error

CARMEL HEIGHTS is a Residential/Group Housing project by M/s.Oceanus Dwellings Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180924/002016 on 24 Sep 2018. Possession is promised by 30 Sep 2026. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCARMEL HEIGHTS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/180924/002016
  • ReraGenie IDRG-KA-25376

Builder

  • NameM/s.Oceanus Dwellings Private Limited
  • Entity typeCompany
  • CINU07010KA2003PTC031632
  • Authorized SignatoryMr.V.Narasimha Reddy

Key dates

this monthRegisteredSep 2018First promiseDec 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Sep 2018
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1---2540254

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 15 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,710 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 106.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2024 → Sep 2025

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/260625/002016Sep 2025 → Sep 2026

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00789/2024-M/s.Oceanus Dwellings Private Limited23/08/2024

Documents filed28

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180924/002016 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OC application AckFile: OC application Ack.pdf15 Dec 2025
KSPCB NOCFile: KSPCB NOC.pdf15 Dec 2025
AAI NOCFile: AAI NOC.pdf15 Dec 2025
BSNL NOCFile: BSNL NOC.pdf15 Dec 2025
Revised FIre NOC-Carmel HeightsFile: Revised FIre NOC-Carmel Heights.pdf15 Dec 2025
BWSSB NOCFile: BWSSB NOC.pdf15 Dec 2025
BESCOM Power SanctionFile: BESCOM Power Sanction.pdf15 Dec 2025
CertificateFile: certificate of incorporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Caramel Architect Certificate Form Ex1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form EX5 Engineer Certificate.pdf-
CA Certificate for Funds UtilizationFile: FORM EX-3 CA Certficate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Caramel Architect Certificate Form EX2.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form EX6 engineer certificate.pdf-
CA Certificate for Funds required for Project CompletionFile: Form EX-4 CA Certificate.pdf-
AffidavitFile: Extension Affidavit.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: OC Acknowlegement.jpeg-
PLAN-CARMEL-
Oceanus sd-
PLAN-CARMEL-
EC Oceanus-
Katha-INC-
JDA-
NOC's-
CONV-INC-
Prospectus/BrochureFile: Carmel Heights Brochure.PDF-
Advertisement Copy 1File: Carmel Heights Brochure.PDF-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_180924_002016.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep CARMEL HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s.Oceanus Dwellings Private Limited

M/s.Oceanus Dwellings Private Limited has 1 registration on RERA Karnataka, including CARMEL HEIGHTS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if CARMEL HEIGHTS is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of CARMEL HEIGHTS?

The registered promoter entity is M/s.Oceanus Dwellings Private Limited, a company as per the filing. Its CIN U07010KA2003PTC031632 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in CARMEL HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CARMEL HEIGHTS?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in CARMEL HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CARMEL HEIGHTS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CARMEL HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.