Home / Browse projects / Bengaluru Urban, Karnataka / CANVAS AND COVE PHASE 1 WING C AND D

Registration approved Residential/Group Housing project

CANVAS AND COVE PHASE 1 WING C AND D

By APG Habitat Private Limited

RG-KA-02379 · RERA PRM/KA/RERA/1251/310/PR/200702/003480 · Last updated on RERA Karnataka portal: 30 Sep 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 89 documents Report an error

CANVAS AND COVE PHASE 1 WING C AND D is a Residential/Group Housing project by APG Habitat Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200702/003480 on 2 Jul 2020. Possession is promised by 31 Mar 2025.

At a glance

Project

  • NameCANVAS AND COVE PHASE 1 WING C AND D
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200702/003480
  • ReraGenie IDRG-KA-02379

Builder

  • NameAPG Habitat Private Limited
  • Entity typeCompany
  • CINU70109KA2016PTC093453
  • Authorized SignatorySomasundaram Thiruppathi
  • Other registrations3 more →

Key dates

this monthRegisteredJul 2020PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Jul 2020
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing C---2100210
Wing D---2400240

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,592 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 173.34 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKishore Panikkar
EngineerArun Karanth N

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed89

As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200702/003480 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Covering LetterFile: Covering Letter.pdf30 Sep 2025
Occupancy Certificate Wing DFile: OC -WING D -240 Units.pdf30 Sep 2025
Occupancy Certificate Wing C & Club HouseFile: Occupancy Certificate- Block C & Club House-210 units.pdf30 Sep 2025
Previous submitted letterFile: Letter.pdf30 Sep 2025
Covering LetterFile: Letter.pdf30 Jul 2025
Quarterly Update Ack-March 2025File: Quarterly Update Details-march 2025.pdf30 Jul 2025
Quarterly Update Ack-June 2025File: Quarterly Update Details-march 2025.pdf30 Jul 2025
RERA Bank Account ClarificationFile: RERA Bank Account Clarification.pdf30 Jul 2025
Encumbarance till DateFile: EC- Up to Date.pdf18 Jun 2020
Conversion OrdersFile: Conversion Orders.pdf18 Jun 2020
Site DemarkcationFile: Site PLan PHASE Demarcation-Model.pdf18 Jun 2020
Site PlanFile: Site Plan-compressed.pdf18 Jun 2020
Floor Plan 1 to 9th FloorFile: 1to9th floor-compressed_compressed.pdf18 Jun 2020
Floor Plan 10 to 15th FloorFile: 10 to 15th Floor-compressed_compressed.pdf18 Jun 2020
Floor Plan 16 to 25th FloorFile: 16 to 25 Floor-compressed_compressed.pdf18 Jun 2020
Floor Plan 26th to BasementFile: 26 to Lower Basement-compressed_compressed.pdf18 Jun 2020
Basement to Elevation Floor PlanFile: Lower Basement to Upper Basement-compressed_compressed.pdf18 Jun 2020
CertificateFile: Annexure-7-COI.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Annexure 3-Architect certificate for work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Annexure 4-Engineer certificate for work completed.pdf-
CA Certificate for Funds UtilizationFile: Annexure 5-CA Certificate for fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Annexure 6-Architect certificate for work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Annexure 7-Engineer certificate for work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Annexure 8-CA Certificate for fund required.pdf-
AffidavitFile: Annexure 10-Afidavit for seeking Extension.pdf-
Latest Encumbrance CertificateFile: Annexure 10-Latest EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Annexure 12-Consents from customers.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Consent from customer.pdf-
Annexure-10aBBMP Letter of Plan Sanction-
Annexure-10b Site Plan-
Annexure-13 Sections-
Annexure-17-Proforma Sale Deed-
Annexure-11-ATS-
Annexure-12 -Sale deed & RTC-
Annexure-13 Sections-
Annexure-14 Development Plan Drawing-
Annexure-15-Allotment Letter-
Annexure-16 Canvas & Cove E-Brochure_Dec_10-
Annexure-18 Spec & Amenities-
Annexure-9 -EC-
Annexure -35 Affidavit of Violation-
Annexure -34-Joint Affidavit-
Annexure-20- Khata-
Annexure-19a-JDA & GPA-
Unnamed document-
Annexure-21- Conversion order-
Unnamed document-
Annexure-32-Relinquishment Deed-
Annexure-22 FIRE NOC-
Annexure-23 AAI NOC-
Annexure-24 Begur Bescom NOC-
Annexure-25 Begur BWSSB NOC --
Annexure-26 KSPCB-
Annexure-27 MOEF NOC-
Annexure-28 Begur BSNL NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Annexure-29 Section Plan at Ground Floor-
Annexure-30-Sectional drawing of Apartments-
Unnamed document-
Balance Sheet 2017 - 2018File: Annexure-1c-BS-18-19.pdf-
Balance Sheet 2016 - 2017File: Annexure-1b-BS-17-18.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Annexure-2c-P&L-18-19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Annexure-2b-P&L-17-18.pdf-
Director's Report 2017 - 2018File: Annexure-3c-DR-18-19.pdf-
Director's Report 2016 - 2017File: Annexure-3b-DR-17-18.pdf-
Cash Flow Statement 2017 - 2018File: Annexure-4c-Cf-18-19.pdf-
Auditor's Report 2017 - 2018File: Annexure-5c-AR-18-19.pdf-
Auditor's Report 2016 - 2017File: Annexure-5b-AR-17-18.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Annexure-6c-ITR-18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Annexure-6b-ITR-17-18.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep CANVAS AND COVE PHASE 1 WING C AND D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmCANVAS AND COVE PHASE 1 Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: APG Habitat Private Limited

APG HABITAT PRIVATE LIMITED has 4 registrations on RERA Karnataka, including Assetz Canvas & Cove 2.0 - Block A and Assetz Canvas & Cove 2.0 - Block B & C. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if CANVAS AND COVE PHASE 1 WING C AND D is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of CANVAS AND COVE PHASE 1 WING C AND D?

The registered promoter entity is APG Habitat Private Limited, a company as per the filing. Its CIN U70109KA2016PTC093453 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in CANVAS AND COVE PHASE 1 WING C AND D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CANVAS AND COVE PHASE 1 WING C AND D?

The professionals named in the filing: Architect: Kishore Panikkar; Engineer: Arun Karanth N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CANVAS AND COVE PHASE 1 WING C AND D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CANVAS AND COVE PHASE 1 WING C AND D. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CANVAS AND COVE PHASE 1 WING C AND D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.