Home / Browse projects / Bengaluru Urban, Karnataka / CANDEUR NOVO GARDENIA
CANDEUR NOVO GARDENIA
By NOVOLIFE INNOVATIVE STRUCTURES LLP
RG-KA-47557 · RERA PRM/KA/RERA/1251/309/PR/070324/006697 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
CANDEUR NOVO GARDENIA is a Residential/Group Housing project by NOVOLIFE INNOVATIVE STRUCTURES LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/070324/006697 on 7 Mar 2024. Possession is promised by 31 Dec 2027. 166 of the 332 units on this registration are recorded sold or booked, and 5 of 19 construction stages are filed complete.
At a glance
Project
- NameCANDEUR NOVO GARDENIA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/309/PR/070324/006697
- ReraGenie IDRG-KA-47557
Builder
- NameNOVOLIFE INNOVATIVE STRUCTURES LLP
- Entity typePartnership Firm
- LLPINABA-5415
- GSTIN29AATFN7496G1ZA
- Authorized SignatoryKATAMREDDY SRIKANTH REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Mar 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed189 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 126 | 0 | 126 |
| Toer B | - | - | - | 110 | 0 | 110 |
| Tower C | - | - | - | 96 | 0 | 96 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 19 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 95%.
Building: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 95% |
| Masonry Construction | 90% |
| Plastering inside , outside & Ceiling | 95% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 75% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 80% |
| Railing and Grill fixing | 80% |
| Electrification, Water supply and Sanitary Finishing | 75% |
| Painting | 80% |
| Fire prevention and fire fighting fitting and fixture with network | 85% |
| Weather Proof work(tile,concrete) | 20% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 20% |
| Elevation work | 90% |
| Internal and External work including landscapes as per sanctioned drawings | 90% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 35% |
| Sewage and Drainage System | Yes | 55% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 10% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 65% |
| Electricity supply transformer and substation | Yes | 55% |
| Storm water drains | Yes | 25% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 60% |
| Parks & Tree planting | Yes | 50% |
| Street Lighting | Yes | 55% |
| Electricity | Yes | 60% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 40% |
| Club House | Yes | 65% |
| Community Hall | Yes | 45% |
| Outdoor Sports facility | Yes | 55% |
| Indoor Sports facility | Yes | 30% |
| Swimming Pool | Yes | 55% |
| Gym | Yes | 25% |
| Parks | Yes | 50% |
| Power Backup | Yes | 35% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 35% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 95% |
| Lifts | Yes | 80% |
| Corridor/Lobbies | Yes | 90% |
| Fire escapes | Yes | 75% |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 99% |
| Terrace | Yes | 90% |
| Outer Wall | Yes | 95% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership156
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MR. ASHOK KUMAR | - | - |
| MR. VED PRAKASH | - | - |
| MR. RAKESH KUMAR | - | - |
| MR. PRIYA RANJAN PADHI | - | - |
| MR. VEERAIAH K.M, | - | - |
| MR. GUNDURAO V PADA,KI, | - | - |
| MR. RAMESHA VARNA B | - | - |
| MR. KARTHICK RAJARAM, | - | - |
| MR. VENKATA SUBASH BATHULA | - | - |
| MR. RAHUL KUMAR | - | - |
| MR. GOURAV SONI, | - | - |
| MR. RATIKANTA PRADHAN | - | - |
| MR. ANANTA NARAYAN PRADHAN | - | - |
| MR. JEEVAN KURIAKOSE | - | - |
| MRS. VIDUSHI GURUDEV | - | - |
| MR. JALADI SRINMSA RAO | - | - |
| MRS. HEMAVATHI NAYAK T | - | - |
| MR. VMK SHUKLA | - | - |
| MR. KAMINI KANTA MOHAPATRA | - | - |
| MR.MAHENDAR KUMAR PALLERLA | - | - |
| MRS. SOMA CHOWDHURY | - | - |
| MR. BABAVALI SHAIK | - | - |
| MRS. PAVANI RAKONDA | - | - |
| MRS. JILU JOSE | - | - |
| MRS. SANGITA KUMARI | - | - |
| MR. NIKHILESH C.K | - | - |
| MR. KANTHARAJ N.N | - | - |
| MR. GURURAJ S | - | - |
| MR. ANISH P KUMAR | - | - |
| MR. SUBHASIS MOHAPATRA | - | - |
| MR. MUKESH MAHESHWARI | - | - |
| MR. BHUWANESH KUMAR SHARMA | - | - |
| MR. TARA CHAND MAHUR | - | - |
| MRS. TALASILA SPANDANA | - | - |
| MRS. SWAPNA KANDANURU | - | - |
| MRS. VANKA SRIDIVYA MANOJA | - | - |
| MRS. KANCHANA KRISHNADOSS | - | - |
| MR. AVNEESH SINGH VERMA | - | - |
| MRS. PRIYA ELANGO | - | - |
| MR. ATIT MISHRA | - | - |
| MR. ARVISHWA KUMAR SINGH | - | - |
| MR. KARNATI CHINA SRINIVASULU REDDY | - | - |
| MR. ABDULLA T | - | - |
| MRS. MAJJI GOWRI ANDALURI | - | - |
| Mr Swaroop Yalagi | - | - |
| MR. T. PONNARASU | - | - |
| MR. RAVI KUMAR N | - | - |
| MR. ASHISH AGARWAL | - | - |
| MR. VINAY KRISHNA | - | - |
| MRS. JAYA SHARMA | - | - |
| MRS. SHALINI AGRAWAL | - | - |
| MR. P.JEYAPAUL | - | - |
| MRS. ALANKRITHA G | - | - |
| MRS. K. JHANSI | - | - |
| MRS. KANDUKURI REDDY SINDHUJA | - | - |
| MR. GUPTA PRASAD PANDA | - | - |
| MRS. NIDHI GUPTA | - | - |
| MR. RAHUL R. MADURWAR | - | - |
| MR. VENKATACHALI G R | - | - |
| MRS. GEETANJALI CHOUDHURY | - | - |
| MR. CR NAGENDRA | - | - |
| MRS. SOUMYA NAYAK | - | - |
| MRS. KOSURU SUJATHA | - | - |
| MR. BHASKER REDDY G | - | - |
| MRS. POONAM GARG ALIAS POONAM KUMARI GOYAL, | - | - |
| Mr. YOGESH KUMAR BANSAL | - | - |
| MR. ABHIJIT KUMAR PARIRA | - | - |
| MR. ANIL KUMAR VAYIGANDLA | - | - |
| MRS.MANORMA GUPTA | - | - |
| MR. DEEP ANAND | - | - |
| Mr GAURAV GUPTA | - | - |
| MRS. DHARITRI NAYAK | - | - |
| MR. AJOY KUMAR NAIK | - | - |
| MR. ABHIRAM KRISHNAN | - | - |
| MRS. ANJALI SA | - | - |
| MRS. SUNITHA BETHALA | - | - |
| MR. HARISH CHANDRA GUPTA | - | - |
| MR. KULBHUSHAN BHAIJI PATARIYA | - | - |
| MR.SACHIN SINGH RATHORE | - | - |
| MR. GOKUL PUGALENDI | - | - |
| MRS. PREETI LAKDAWALA | - | - |
| MR. UMAKANT D AMBADEKAR | - | - |
| MR. ARUN KUMAR KUNDRA | - | - |
| MR. S. GOPALAKRISHNAN | - | - |
| MR. MOCHARLA APPALA HANU SUDARSAN | - | - |
| MR. RAMESH BABU NALLAGOPULA | - | - |
| MR. MANISH KUMAR | - | - |
| Mr. RAVIKIRAN YERRAMALLE | - | - |
| MR. DURGA VITTAL GOPAL DASAMANTHARAO | - | - |
| MR. SYAMA SUNDARA DAS | - | - |
| MRS. MOUSUMI PRADHAN | - | - |
| MR. SUSANTA KUMAR MOHANTY | - | - |
| MRS. GAYATRI CHARCHI | - | - |
| MRS. TEJASWINI BALIARSINGH | - | - |
| MR. BALA SUDHEER REDDY RACHUMALLA | - | - |
| MR. PIDUGU SRIKANTH | - | - |
| MR. SRINIVASAN KUPPUSAMY | - | - |
| MR. MINAL BAJAJ, | - | - |
| MRS. R. NAGA JYOTHI | - | - |
| MRS. RUHI SANTOSH SINGH | - | - |
| MR. AVINASH KUMAR | - | - |
| MRS. CHANDSMITA MUNI | - | - |
| Mrs PVS M LAKSHMT | - | - |
| MR. AWNISH KUMAR | - | - |
| Mrs KALAKOTT PRIYNKA | - | - |
| MR. RAKESH KUMAR SABAT | - | - |
| MR. SAMARJIT PATTNAIK | - | - |
| MR. BALAKRISHNA VADLAMUDI | - | - |
| MRS. PRAVALLIKA BIJJULA | - | - |
| MRS. ARCHANA RAJAN | - | - |
| MRS. V HARSHAVANDHINI | - | - |
| MRS, VIDYA Y MARIGOUDAR | - | - |
| MR. UJJWAL KUMAR SARKAR | - | - |
| MR. DEEPAK R | - | - |
| MR. PRABODH PRASAD PANDA | - | - |
| MRS. NALLURI SREELATHA | - | - |
| MRS. CHAKKA VIJAYA LAKSHMI | - | - |
| MRS. RITU SINGH | - | - |
| MR. VIKASH RANJAN | - | - |
| MRS. GANDLA SAILAJA | - | - |
| MR. MIHIR RANJAN TRIPATHY | - | - |
| MRS. CHTGTCHERLA SWArHr | - | - |
| MR. SANJEEV KUMAR | - | - |
| MR. BALAJI JEYABALAN | - | - |
| MR. NIRANJAN KUMAR SURA | - | - |
| MR. ASHISH RAMESH NARKALE | - | - |
| MR. MILIND N AGRAWAL | - | - |
| MRS. JYOTHI DOMAKUNTLA | - | - |
| MR. KISHORE SAMIREDDY | - | - |
| MRS. LOKNADAM SUSHMA HARIHARRAO | - | - |
| MRS. PUTCHALA MOUNIKA | - | - |
| MRS. RAJKUMARI | - | - |
| MR. SUBBARAMAIAH MANDAVA | - | - |
| MR. SAILESH YAKKALA | - | - |
| MR. VIBHASH RANJAN | - | - |
| MRS. RACHUMALLA HIMABINDU MADHAVI | - | - |
| MRS. THAMATAM TEJASWI | - | - |
| MRS. LAXMI SINGH | - | - |
| MRS. ROONA SHREE | - | - |
| MR. PANKAJ KUMAR SAINI | - | - |
| Mr PRATYUSH | - | - |
| MRS. AMRITA ROUT | - | - |
| MR. HRUSHIKESH S MAHALATHKAR | - | - |
| MR. B. RAVI | - | - |
| MR. ATUL MISHRA | - | - |
| MR. VINIT AGRAWAL | - | - |
| MR. SIDDANNA I HOSUR | - | - |
| MR. ASHOK KUMAR | - | - |
| MR. CR NAGENDRA | - | - |
| MRS. PRIYANKA MOHAPATRA | - | - |
| MR. DEEPAK KAIKINI | - | - |
| MR. RANJAY KUMAR | - | - |
| MRS.SUNANDA RACHAMALLU | - | - |
| MR.SIDDANNA I HOSUR | - | - |
| P Shanthi | - | - |
| P Shanthi | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 165.12 cr | Rs 9.51 cr |
| On-site expenditure-Site Overhead | Rs 8.00 cr | Rs 38.26 lakh |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 8.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.00 cr | Rs 1.15 cr |
| On-site expenditure-Salaries of workers | Rs 78.85 lakh | Rs 38.26 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Nagendranath Reddy |
| Engineer | Ramesh B |
| Chartered Accountant | RAMA KRISHNA ANIMIREDDI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed189
As listed on the registration, under the names the promoter filed them with; the newest 80 of 189 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/070324/006697 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 A.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 E.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 13 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 11 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect_(Q1)_04JUL2026(JUN2026).pdf | 11 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form6 Candeur Novo Gardenia.pdf | 11 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 11 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 11 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 11 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 11 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 11 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4-Q4-FY2025-26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5-Q4-FY2025-26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6-Q4-FY2025-26.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 13 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q3 FY2025-26.pdf | 10 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q3 FY25-26.pdf | 10 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q3 FY2025-26.pdf | 10 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 10 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 10 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 10 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 10 Jan 2026 |
| Affidavit FormBFile: Affidavit FormB.pdf | 2 Mar 2024 |
| Affidavit Non LitigationFile: Affidavit Non Litigation.pdf | 2 Mar 2024 |
| Affidvavit NotarisedFile: Affidvavit Notarised.pdf | 2 Mar 2024 |
| Affidvit cum DeclarationFile: Affidvit cum Declaration.pdf | 2 Mar 2024 |
| Clarification for Source of FundFile: Clarification for Source of Fund.pdf | 2 Mar 2024 |
| Bank Statement Sandeep ReddyFile: Bank Statement Sandeep Reddy.pdf | 2 Mar 2024 |
| Term Sheet Novo GardeniaFile: Term Sheet Novo Gardenia.pdf | 2 Mar 2024 |
| FINANCIALS_SIGNED FY 2023-24File: FINANCIALS_SIGNED FY 2023-24.pdf | 2 Mar 2024 |
| ITR Acknowledgement -NagendraFile: ITR Acknowledgement -Nagendra.pdf | 2 Mar 2024 |
| ITR Acknowledgement -Sandeep ReddyFile: ITR Acknowledgement -Sandeep Reddy.pdf | 2 Mar 2024 |
| ITR Acknowledgement -Srikanth ReddyFile: ITR Acknowledgement -Srikanth Reddy.pdf | 2 Mar 2024 |
| ITR Acknowledgement -Srikar ReddyFile: ITR Acknowledgement -Srikar Reddy.pdf | 2 Mar 2024 |
| Novo Bank StatementFile: NOVO Bank Stmt Dec 23 to 19th Feb 24.pdf | 2 Mar 2024 |
| Title deed GPA 13 & 17File: GPA 13 & 17.pdf | 20 Feb 2024 |
| Title deed GPA 6, 7, 15 & 10File: GPA 6 7 15 10 Compressed.pdf | 20 Feb 2024 |
| Title Deed JDA 6, 7, 15 & 10File: JDA 6 7 15 10.pdf | 20 Feb 2024 |
| Title Deed JDA 13 & 17File: JDA 13 & 17.pdf | 20 Feb 2024 |
| Title Deed - Sale Deed 215-6 & 7File: SALE DEED 215-6 & 7 compressed.pdf | 20 Feb 2024 |
| Title Deed SALE DEED 215-10File: SALE DEED 215-10 1 to 60 compressed.pdf | 20 Feb 2024 |
| Title Deed Sale Deed SALE DEED 215-13 157File: SALE DEED 215-13 157.pdf | 20 Feb 2024 |
| Title Deed SALE DEED 215-15 61-79File: SALE DEED 215-15 61-79.pdf | 20 Feb 2024 |
| Title Deed SALE DEED 215-17 157File: SALE DEED 215-17 157.pdf | 20 Feb 2024 |
| Notarised AffidavitFile: Affidvavit Notarised.pdf | 20 Feb 2024 |
| Estimated Cost of ConstructionFile: Est Cost Novo.pdf | 20 Feb 2024 |
| NOC BWSSBFile: NOC BWSSB.pdf | 20 Feb 2024 |
| STPFile: STP Plan.pdf | 20 Feb 2024 |
| Source of FundFile: Source of Fund.pdf | 17 Feb 2024 |
| Bank AffidavitFile: Bank-Affidavit.pdf | 17 Feb 2024 |
| GST CertificateFile: GST Certificate Novo Signed.pdf | 17 Feb 2024 |
| Firm Financials for FY 23-24File: Pro fin FY 23-24.pdf | 17 Feb 2024 |
| Clarification for the financial statments of FirmFile: Clarification for Fin Novo.pdf | 17 Feb 2024 |
| Clarification for Commencement CertificateFile: Clarification for Cc.pdf | 17 Feb 2024 |
| Form 6File: Form6 Novo Gardenia .pdf | 17 Feb 2024 |
| RTCFile: RTC 13.pdf | 17 Feb 2024 |
| RTCFile: RTC 215-6, 7, 15, 10, 17.pdf | 17 Feb 2024 |
| Clarification for relinquishment deedFile: Clarification for relinqueshment deed.pdf | 17 Feb 2024 |
| Aminities & Common area detailsFile: Amenities and CA Details of Candeur Novo Gardenia Signed.pdf | 17 Feb 2024 |
| Estimated Cost of COnstructionFile: Estimated cost Novolife Signed.pdf | 17 Feb 2024 |
| Specifications candeur Novo gardenia SignedFile: Specifications candeur Novo gardenia Signed.pdf | 17 Feb 2024 |
| Proforma Agreement for SaleFile: Proforma Agreement for Sale.pdf | 17 Feb 2024 |
| Proforma Allotment LetterFile: Proforma Allotment Letter.pdf | 17 Feb 2024 |
| Clarification for ECFile: Clarification for EC.pdf | 17 Feb 2024 |
| NOC AirportFile: NOC Airport Authority.pdf | 17 Feb 2024 |
| NOC BESCOMFile: NOC BESCOM Signed.pdf | 17 Feb 2024 |
| NOC BESCOMFile: NOC BESCOM.pdf | 17 Feb 2024 |
| NOC BSNLFile: NOC BSNL.pdf | 17 Feb 2024 |
| Noc forestFile: NOC Forest.pdf | 17 Feb 2024 |
| Noc forestFile: NOC Forest.pdf | 17 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep CANDEUR NOVO GARDENIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: NOVOLIFE INNOVATIVE STRUCTURES LLP
NOVOLIFE INNOVATIVE STRUCTURES LLP has 1 registration on RERA Karnataka, including CANDEUR NOVO GARDENIA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if CANDEUR NOVO GARDENIA is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of CANDEUR NOVO GARDENIA?
The registered promoter entity is NOVOLIFE INNOVATIVE STRUCTURES LLP, a partnership firm as per the filing. Its LLPIN ABA-5415 and GSTIN 29AATFN7496G1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in CANDEUR NOVO GARDENIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at CANDEUR NOVO GARDENIA?
The professionals named in the filing: Architect: Bommu Veera Nagendranath Reddy; Engineer: Ramesh B; Chartered Accountant: RAMA KRISHNA ANIMIREDDI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CANDEUR NOVO GARDENIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback