ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / CANDEUR ICON PHASE I

Registration approved No litigation declared Mixed Development project

CANDEUR ICON PHASE I

By M/s CANDEUR CONSTRUCTIONS

RG-KA-17861 · RERA PRM/KA/RERA/1251/446/PR/311026/009066

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jump to the 617 documents Report an error

CANDEUR ICON PHASE I is a Mixed Development project by M/s CANDEUR CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/311026/009066 on 31 Oct 2026. Possession is promised by 1 Aug 2032.

At a glance

Project

  • NameCANDEUR ICON PHASE I
  • TypeMixed Development
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/311026/009066
  • ReraGenie IDRG-KA-17861

Builder

  • NameM/s CANDEUR CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29AAPFC8451Q1ZF
  • Authorized SignatoryKatamreddy Srikanth Reddy
  • Other registrations2 more →

Key dates

this monthRegisteredOct 2026PromisedAug 2032

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Oct 2026
  • Promised completion1 Aug 2032
  • Revised completionNone
  • Buildings7 building records
  • Documents filed617 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-----191
B-----196
C-----191
D-----260
E-----191
F-----191
Commercial 1---066

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership90

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners90
LandownerVillageDistrict
Nagendra Puthamakula--
Smt. Shanti Puthamakula and One--
Nagendhra Puthamakula--
Smt. Shanti Puthamakula and One--
Nagendhra Puthamakula--
Nagendra Puthamakula--
Shanthi Puthamakula--
M/s. Nikhar Estates LLP by P. Nagendra--
M/s. Nikhar Estates LLP by P. Nagendra--
Satvik Developers--
Ashok Kumar--
CR Nagendhra--
Ashok Kumar--
CR Nagendhra--
Sathvik Developers (Ashok Kumar)--
Sathvik Developers (Ashok Kumar)--
NIKHAR ESTATES LLP--
Sathvik Developers (Ashok Kumar)--
R Ravi Kant Singal &Others--
Mr. Krishan Kumar and Others--
Mr. Kali Vamsi Krishna and Others--
Smt. Swati Kumari and others--
Mr. Veerendrapratap Singh and Others--
Mrs. Deepthi Vodapalli and Others--
Mrs. Deepthi Vodapalli and Others--
Mrs Shreelakshmi Janardhanan Nallasura and Others--
Mrs Shreelakshmi Janardhanan Nallasura and Others--
Segu Praveen Kumar and Others--
Segu Praveen Kumar and Others--
Segu Praveen Kumar and Others--
BK Venugopal--
Smt. Chaithanya Patibandla and others--
Hello Tena Leno and Others--
Mrs. Helo Tena Leno and Others--
Mrs Helo Tena Leno--
Smt. Shanti Puthamakula and One--
Shanti P--
M/s. Winterberry Dreamspace LLP--
M/s Winterberry Dreamspace LLP--
M/s. Nikhar Estates LLP--
M/s. Nikhar Estates LLP--
M/s. Winterberry Dreamspace LLP--
M/s. Nikhar Estates LLP--
GK Dhanaraj--
G K Nagaraj--
GC Jagadhish--
Rajendra Babu and Others--
Nelvie Developers LLP (Represented by Nagesndra Puthamakula)--
Shanti P--
Rajendra Babu & Others--
Sathyanarayana--
M/s. Winterberry Dreamspace LLP--
M/s. Pasupati Barter LLP--
Nagendra Puthamakula--
GM VENUGOPAL--
Smt. Gowramma--
Purushotham GA and Others--
Purushotham GA and Others--
Purushotham GA and Others--
Smt. Mallamma and Others--
Smt. Mallamma and Others--
G K Suresh--
V. Ramaiah--
Smt. B.R. Harishilpa--
Raghu BS and Others--
M/s. Nikhar Estates LLP--
Mr. Krishan Kumar and Others--
Rajendra and Others--
Rajendra and Others--
Pandiyan G--
G Vedavathi--
GC Narayanappa--
Smt. G. Vedavathi--
Dr. KS Ramesh--
Smt. G. Vedavathi--
Smt. Shanti Puthamakula and One--
GC Jagadhish--
GN RAMACHANDRAIAH--
M/s. Pasupati Barter LLP--
GR Savitha--
SATYANARAYANA--
V Chandraiah--
GN Ramachandraiah--
GR Savitha--
Harish GM--
Sanjay GA--
GN RAMACHANDRAIAH--
G R Thimma Reddy and Others--
G R Thimma Reddy and Others--
G R Thimma Reddy and Others--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 970.81 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 800.23 cr-
OthersRs 75.09 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 66.41 cr-
Payment of taxesRs 15.37 cr-
On-site expenditure-Salaries of workersRs 6.59 cr-
On-site expenditure-Consultants FeesRs 6.59 cr-
On-site expenditure-Site OverheadRs 27.32 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 27.32 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBommu Veera Narendranath Reddy
EngineerRamesh B
Chartered AccountantRama Krishna Animireddi

Documents filed617

As listed on the registration, under the names the promoter filed them with; the newest 80 of 617 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/311026/009066 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 177/2-
Mutation, survey 177/2-
Encumbrance Certificate, survey 177/2-
Conversion/Alienation Order, survey 177/2-
Sale/Title/Gift Deed, survey 177/2-
JDA, survey 177/2-
Khatha, survey 177/2-
RTC, survey 177/7-
Mutation, survey 177/7-
Encumbrance Certificate, survey 177/7-
Conversion/Alienation Order, survey 177/7-
Sale/Title/Gift Deed, survey 177/7-
JDA, survey 177/7-
Khatha, survey 177/7-
RTC, survey 177/9-
Mutation, survey 177/9-
Encumbrance Certificate, survey 177/9-
Conversion/Alienation Order, survey 177/9-
Sale/Title/Gift Deed, survey 177/9-
JDA, survey 177/9-
Khatha, survey 177/9-
RTC, survey 186/2-
Mutation, survey 186/2-
Encumbrance Certificate, survey 186/2-
Conversion/Alienation Order, survey 186/2-
Sale/Title/Gift Deed, survey 186/2-
JDA, survey 186/2-
Khatha, survey 186/2-
RTC, survey 168/1A-
Mutation, survey 168/1A-
Encumbrance Certificate, survey 168/1A-
Conversion/Alienation Order, survey 168/1A-
Sale/Title/Gift Deed, survey 168/1A-
JDA, survey 168/1A-
Khatha, survey 168/1A-
RTC, survey 168/1B-
Mutation, survey 168/1B-
Encumbrance Certificate, survey 168/1B-
Conversion/Alienation Order, survey 168/1B-
Sale/Title/Gift Deed, survey 168/1B-
JDA, survey 168/1B-
Khatha, survey 168/1B-
RTC, survey 176/4-
Mutation, survey 176/4-
Encumbrance Certificate, survey 176/4-
Conversion/Alienation Order, survey 176/4-
Sale/Title/Gift Deed, survey 176/4-
JDA, survey 176/4-
Khatha, survey 176/4-
RTC, survey 168/12-
Mutation, survey 168/12-
Encumbrance Certificate, survey 168/12-
Conversion/Alienation Order, survey 168/12-
Sale/Title/Gift Deed, survey 168/12-
JDA, survey 168/12-
Khatha, survey 168/12-
RTC, survey 168/13-
Mutation, survey 168/13-
Encumbrance Certificate, survey 168/13-
Conversion/Alienation Order, survey 168/13-
Sale/Title/Gift Deed, survey 168/13-
JDA, survey 168/13-
Khatha, survey 168/13-
RTC, survey 176/6C-
Mutation, survey 176/6C-
Encumbrance Certificate, survey 176/6C-
Conversion/Alienation Order, survey 176/6C-
Sale/Title/Gift Deed, survey 176/6C-
JDA, survey 176/6C-
Khatha, survey 176/6C-
RTC, survey 177/15-
Mutation, survey 177/15-
Encumbrance Certificate, survey 177/15-
Conversion/Alienation Order, survey 177/15-
Sale/Title/Gift Deed, survey 177/15-
JDA, survey 177/15-
Khatha, survey 177/15-
RTC, survey 173/4-
Mutation, survey 173/4-
Encumbrance Certificate, survey 173/4-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep CANDEUR ICON PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s CANDEUR CONSTRUCTIONS

M/s. Candeur Constructions has 3 registrations on RERA Karnataka, including Candeur Landmark and CANDEUR SIGNATURE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if CANDEUR ICON PHASE I is delayed beyond 1 Aug 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of CANDEUR ICON PHASE I?

The registered promoter entity is M/s CANDEUR CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29AAPFC8451Q1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in CANDEUR ICON PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CANDEUR ICON PHASE I?

The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: Ramesh B; Chartered Accountant: Rama Krishna Animireddi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CANDEUR ICON PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CANDEUR ICON PHASE I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CANDEUR ICON PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.