Registration approved No litigation declared Residential/Group Housing project

C R Serenity

By C R Builders

RG-KA-32237 · RERA PRM/KA/RERA/1251/310/PR/220823/006193 · Last updated on RERA Karnataka portal: 17 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 101 documents Report an error

C R Serenity is a Residential/Group Housing project by C R Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/220823/006193 on 22 Aug 2023. Possession is promised by 15 May 2025.

At a glance

Project

  • NameC R Serenity
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/220823/006193
  • ReraGenie IDRG-KA-32237

Builder

  • NameC R Builders
  • Entity typePartnership Firm
  • GSTIN29AASFC2040G1ZG
  • Authorized SignatoryM Ramesh

Key dates

this monthRegisteredAug 2023PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Aug 2023
  • Promised completion15 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C R Serenity---50050

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 17 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 17 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
M Ramesh--
Chitti Babu G S--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 28.20 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.07 cr-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 4.85 cr-
On-site expenditure-Salaries of workersRs 3.36 cr-
Payment of taxesRs 1.68 cr-
On-site expenditure-Consultants FeesRs 25.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhanumathy G
EngineerSrinivasa Rao Bolimunta
Chartered AccountantN Thyagaraju

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed101

As listed on the registration, under the names the promoter filed them with; the newest 80 of 101 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/220823/006193 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Kharab are AffidavitFile: Kharab Affidavit.pdf17 Aug 2023
BESCOM NOCFile: BESCOM NOC.pdf6 Aug 2023
Building PlanFile: Building Plan.PDF6 Aug 2023
BWSSB NOC with ReciptFile: BWSSB NOC with Recipt.pdf6 Aug 2023
CC DeclarationFile: CC Declaration.pdf6 Aug 2023
Certified Carpet Area StatementFile: Certified Area Statement.pdf6 Aug 2023
CR serenity scheduleFile: CR serenity schedule.pdf6 Aug 2023
Form_6 Engineer CertificateFile: Form_6 Engineer Certificate.pdf6 Aug 2023
GST REGISTRATION CERTIFICATEFile: GST REGISTRATION CERTIFICATE.pdf6 Aug 2023
Guidance Value Report (1)File: Guidance Value Report (1).pdf6 Aug 2023
Single plo layoutFile: Single plo layout.pdf6 Aug 2023
Source of Fund DocumentFile: Source of Fund Document.pdf6 Aug 2023
STP Plan and DesignFile: STP Plan and Design.pdf6 Aug 2023
PARTNERSHIP DEED C R BuildersFile: PARTNERSHIP DEED C R Builders.pdf6 Aug 2023
Form C CR buildersFile: Form C CR builders.pdf6 Aug 2023
year Financial Statement of RameshFile: 3 year Financial Statement of Ramesh.pdf6 Aug 2023
Years financial Statement of Chitti BabuFile: 3 Years financial Statement of Chitti Babu.pdf6 Aug 2023
Sale deed Sy No 324 from Jeevan to CR BuildersFile: Begur sale deed Sy No 324.pdf6 Aug 2023
Title Deed in the Name of JeevanFile: Title Deed.pdf6 Aug 2023
Self declaration CRFile: Self declaration CR.pdf6 Aug 2023
RTC CR BuildersFile: RTC CR Builders.pdf6 Aug 2023
RTC, survey 324-
Mutation, survey 324-
Encumbrance Certificate, survey 324-
Conversion/Alienation Order, survey 324-
Sale/Title/Gift Deed, survey 324-
Khatha, survey 324-
Registration CertificateFile: Form C CR builders.pdf-
Partnership DeedFile: PARTNERSHIP DEED C R Builders.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1.pdf-
Certificate issued by Architect Form 2File: Form_2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Certificate from Chartered Account-
Balance Sheet 2021 - 2022File: CA Certificate.pdf-
Balance Sheet 2020 - 2021File: CA Certificate.pdf-
Balance Sheet 2019 - 2020File: CA Certificate.pdf-
Audited Profit and Loss Statement 2021 - 2022File: CA Certificate.pdf-
Audited Profit and Loss Statement 2020 - 2021File: CA Certificate.pdf-
Audited Profit and Loss Statement 2019 - 2020File: CA Certificate.pdf-
Director's Report 2021 - 2022File: CA Certificate.pdf-
Director's Report 2020 - 2021File: CA Certificate.pdf-
Director's Report 2019 - 2020File: CA Certificate.pdf-
Cash Flow Statement 2021 - 2022File: CA Certificate.pdf-
Cash Flow Statement 2020 - 2021File: CA Certificate.pdf-
Auditor's Report 2021 - 2022File: CA Certificate.pdf-
Auditor's Report 2020 - 2021File: CA Certificate.pdf-
Auditor's Report 2019 - 2020File: CA Certificate.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: CA Certificate.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: CA Certificate.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: CA Certificate.pdf-
Plan Licence Letter-
Fee paid receipt BESCOM-
BWSSB NOC CR BUILDERS-
Building Plan-
Building Plan-
Building Plan-
Building Plan-
Building Plan-
Project Specification-
Building Plan-
Building Plan-
Structure Stability Certificate-
Legal Search Report-
Begur sale deed Sy No 324-
Conversion Order-
AOS-
Proforma Allotment Letter-
Form B-
Section 3(1)-
BESCOM NOC CR Builders-
BWSSB NOC CR BUILDERS-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep C R Serenity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: C R Builders

C R Builders has 1 registration on RERA Karnataka, including C R Serenity. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if C R Serenity is delayed beyond 15 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of C R Serenity?

The registered promoter entity is C R Builders, a partnership firm as per the filing. Its GSTIN 29AASFC2040G1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in C R Serenity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at C R Serenity?

The professionals named in the filing: Architect: Bhanumathy G; Engineer: Srinivasa Rao Bolimunta; Chartered Accountant: N Thyagaraju. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in C R Serenity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About C R Serenity. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save C R Serenity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.