ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / C.B.D.61FOUR

Completed No litigation declared Commercial project

C.B.D.61FOUR

By GREENSCAPE SHAKTI VENUTRES

RG-MH-74629 · RERA P51700015006 · Last updated on MahaRERA portal: 9 Feb 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

C.B.D.61FOUR is a Commercial project by GREENSCAPE SHAKTI VENUTRES in Thane, Maharashtra, registered with MahaRERA as P51700015006 on 22 Jan 2018. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameC.B.D.61FOUR
  • TypeCommercial
  • Location
    • PLOT NO 12
    • SECTOR 15
    • C.B.D. BELAPUR
    • Navi Mumbai (M Corp.)
    • Thane
    • 400614
  • Pincode400614
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015006
  • ReraGenie IDRG-MH-74629

Builder

  • NameGREENSCAPE SHAKTI VENUTRES
  • Entity typePartnership
  • PartnersMAHESH NANJI PATEL, RAMESH NANJI PATEL, SURESH AMBAVI WAVIA

Key dates

this monthRegisteredJan 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Jan 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CBD61FOURNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

CBD61FOUR: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered124

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,906 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4353.0
Proposed, not sanctioned4,353 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCBD BELAPUR

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOYUZ TALIB ARCHITECT PVT LTD
EngineerB L AGRAWAL AND ASSOCIATES
PartnerRole in project
GREENSCAPE SHAKTI VENUTRES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700016552Dec 2022 → Dec 2023

Reason as filed by the promoterPlease note that all the Development work is virtually completed as evident from the latest Form 1/ Form 2/ Form 3 already updated on the Maharera Website. We have already made application for Occupancy Certificate and receipt for the same is attached herewith along with Virtual Completion Certificate from the Architect. Please note that we have no control on the Local Authority for processing of Application of Occupancy certificate and delay in the issuance of the Occupancy Certificate may occur due to several reasons such as a high volume of applications, insufficient staff or resources or a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Oct 2023

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SIGNED.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf20 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf20 Nov 2023
Certificates of CA (Form 3)File: FORM 3_compressed.pdf20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf20 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold unit details.pdf13 Jul 2023
Certificates of CA (Form 3)File: FORM 3 (COMPRESSED).pdf13 Jul 2023
Certificates of CA (Form 3)File: SOLD UNSOLD CERTIFIED BY CA_compressed.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 21-22.pdf14 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 May 2023
Certificates of CA (Form 3)File: FORM 3 (COMPRESSED).pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (01-10-2022).pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf11 Jan 2023
Certificates of CA (Form 3)File: FORM 3_Q1_1_COMPRESSED.pdf11 Jan 2023
Certificates of CA (Form 3)File: FORM 3 _ Q2_2_COMPRESSED.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf21 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf21 Nov 2022
Certificates of CA (Form 3)File: FORM 3.pdf21 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf21 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Q1.pdf8 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Q2.pdf8 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Q3.pdf8 Apr 2022
Certificates of CA (Form 3)File: FORM 3 Q1_compressed.pdf8 Apr 2022
Certificates of CA (Form 3)File: FORM 3 Q2_compressed.pdf8 Apr 2022
Certificates of CA (Form 3)File: FORM 3 Q3_compressed.pdf8 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf13 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf13 Sep 2021
Certificates of CA (Form 3)File: FORM 3_compressed.pdf13 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_compressed.pdf13 Sep 2021
Proforma of Allotment letterFile: Updated Format Agreement for Sale.pdf18 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Q3 Dec 20.pdf15 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 Dec 2020.pdf15 Mar 2021
Certificates of CA (Form 3)File: Form 3 Greenscape.pdf15 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_jun.pdf21 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf21 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 Nov 2020
Certificates of CA (Form 3)File: FORM 3 Q1_.pdf21 Nov 2020
Certificates of CA (Form 3)File: FORM 3 Q2_.pdf21 Nov 2020
Certificates of CA (Form 5)File: FORM 5_.pdf21 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_.pdf21 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf29 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ Engineer Certificate.pdf29 Aug 2020
Certificates of CA (Form 3)File: FORM 3_.pdf29 Aug 2020
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf19 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed.pdf9 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jan 2020
Certificates of CA (Form 3)File: Form 3_Greenscape_0001.pdf9 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_compressed.pdf3 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_compressed.pdf3 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Form 2.pdf3 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Form 2.pdf3 Dec 2019
Certificates of CA (Form 3)File: Form 3_Q1_compressed.pdf3 Dec 2019
Certificates of CA (Form 3)File: Form 3_Q2_compressed.pdf3 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH.pdf14 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH.pdf14 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Q3.pdf14 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH.pdf14 Oct 2019
Certificates of CA (Form 3)File: FORM 3_Q3.pdf14 Oct 2019
Certificates of CA (Form 3)File: FORM 3 Q4.pdf14 Oct 2019
Certificates of CA (Form 5)File: FORM 5 GREENSCAPE.pdf14 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 ARCHITECT'S CERTIFICATE (12,15)_UNTIL 31-DEC_compressed.pdf25 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept18 Belapur.pdf2 Jan 2019
Certificates of CA (Form 3)File: FORM 3_GREENSCAPE_30-9-18_COMPRESSED.pdf2 Jan 2019
OtherFile: ALLOTMENT LETTER.pdf2 Jan 2019
Certificates of CA (Form 5)File: FORM 5.pdf25 Sep 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf7 May 2018
OtherFile: ENGINEER CERTIFICATE.pdf7 May 2018
Proforma of Allotment letterFile: DRAFT AGREEMENT AND ALLOTMENT LETTER.pdf18 Jan 2018
Layout approvalFile: LAYOUT PLAN APPROVAL.pdf16 Jan 2018
Building plan approvalFile: BUILDING PLAN APPROVAL.pdf16 Jan 2018
PAN CardFile: PAN.pdf16 Jan 2018
Copy of the legal title reportFile: LEGAL TITLE REPORT_GREENSCAPE.pdf16 Jan 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep C.B.D.61FOUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near C.B.D. BELAPUR7,600+ in Thane

2 kmC.B.D.61FOURCompleted 12Lapsed / revoked 6Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: GREENSCAPE SHAKTI VENUTRES

GREENSCAPE SHAKTI VENUTRES has 1 registration on MahaRERA, including C.B.D.61FOUR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if C.B.D.61FOUR is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of C.B.D.61FOUR?

The registered promoter entity is GREENSCAPE SHAKTI VENUTRES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in C.B.D.61FOUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for C.B.D.61FOUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at C.B.D.61FOUR?

The professionals named in the filing: Architect: SOYUZ TALIB ARCHITECT PVT LTD; Engineer: B L AGRAWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in C.B.D.61FOUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About C.B.D.61FOUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save C.B.D.61FOUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.