Brigade Twin Towers
By Brigade Infrastructure and Power Private Limited
RG-KA-95270 · RERA PRM/KA/RERA/1251/309/PR/301223/006520 · Last updated on RERA Karnataka portal: 26 Dec 2023
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Brigade Twin Towers is a Commercial project by Brigade Infrastructure and Power Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/301223/006520 on 30 Dec 2023. Possession is promised by 31 Dec 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameBrigade Twin Towers
- TypeCommercial
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/309/PR/301223/006520
- ReraGenie IDRG-KA-95270
Builder
- NameBrigade Infrastructure and Power Private Limited
- Entity typeCompany
- CINU70109KA2007PTC044008
- GSTIN29AADCB5392A1ZT
- Authorized SignatorySuresh B C
- Joint Managing DirectorNirupa Shankar
- DirectorsNirupa Shankar, Amar Mysore, Pradyumna Krishnakumar
- Project HeadSuresh B C
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Dec 2023
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings3 building records
- Documents filed168 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 0 | 17 | 17 |
| 2 | - | - | - | 0 | 17 | 17 |
| 3 | - | - | - | 0 | 2 | 2 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 26 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 26 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership8
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Brigade Infrastructure & Power Pvt Ltd. | - | - |
| Brigade Infrastructure & Power Pvt Ltd. | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
| Brigade Infrastructure & Power Pvt Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 469.10 cr | - |
| Payment of taxes | Rs 85.83 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 71.62 cr | - |
| On-site expenditure-Salaries of workers | Rs 8.42 cr | - |
| On-site expenditure-Consultants Fees | Rs 7.73 cr | - |
| On-site expenditure-Site Overhead | Rs 6.97 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TILAK THOMAS |
| Engineer | RENUKA PRASAD H N |
| Chartered Accountant | R. Srinivasan |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01149/2026 | - | Brigade Infrastructure and Power Private Limited | 24/09/2026 |
Documents filed168
As listed on the registration, under the names the promoter filed them with; the newest 80 of 168 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/301223/006520 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1 CA CertificateFile: Brigade Twin Towers - Form 1.pdf | 26 Dec 2023 |
| RTC for the Survey No 74File: RTC - Sy No 74.pdf | 26 Dec 2023 |
| RTC for the Survey No 77File: RTC - Sy No 77.pdf | 26 Dec 2023 |
| Request Letter and EndorsementFile: Request Letter and Endorsement.pdf | 26 Dec 2023 |
| Endorsement - MutationFile: Endorsement - Mutation Sy No 74-1 to 74-4 & 77-1 to 77-4.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 74/1 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 74/2 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 74/3 with typed copyFile: Conversion Order No 872 - Sy No 74-3 with Typed Copy and Endorsement.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 74/4 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 77/1 with typed copyFile: Conversion Order No 594 - Sy No 77-1, 77-2 with Typed Copy and Endorsement.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 77/2 with typed copyFile: Conversion Order No 594 - Sy No 77-1, 77-2 with Typed Copy and Endorsement.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 77/3 with typed copyFile: Conversion Order No 417 - Sy No 77-3 with Typed Copy.pdf | 26 Dec 2023 |
| Conversion Order for Sy No 77/4 with typed copyFile: Conversion Order No 534 - Sy No 77-4 with Typed Copy.pdf | 26 Dec 2023 |
| Latest Advocate Search ReportFile: Brigade Twin Towers - Latest Search Report.pdf | 26 Dec 2023 |
| Tower 3 - Area StatementFile: Tower 3 Area Statement.pdf | 26 Dec 2023 |
| Copy of Self Attested Engineer CertificateFile: Renuka Prasad - BBMP Regn Certificate.pdf | 26 Dec 2023 |
| Agreement to SellFile: Brigade Twin Towers - Agreement to Sell.pdf | 26 Dec 2023 |
| Profoma Allotment LetterFile: Brigade Twin Towers - Allotment Letter.pdf | 26 Dec 2023 |
| SEIAA NOCFile: Brigade Twin Towers - Environment Clearance with Circular.pdf | 26 Dec 2023 |
| KSPCB NOCFile: Brigade Twin Towers - KSPCB NOC with Circular.pdf | 26 Dec 2023 |
| Reply to QueriesFile: Reply to Queries.pdf | 26 Dec 2023 |
| RTC, survey 74/1 | - |
| Mutation, survey 74/1 | - |
| Encumbrance Certificate, survey 74/1 | - |
| Conversion/Alienation Order, survey 74/1 | - |
| Sale/Title/Gift Deed, survey 74/1 | - |
| JDA, survey 74/1 | - |
| Khatha, survey 74/1 | - |
| RTC, survey 74/2 | - |
| Mutation, survey 74/2 | - |
| Encumbrance Certificate, survey 74/2 | - |
| Conversion/Alienation Order, survey 74/2 | - |
| Sale/Title/Gift Deed, survey 74/2 | - |
| JDA, survey 74/2 | - |
| Khatha, survey 74/2 | - |
| RTC, survey 74/3 | - |
| Mutation, survey 74/3 | - |
| Encumbrance Certificate, survey 74/3 | - |
| Conversion/Alienation Order, survey 74/3 | - |
| Sale/Title/Gift Deed, survey 74/3 | - |
| JDA, survey 74/3 | - |
| Khatha, survey 74/3 | - |
| RTC, survey 74/4 | - |
| Mutation, survey 74/4 | - |
| Encumbrance Certificate, survey 74/4 | - |
| Conversion/Alienation Order, survey 74/4 | - |
| Sale/Title/Gift Deed, survey 74/4 | - |
| JDA, survey 74/4 | - |
| Khatha, survey 74/4 | - |
| RTC, survey 77/1 | - |
| Mutation, survey 77/1 | - |
| Encumbrance Certificate, survey 77/1 | - |
| Conversion/Alienation Order, survey 77/1 | - |
| Sale/Title/Gift Deed, survey 77/1 | - |
| JDA, survey 77/1 | - |
| Khatha, survey 77/1 | - |
| RTC, survey 77/2 | - |
| Mutation, survey 77/2 | - |
| Encumbrance Certificate, survey 77/2 | - |
| Conversion/Alienation Order, survey 77/2 | - |
| Sale/Title/Gift Deed, survey 77/2 | - |
| JDA, survey 77/2 | - |
| Khatha, survey 77/2 | - |
| RTC, survey 77/3 | - |
| Mutation, survey 77/3 | - |
| Encumbrance Certificate, survey 77/3 | - |
| Conversion/Alienation Order, survey 77/3 | - |
| Sale/Title/Gift Deed, survey 77/3 | - |
| JDA, survey 77/3 | - |
| Khatha, survey 77/3 | - |
| RTC, survey 77/4 | - |
| Mutation, survey 77/4 | - |
| Encumbrance Certificate, survey 77/4 | - |
| Conversion/Alienation Order, survey 77/4 | - |
| Sale/Title/Gift Deed, survey 77/4 | - |
| JDA, survey 77/4 | - |
| Khatha, survey 77/4 | - |
| Registration CertificateFile: Certificate of Incorporation1.pdf | - |
| Organization StructureFile: Organogram.xls | - |
| Certificate issued by CA Form 1File: Brigade Twin Towers - Form 1.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Brigade Twin Towers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Brigade Infrastructure and Power Private Limited
Brigade Infrastructure and Power Private Limited has 1 registration on RERA Karnataka, including Brigade Twin Towers. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Brigade Twin Towers is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Brigade Twin Towers?
The registered promoter entity is Brigade Infrastructure and Power Private Limited, a company as per the filing. Its CIN U70109KA2007PTC044008 and GSTIN 29AADCB5392A1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Brigade Twin Towers?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Brigade Twin Towers?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Brigade Twin Towers?
The professionals named in the filing: Architect: TILAK THOMAS; Engineer: RENUKA PRASAD H N; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Brigade Twin Towers?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.