Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 168 documents Report an error

Brigade Twin Towers is a Commercial project by Brigade Infrastructure and Power Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/301223/006520 on 30 Dec 2023. Possession is promised by 31 Dec 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBrigade Twin Towers
  • TypeCommercial
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/301223/006520
  • ReraGenie IDRG-KA-95270

Builder

  • NameBrigade Infrastructure and Power Private Limited
  • Entity typeCompany
  • CINU70109KA2007PTC044008
  • GSTIN29AADCB5392A1ZT
  • Authorized SignatorySuresh B C
  • Joint Managing DirectorNirupa Shankar
  • DirectorsNirupa Shankar, Amar Mysore, Pradyumna Krishnakumar
  • Project HeadSuresh B C

Key dates

this monthRegisteredDec 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Dec 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed168 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---01717
2---01717
3---022

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 26 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners8
LandownerVillageDistrict
Brigade Infrastructure & Power Pvt Ltd.--
Brigade Infrastructure & Power Pvt Ltd.--
Brigade Infrastructure & Power Pvt Ltd--
Brigade Infrastructure & Power Pvt Ltd--
Brigade Infrastructure & Power Pvt Ltd--
Brigade Infrastructure & Power Pvt Ltd--
Brigade Infrastructure & Power Pvt Ltd--
Brigade Infrastructure & Power Pvt Ltd--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 649.66 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 469.10 cr-
Payment of taxesRs 85.83 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 71.62 cr-
On-site expenditure-Salaries of workersRs 8.42 cr-
On-site expenditure-Consultants FeesRs 7.73 cr-
On-site expenditure-Site OverheadRs 6.97 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTILAK THOMAS
EngineerRENUKA PRASAD H N
Chartered AccountantR. Srinivasan

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01149/2026-Brigade Infrastructure and Power Private Limited24/09/2026

Documents filed168

As listed on the registration, under the names the promoter filed them with; the newest 80 of 168 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/301223/006520 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1 CA CertificateFile: Brigade Twin Towers - Form 1.pdf26 Dec 2023
RTC for the Survey No 74File: RTC - Sy No 74.pdf26 Dec 2023
RTC for the Survey No 77File: RTC - Sy No 77.pdf26 Dec 2023
Request Letter and EndorsementFile: Request Letter and Endorsement.pdf26 Dec 2023
Endorsement - MutationFile: Endorsement - Mutation Sy No 74-1 to 74-4 & 77-1 to 77-4.pdf26 Dec 2023
Conversion Order for Sy No 74/1 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf26 Dec 2023
Conversion Order for Sy No 74/2 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf26 Dec 2023
Conversion Order for Sy No 74/3 with typed copyFile: Conversion Order No 872 - Sy No 74-3 with Typed Copy and Endorsement.pdf26 Dec 2023
Conversion Order for Sy No 74/4 with typed copyFile: Conversion Order No 538 - Sy No 74-1, 74-2, 74-4 with Typed Copy.pdf26 Dec 2023
Conversion Order for Sy No 77/1 with typed copyFile: Conversion Order No 594 - Sy No 77-1, 77-2 with Typed Copy and Endorsement.pdf26 Dec 2023
Conversion Order for Sy No 77/2 with typed copyFile: Conversion Order No 594 - Sy No 77-1, 77-2 with Typed Copy and Endorsement.pdf26 Dec 2023
Conversion Order for Sy No 77/3 with typed copyFile: Conversion Order No 417 - Sy No 77-3 with Typed Copy.pdf26 Dec 2023
Conversion Order for Sy No 77/4 with typed copyFile: Conversion Order No 534 - Sy No 77-4 with Typed Copy.pdf26 Dec 2023
Latest Advocate Search ReportFile: Brigade Twin Towers - Latest Search Report.pdf26 Dec 2023
Tower 3 - Area StatementFile: Tower 3 Area Statement.pdf26 Dec 2023
Copy of Self Attested Engineer CertificateFile: Renuka Prasad - BBMP Regn Certificate.pdf26 Dec 2023
Agreement to SellFile: Brigade Twin Towers - Agreement to Sell.pdf26 Dec 2023
Profoma Allotment LetterFile: Brigade Twin Towers - Allotment Letter.pdf26 Dec 2023
SEIAA NOCFile: Brigade Twin Towers - Environment Clearance with Circular.pdf26 Dec 2023
KSPCB NOCFile: Brigade Twin Towers - KSPCB NOC with Circular.pdf26 Dec 2023
Reply to QueriesFile: Reply to Queries.pdf26 Dec 2023
RTC, survey 74/1-
Mutation, survey 74/1-
Encumbrance Certificate, survey 74/1-
Conversion/Alienation Order, survey 74/1-
Sale/Title/Gift Deed, survey 74/1-
JDA, survey 74/1-
Khatha, survey 74/1-
RTC, survey 74/2-
Mutation, survey 74/2-
Encumbrance Certificate, survey 74/2-
Conversion/Alienation Order, survey 74/2-
Sale/Title/Gift Deed, survey 74/2-
JDA, survey 74/2-
Khatha, survey 74/2-
RTC, survey 74/3-
Mutation, survey 74/3-
Encumbrance Certificate, survey 74/3-
Conversion/Alienation Order, survey 74/3-
Sale/Title/Gift Deed, survey 74/3-
JDA, survey 74/3-
Khatha, survey 74/3-
RTC, survey 74/4-
Mutation, survey 74/4-
Encumbrance Certificate, survey 74/4-
Conversion/Alienation Order, survey 74/4-
Sale/Title/Gift Deed, survey 74/4-
JDA, survey 74/4-
Khatha, survey 74/4-
RTC, survey 77/1-
Mutation, survey 77/1-
Encumbrance Certificate, survey 77/1-
Conversion/Alienation Order, survey 77/1-
Sale/Title/Gift Deed, survey 77/1-
JDA, survey 77/1-
Khatha, survey 77/1-
RTC, survey 77/2-
Mutation, survey 77/2-
Encumbrance Certificate, survey 77/2-
Conversion/Alienation Order, survey 77/2-
Sale/Title/Gift Deed, survey 77/2-
JDA, survey 77/2-
Khatha, survey 77/2-
RTC, survey 77/3-
Mutation, survey 77/3-
Encumbrance Certificate, survey 77/3-
Conversion/Alienation Order, survey 77/3-
Sale/Title/Gift Deed, survey 77/3-
JDA, survey 77/3-
Khatha, survey 77/3-
RTC, survey 77/4-
Mutation, survey 77/4-
Encumbrance Certificate, survey 77/4-
Conversion/Alienation Order, survey 77/4-
Sale/Title/Gift Deed, survey 77/4-
JDA, survey 77/4-
Khatha, survey 77/4-
Registration CertificateFile: Certificate of Incorporation1.pdf-
Organization StructureFile: Organogram.xls-
Certificate issued by CA Form 1File: Brigade Twin Towers - Form 1.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Brigade Twin Towers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Brigade Infrastructure and Power Private Limited

Brigade Infrastructure and Power Private Limited has 1 registration on RERA Karnataka, including Brigade Twin Towers. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Brigade Twin Towers is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Brigade Twin Towers?

The registered promoter entity is Brigade Infrastructure and Power Private Limited, a company as per the filing. Its CIN U70109KA2007PTC044008 and GSTIN 29AADCB5392A1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Brigade Twin Towers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Brigade Twin Towers?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Brigade Twin Towers?

The professionals named in the filing: Architect: TILAK THOMAS; Engineer: RENUKA PRASAD H N; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brigade Twin Towers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brigade Twin Towers. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brigade Twin Towers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.