Red flags

  • 2 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
17 of 18Construction stages donefurthest along: Electrification, 99%
0 of 212Units unsoldnot recorded sold or booked
2Complaints at RERA Karnatakaon this registration
Jump to the 106 documents Report an error

Brigade Laguna is a Residential/Group Housing project by Brigade Enterprises Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/170322/004775 on 17 Mar 2022. Possession is promised by 31 Dec 2025. 212 of the 212 units on this registration are recorded sold or booked, and 17 of 18 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameBrigade Laguna
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560050
  • Pincode560050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/170322/004775
  • ReraGenie IDRG-KA-48267

Builder

  • NameBrigade Enterprises Ltd
  • Entity typeCompany
  • CINL85110KA1995PLC019126
  • GSTIN29AAACB7459F1ZI
  • Authorized SignatoryViswa Prathap Desu
  • Chief Executive OfficerRajendra Joshi
  • DirectorsM. R. Jaishankar, Bijou Kurien, Aroon Raman, Lakshmi Venkatachalam, Pradeep Kumar Panja, Venkatesh Panchapagesan, Amar Mysore, Pavitra Shankar, Nirupa Shankar, Roshin Mathew
  • Project HeadRaghavendra S
  • Other registrations45 more →
  • No longer live1 withdrawn or revoked
  • Declared earlier projects67 →

Key dates

this monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed106 files

Current status

100%212 of 212 units booked
0.0%Of the estimated cost spent so far

Figures as on 14 Jan 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---43043
Tower B---35035
Tower C---75075
Tower D---59059

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 18 construction stages are filed complete. The stage furthest along is Electrification, at 99%.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing99%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities40

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes98%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes100%
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes100%
Street LightingYes100%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes100%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesYes100%
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes100%
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,229 sq m
Named landowners3
LandownerVillageDistrict
M/s ENTERPRISE INFRASTRUCTURES--
M/s ENTERPRISE INFRASTRUCTURES--
M/s ENTERPRISE INFRASTRUCTURES--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 110.00 cr
Spent of the estimate0.0%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 101.00 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 5.10 cr-
On-site expenditure-Site OverheadRs 3.63 cr-
On-site expenditure-Salaries of workersRs 15.73 lakh-
On-site expenditure-Consultants FeesRs 6.31 lakh-
Payment of taxesRs 4.21 lakh-
Payment of PremiumsRs 27,313-
Payment of cessRs 24,066-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNaresh Narasimhan
EngineerVijay Kumar
Chartered AccountantR. Srinivasan

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/220719/0009772-Brigade Enterprises Ltd19/07/2022
CMP/220725/0009796-Brigade Enterprises Ltd25/07/2022

Documents filed106

As listed on the registration, under the names the promoter filed them with; the newest 80 of 106 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/170322/004775 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brigade Laguna - Form 4 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Brigade Laguna - Form 5 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brigade Laguna - Form 6 - Q3.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
Bank Account opening FormFile: Brigade Laguna - Bank Account Opening Form.pdf8 Mar 2022
Cancelled chequeFile: cancelled cheque.pdf8 Mar 2022
Bank Account Opening FormFile: Brigade Laguna - Bank Account Opening Form.pdf17 Feb 2022
Note on Single Layout PlanFile: Note on Development Plan or Single Layout Plan.pdf17 Feb 2022
Site PlanFile: Site Plan1.pdf17 Feb 2022
Lower Basement PlanFile: Lower Basement Floor Plan1.pdf17 Feb 2022
Upper Basement PlanFile: Upper Basement Floor Plan1.pdf17 Feb 2022
Ground Floor PlanFile: Ground Floor Plan1.pdf17 Feb 2022
1st Floor PlanFile: First Floor Plan1.pdf17 Feb 2022
2nd Floor PlanFile: Second Floor Plan1.pdf17 Feb 2022
Typical Floor PlanFile: Typical Floor Plan 3rd to 8th1.pdf17 Feb 2022
9th Floor PlanFile: 9th Floor Plan1.pdf17 Feb 2022
Typical Floor PlanFile: Typical Floor Plan 10th to 14th1.pdf17 Feb 2022
Section PlanFile: Section1.pdf17 Feb 2022
Elevation PlanFile: Elevation1.pdf17 Feb 2022
Terrace Floor PlanFile: Terrace Floor PLan1.pdf17 Feb 2022
KSPCB NOC Attested CopyFile: KSPCB.pdf17 Feb 2022
SEIAA NOC Attested CopyFile: SEIAA.pdf17 Feb 2022
Agreement to SellFile: Revised Agreement to Sell.pdf17 Feb 2022
Reply to queries raised by RERAFile: Brigade Laguna - List of Queries raised by RERA and Brigade.pdf17 Feb 2022
RTC, survey 59/1-
Mutation, survey 59/1-
Encumbrance Certificate, survey 59/1-
Conversion/Alienation Order, survey 59/1-
Sale/Title/Gift Deed, survey 59/1-
JDA, survey 59/1-
Khatha, survey 59/1-
RTC, survey 59/2-
Mutation, survey 59/2-
Encumbrance Certificate, survey 59/2-
Conversion/Alienation Order, survey 59/2-
Sale/Title/Gift Deed, survey 59/2-
JDA, survey 59/2-
Khatha, survey 59/2-
RTC, survey 60/3-
Mutation, survey 60/3-
Encumbrance Certificate, survey 60/3-
Conversion/Alienation Order, survey 60/3-
Sale/Title/Gift Deed, survey 60/3-
JDA, survey 60/3-
Khatha, survey 60/3-
Registration CertificateFile: Certificate of Incorporation - BEL copy.pdf-
Organization StructureFile: Organogram.xls-
Certificate issued by CA Form 1File: Brigade Laguna - Form 1.pdf-
Certificate issued by Architect Form 2File: Brigade Laguna - Form 2.pdf-
Certificate issued by Engineer Form 3File: Brigade Laguna - Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Brigade Laguna - Affidavit for Litigation.pdf-
Certificate from Chartered AccountFile: Brigade Laguna - Approval Cost.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet - 2020-21 with CA UDIN.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet - 2019-20.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet - 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profti and Loss - 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profti and Loss - 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profti and Loss - 2018-19.pdf-
Director's Report 2020 - 2021File: Board Report - 2020-21.pdf-
Director's Report 2019 - 2020File: Board Report - 2019-20.pdf-
Director's Report 2018 - 2019File: Board Report - 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow Statement - 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: Cash Flow Statement - 2019-20.pdf-
Auditor's Report 2020 - 2021File: Auditors Report - 2020-21.pdf-
Auditor's Report 2019 - 2020File: Auditors Report - 2019-20.pdf-
Auditor's Report 2018 - 2019File: Auditors Report - 2018-19.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITRV - 2019-20.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITRV - 2018-19.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITRV - 2017-18.pdf-
Brigade Laguna - Plan Sanction Ltr-
Brigade Laguna - BESCOM NOC-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Brigade BricklaneThirumenahalli Village, Yelahanka Hobli, Bangalore North Taluk,OngoingSep 2022Not delivered

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Brigade Laguna on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBrigade LagunaOther 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: Brigade Enterprises Ltd

Brigade Enterprises Ltd has 46 registrations on RERA Karnataka, including Brigade Oasis - Phase 1 and Brigade Atmosphere- Phase 1. Its filings declare 67 earlier projects, 41 of them declared completed. Litigation is declared on 10 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Brigade Laguna is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Brigade Laguna?

The registered promoter entity is Brigade Enterprises Ltd, a company as per the filing. Its CIN L85110KA1995PLC019126 and GSTIN 29AAACB7459F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Brigade Laguna?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Brigade Laguna?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Brigade Laguna?

The professionals named in the filing: Architect: Naresh Narasimhan; Engineer: Vijay Kumar; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brigade Laguna?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brigade Laguna. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brigade Laguna to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.