Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2023Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 57 documents Report an error

BREN NORTHERN LIGHTS is a Residential/Group Housing project by BREN CORPORATION PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190207/002365 on 7 Feb 2019. Possession is promised by 30 Mar 2023. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBREN NORTHERN LIGHTS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/190207/002365
  • ReraGenie IDRG-KA-64408

Builder

  • NameBREN CORPORATION PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2012PTC064294
  • Authorized SignatoryJ BOOPESH REDDY
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2019First promiseJun 2022Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 Feb 2019
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 30 Jun 2022)
  • Buildings9 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---79079
Tower B---80080
Tower C---79079
Tower D---80080
Tower E---80080
Tower F---79079
Tower G---80080
Tower H---80080
Tower I---79079

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,756 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 157.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT. LTD
EngineerADHASHILLA STRUCTURAL CONSULTANTS

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2022 → Mar 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00592/2025-BREN CORPORATION PRIVATE LIMITED04/04/2025

Documents filed57

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190207/002365 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Bren Corporation Incorporation certificate.pdf-
51312-
51312-
UP-
UP-
Sale Deed-
51312-
51312-
UP-
UP-
Project specifications-
E C-
Affidavit-
Khatha Cerificate & Khatha Extract-
JDA -
Fire Noc-compressed-compressed-
Airport NOC-
BESCOM NOC-
BWSSB NOC-
KSPCB NOC CFE-
SEIAA NOC-
BSNL NOC-
51312-
51312-
Conversion Order-
Balance Sheet 2017 - 2018File: Bren Corp Pvt Ltd balance sheet.pdf-
Balance Sheet 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Balance Sheet 2015 - 2016File: BREN Corp Pvt Ltd IT Returns 2016 - 2017.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Bren Corp Pvt Ltd PL.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: BREN Corp Pvt Ltd IT Returns 2016 - 2017.pdf-
Director's Report 2017 - 2018File: Board Report 2018-19.pdf-
Director's Report 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Director's Report 2015 - 2016File: BREN Corp Pvt Ltd IT Returns 2016 - 2017.pdf-
Cash Flow Statement 2017 - 2018File: Bren Corp Pvt Ltd balance sheet.pdf-
Cash Flow Statement 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Auditor's Report 2017 - 2018File: Bren pvt ltd Audit report.pdf-
Auditor's Report 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Auditor's Report 2015 - 2016File: BREN Corp Pvt Ltd IT Returns 2016 - 2017.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Bren_Corp_Pvt_Ltd_ITR-V_2018-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Bren Corporation Pvt lTd IT Returns - A Y 2017 - 18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: BREN Corp Pvt Ltd IT Returns 2016 - 2017.pdf-
Form B-
Prospectus/BrochureFile: Brochure.pdf-
Advertisement Copy 1File: Advertisement Copy.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_190207_002365.xlsx-
Loan raised documentFile: BNL AFL Sanction 57-1Cr.pdf-
Stability CertificateFile: Stability Certificate BNL Residential Apartment.pdf-
NOC issued by the Fire Force department after completion of workFile: Fire CC.pdf-
Occupancy CertificateFile: OC- BREN Northernlights.pdf-
Consent for operation issued by KSPCBFile: KSPCB - CFO.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BNL power sanction.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Northern lights-completion_Form5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Bren Northern Lights_ Completion Form 4CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Scan Affidavit.pdf-
Engineer's Certificate for completionFile: Bren Northern Lights Completion_Form6_Projects.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BREN NORTHERN LIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBREN NORTHERN LIGHTSOther 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: BREN CORPORATION PRIVATE LIMITED

BREN CORPORATION PRIVATE LIMITED has 7 registrations on RERA Karnataka, including BREN PARK CITY and BREN NORTHERN LIGHTS. Its filings declare 5 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BREN NORTHERN LIGHTS is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BREN NORTHERN LIGHTS?

The registered promoter entity is BREN CORPORATION PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2012PTC064294 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BREN NORTHERN LIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BREN NORTHERN LIGHTS?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at BREN NORTHERN LIGHTS?

The professionals named in the filing: Architect: ASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT. LTD; Engineer: ADHASHILLA STRUCTURAL CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BREN NORTHERN LIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BREN NORTHERN LIGHTS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BREN NORTHERN LIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.