ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / BREN IMPERIA GRANDE

Registration approved No litigation declared Residential/Group Housing project

BREN IMPERIA GRANDE

By BREN CORPORATION

RG-KA-62825 · RERA PRM/KA/RERA/1251/446/PR/030524/006842 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2027Possession promisedno revision filed
4 of 18Construction stages donefurthest along: Retaining wall (All types), 50%
271 of 327Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 197 documents Report an error

BREN IMPERIA GRANDE is a Residential/Group Housing project by BREN CORPORATION in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030524/006842 on 3 May 2024. Possession is promised by 31 Oct 2027. 56 of the 327 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.

At a glance

Project

  • NameBREN IMPERIA GRANDE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560035
  • Pincode560035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/030524/006842
  • ReraGenie IDRG-KA-62825

Builder

  • NameBREN CORPORATION
  • Entity typeProprietorship
  • GSTIN29AGAPB1359F1ZS
  • Authorized SignatoryAmit P Vernekar
  • Other registrations4 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 May 2024
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed197 files

Current status

17%56 of 327 units booked
3.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING 1---79079
WING 2---1450145
WING 3---1030103

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 50%.

Building: 25% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)50%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes30%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area48,544 sq m
Named landowners8
LandownerVillageDistrict
Sunderam Shetty--
Rahul Narayana Shetty--
J Boopesh Reddy--
Smt. Neelamma & Sri KN Venkatesha Reddy--
Sunderam Shetty--
Sunderam Shetty--
Sunderam Shetty--
Sunderam Shetty--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 246.93 cr
Cost incurredRs 9.43 cr
Spent of the estimate3.82%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 223.52 crRs 8.97 cr
On-site expenditure-Salaries of workersRs 16.26 crRs 44.82 lakh
On-site expenditure-Consultants FeesRs 7.15 crRs 1.10 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGayathri & Namith Architects
EngineerSRI N N NAGENDRA KUMAR
Chartered AccountantAmit Someshwar Padaki

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed197

As listed on the registration, under the names the promoter filed them with; the newest 80 of 197 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030524/006842 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Imperia Grande.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2026 - 27 Q2 SEP'2026) BREN IMPERIA GRANDE.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (2026 - 27 Q2) - BREN IMPERIA GRANDE.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Cirtificate Bren Imperia Grande QTR1 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect _2026 - 27 Q1_ BREN IMPERIA GRANDE.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: BREN IMPERIA GRANDE.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Cirtificate Bren Imperia Grande QTR 2025-26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (2025 - 21 Q4) BREN IMPERIA GRANDE.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: IMPERIA GRANDE SCAN.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Qtr-3 FY-2025-26 Bren Imperia Grande_0001_0001.pdf21 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 1 Form-5 Architect (2025 - 21 Q3) BREN IMPERIA GRANDE.pdf21 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineers.pdf21 Feb 2026
Q3 2025-26 Water supply and sewage board21 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)21 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)21 Feb 2026
Q3 2025-26 KPTCL- BESCOM21 Feb 2026
Q3 2025-26 Fire and Safety21 Feb 2026
Q3 2025-26 Airport Authority of India21 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department21 Feb 2026
Bank account name should be as per bank account directionFile: 1Bren Imperia Grande_Bank Account Letter.pdf28 Apr 2024
Current year RTC for SY NO 32File: 1 RTC Sy No 32 - 2023-24.pdf28 Apr 2024
Current year RTC for SY NO 33-1File: 1 RTC Sy No 33-1 - 2023-24.pdf28 Apr 2024
Current year RTC for SY NO 33-2File: 1 RTC Sy No 33-2 - 2023-24.pdf28 Apr 2024
Current year RTC for SY NO 33-3File: 1 RTC Sy No 33-3 - 2023-24.pdf28 Apr 2024
Current year RTC for SY NO 35File: 1 RTC Sy No 35 - 2023-24.pdf28 Apr 2024
Current year RTC for SY NO 46File: 1 RTC Sy No 46 - 2023-24.pdf28 Apr 2024
Title deed in favour of land owner of Sy no.32 measuring 1-03 A-GFile: 2 Sy No 32 Exchange Deed Doc No 4065-2007-08 and Sale deed Doc 3747 2009-10 Bren Imperia.p28 Apr 2024
Conversion order for the full extent for the land in Sy no.35/1File: 3 Conversion Order Sy No 35-1 and 35-2 Bren Imperia.pdf28 Apr 2024
Conversion order for Sy no.46/3File: 3 Conversion Orders Sy No 46 Bren Imperia.pdf28 Apr 2024
JDA between land owner and promoter for Sy no.46/3File: 4 Bren Imperia JDA Sunderam Shetty.pdf28 Apr 2024
Sale deed in favour of land owner Sy no.33/2File: 4 Sy No 33-2 Sale Deed dtd 23 05 2012 - 731.pdf28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 32File: 5d Sale deed and Exchange Deed Sy No 32.pdf28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 33-1File: 5a Sale deed Sy No 33-1 4 Acres 23 Guntas 15 02 2012 No 2401 in favour of Rahul Narayan Sh28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 33-2File: 5b Sale deed Sy No 33-2 dtd 23 05 2012 - 731.pdf28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 33-3File: 5c Partition Deed Sy No 33-3 (old 33-2) dtd 07 11 2002 # 9926.pdf28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 35File: 5e Sale Deed Sy No 35 Doc No 887-2012-13 Bren Imperia.pdf28 Apr 2024
Title / Sale deed in favour of land owner for Sy no 46File: 5f Confirmation Deed Sy No 46 Doc No 2461-2011-12 Bren Imperia.pdf28 Apr 2024
Clarification on KhathaFile: 6 Khatha Clarification.pdf28 Apr 2024
Hissa phody documents and connected MR copy extract - Sy No. 33-1File: 7 Sy No 33-1 Hissa Tippani and MR No16-93-94.pdf28 Apr 2024
Hissa Phody Documents - Sy No 35File: 7 Sy No 35 Hissa Phody Doc.pdf28 Apr 2024
Hissa Phody Documents - Sy No 46File: 7 Sy No 46 Hissa Phody Doc.pdf28 Apr 2024
ADLR Survey SketchFile: 7 ADLR Survey Sketch.pdf28 Apr 2024
Notarised Joint Affidavit cum declarationFile: 8 Notarised Joint Affidavit cum declaration.pdf28 Apr 2024
JDA between land owner and promoter for Sy no.35/1, 35/2, 46/2File: 9 Bren Imperia JDA Sunderam Shetty.pdf28 Apr 2024
Tippani Karda Akarband Sy No 32 35 46 Bren ImperiaFile: Tippani Karda Akarband Sy No 32 35 46 Bren Imperia.pdf28 Apr 2024
Clarification on Area details the project details page not matching with the Approved PlanFile: 1 Area Clarification.pdf28 Apr 2024
Upload certified carpet area calculationFile: 2 Certified Carpet Area Calculation with annexures.pdf28 Apr 2024
Upload demarcation CDP map showing the proposed site.File: 3 CDP Imperia Grande.pdf28 Apr 2024
Upload demarcation village map showing the proposed siteFile: 4 Kasavanahalli Village MAP & ADLR Sketch.pdf28 Apr 2024
Upload commencement certificate.File: 5 Clarification on Commencement Certificate.pdf28 Apr 2024
Area/no of units of Upload KSPCB CFE. is not matching with sanction planFile: 6 KSPCB Affidavit and supporting documents.pdf28 Apr 2024
Area/no of units of Upload SEIAA is not matching with sanction planFile: 7 SIEAA Clarification.pdf28 Apr 2024
Upload all sanctioned drawings floor plan - Part 1File: 8 Floor Plans part 1.pdf28 Apr 2024
Upload all sanctioned drawings floor plan - Part 2File: 8 Floor Plans part 2.pdf28 Apr 2024
Upload ZR copy for nala buffer.File: 9 Zonal Regulation 2007.pdf28 Apr 2024
Upload Architects certificate with valid COA numberFile: 10 BREN IMPERIA GRANDE Form 2 Architect with COA number.pdf28 Apr 2024
Structural Engineer detailsFile: 1 Structural Engineer details.pdf28 Apr 2024
BESCOM NOC along with the copy of fee receipt paid towards NOC.File: 2 Bescom NOC and Payment Receipt.pdf28 Apr 2024
Upload the brief estimated cost of construction certified by the registered Civil Engineer.File: 3 Estimated Cost of Construction.pdf28 Apr 2024

How this compares with Bengaluru Urban

17%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BREN IMPERIA GRANDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBREN IMPERIA GRANDEOther 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: BREN CORPORATION

BREN CORPORATION has 5 registrations on RERA Karnataka, including BREN IMPERIA GRANDE and BREN EDGEWATERS. Its filings declare 7 earlier projects, 7 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BREN IMPERIA GRANDE is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BREN IMPERIA GRANDE?

The registered promoter entity is BREN CORPORATION, a proprietorship as per the filing. Its GSTIN 29AGAPB1359F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BREN IMPERIA GRANDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BREN IMPERIA GRANDE?

The professionals named in the filing: Architect: Gayathri & Namith Architects; Engineer: SRI N N NAGENDRA KUMAR; Chartered Accountant: Amit Someshwar Padaki. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BREN IMPERIA GRANDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BREN IMPERIA GRANDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BREN IMPERIA GRANDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.