Home / Browse projects / Bengaluru Urban, Karnataka / BODHI
BODHI
By M/s Cardinal Energy and Infrastructure Private Limited.
RG-KA-21875 · RERA PRM/KA/RERA/1251/310/PR/170126/008409 · Last updated on RERA Karnataka portal: 9 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
BODHI is a Residential/Group Housing project by M/s Cardinal Energy and Infrastructure Private Limited. in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170126/008409 on 17 Jan 2026. Possession is promised by 31 Mar 2028.
At a glance
Project
- NameBODHI
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/170126/008409
- ReraGenie IDRG-KA-21875
Builder
- NameM/s Cardinal Energy and Infrastructure Private Limited.
- Entity typeCompany
- CINU40102MH2008PTC184568
- GSTIN29AADCC7243H1ZK
- Authorized SignatoryManoj Kumar NB
- DirectorsParesh Vasantlal Merchant, Paresh Vasantlal Merchant, Deepak Krishna Mane
- Project HeadPrashanth N B Nair
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Jan 2026
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed97 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-1 | - | - | - | 24 | 0 | 24 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | Yes | - |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Cardinal Energy and Infrastructure Private Limited. | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 66.09 cr | - |
| Interest on Borrowings | Rs 42.00 cr | - |
| On-site expenditure-Site Overhead | Rs 2.49 cr | - |
| On-site expenditure-Salaries of workers | Rs 2.46 cr | - |
| Administrative Costs | Rs 1.80 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.65 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Indrajith Sharad Kembhavi |
| Engineer | Arun Nadig |
| Chartered Accountant | Sai Rakshith M S |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed97
As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170126/008409 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Modified Approved Building planFile: Modified Approved Building plan.pdf | 9 Jul 2026 |
| Modified Approved Building lisenceFile: Modified Approved Building lisence.pdf | 9 Jul 2026 |
| CEIPL Sale Deed current land ownerFile: CEIPL Sale Deed current land owner.pdf | 14 Jan 2026 |
| CEIPL Non Litigation AffidavitFile: CEIPL Non Litigation Affidavit.pdf | 14 Jan 2026 |
| CEIPL EC till 30-12-2025File: CEIPL EC till 30-12-2025.pdf | 14 Jan 2026 |
| CEIPL PC DeclarationsFile: CEIPL PC Declarations.pdf | 14 Jan 2026 |
| CEIPL CDP - Master Plan demarkedFile: CEIPL CDP - Master Plan demarked.pdf | 14 Jan 2026 |
| CEIPL KSPCB and STP DeclarationFile: CEIPL KSPCB and STP Declaration.pdf | 14 Jan 2026 |
| Engineer Lisence copyFile: Engineer Lisence copy.pdf | 14 Jan 2026 |
| CEIPL Stability CertificateFile: CEIPL Stability Certificate.pdf | 14 Jan 2026 |
| CEIPL AGREEMENT OF SALEFile: CEIPL AGREEMENT OF SALE.pdf | 14 Jan 2026 |
| CEIPL ALLOTMENT LETTERFile: CEIPL ALLOTMENT LETTER.pdf | 14 Jan 2026 |
| CEIPL Brief EstimateFile: Estimate - Bodhi - Cardinal Energy.pdf | 14 Jan 2026 |
| CEIPL Form 1- CA certificateFile: CEIPL Form 1- CA certificate.pdf | 14 Jan 2026 |
| CEIPL Form 6 - Engineer CertificateFile: CEIPL Form 6 - Engineer Certificate.pdf | 14 Jan 2026 |
| Query Reply - BodhiFile: Query Reply - Bodhi.pdf | 14 Jan 2026 |
| Registration CertificateFile: CEIPL Certificate of incorporation.pdf | - |
| Memorandum of AssociationFile: CEIPL MOA.pdf | - |
| Article of AssociationFile: CEIPL AOA.pdf | - |
| GST CertificateFile: CEIPL GST certificate.pdf | - |
| Organization StructureFile: CEIPL Organization Chart.pdf | - |
| Certificate issued by CA Form 1File: Form 1 and Form 4 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 5 Architect Certificates.pdf | - |
| Certificate issued by Engineer Form 3File: Form 6 Engineer Certificates.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: CEIPL Non Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1 and Form 4 CA Certificate.pdf | - |
| Balance Sheet 2024 - 2025File: CEIPL BS with schedule 2024.pdf | - |
| Balance Sheet 2023 - 2024File: CEIPL BS with schedule 2023.pdf | - |
| Balance Sheet 2022 - 2023File: CEIPL BS with schedule 2022.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: CEIPL PL with schedule 2024.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: CEIPL PL with schedule 2023.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: CEIPL PL with schedule 2022.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: CEIPL ITR 2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: CEIPL ITR 2023-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: CEIPL ITR 2022-23.pdf | - |
| Director's Report 2024 - 2025File: CEIPL Directors Report 2024.pdf | - |
| Director's Report 2023 - 2024File: CEIPL Directors Report 2023.pdf | - |
| Director's Report 2022 - 2023File: CEIPL Directors Report 2022.pdf | - |
| Cash Flow Statement 2024 - 2025File: CEIPL Cashflow Statement 2024.pdf | - |
| Cash Flow Statement 2023 - 2024File: CEIPL Cashflow Statement 2023.pdf | - |
| Auditor's Report 2024 - 2025File: CEIPL Auditors report 2024.pdf | - |
| Auditor's Report 2023 - 2024File: CEIPL Auditors Report 2023.pdf | - |
| Auditor's Report 2022 - 2023File: CEIPL Auditors Report 2022.pdf | - |
| CEIPL BODHI BBMP License | - |
| CEIPL Bodhi Approved Site Plan | - |
| CEIPL Bodhi Approved Site Plan | - |
| CEIPL Stability Cetificate | - |
| CEIPL Project Specification | - |
| CEIPL Form B Declaration | - |
| CEIPL Sec 3 Violation Affidavit | - |
| CEIPL Legal Opinion | - |
| CEIPL BESCOM NOC With fees recipt | - |
| CEIPL BWSSB NOC with fees recipt | - |
| Unnamed document | - |
| CEIPL Fire NOC Bodhi by Cardinal | - |
| CEIPL AAI NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| CEIPL No Mortage Affidavit | - |
| CEIPL HAL NOC | - |
| CEIPL CDP Plan demarked | - |
| CEIPL Village Map demarked | - |
| CEIPL Title Deeds - Bodhi | - |
| CEIPL Singal plot layot | - |
| CEIPL Special Notice BBMP | - |
| CEIPL Source of Water | - |
| CEIPL Land Cost declarations | - |
| Already registered project ongoing detailsFile: Quarterly Update Details.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Modified approved plan.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: Modified approved plan.pdf | - |
| Chartered Accountant CertificateFile: Form 4 - CA certificate.pdf | - |
| Notarized AffidavitFile: Affidavit for Modification.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep BODHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/s Cardinal Energy and Infrastructure Private Limited.
M/s Cardinal Energy and Infrastructure Private Limited. has 1 registration on RERA Karnataka, including BODHI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if BODHI is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of BODHI?
The registered promoter entity is M/s Cardinal Energy and Infrastructure Private Limited., a company as per the filing. Its CIN U40102MH2008PTC184568 and GSTIN 29AADCC7243H1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in BODHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at BODHI?
The professionals named in the filing: Architect: Indrajith Sharad Kembhavi; Engineer: Arun Nadig; Chartered Accountant: Sai Rakshith M S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BODHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.