ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / BLUEVALLEY ZEN

Registration approved Residential/Group Housing project

BLUEVALLEY ZEN

By M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED,

RG-KA-06640 · RERA PRM/KA/RERA/1251/309/PR/180420/001542

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2019Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 38 documents Report an error

BLUEVALLEY ZEN is a Residential/Group Housing project by M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED, in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180420/001542 on 20 Apr 2018. Possession is promised by 10 May 2019.

At a glance

Project

  • NameBLUEVALLEY ZEN
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/180420/001542
  • ReraGenie IDRG-KA-06640

Builder

  • NameM/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED,
  • Entity typeCompany
  • CINU45200KA2008PTC046468
  • Authorized SignatorySri.K.SURYANARAYANA RAJU,

Key dates

this monthRegisteredApr 2018PromisedMay 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Apr 2018
  • Promised completion10 May 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Blue Valley Zen---10010

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Ground Clearance-
Earth Excavation-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities43

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Water Tanks, Sumps And Other Electrical EquipmentYes-
FansYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area910 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180420/001542 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation Certicate.jpg-
REduced-
REduced-
deed-
REduced-
REduced-
Smilee views allotment certificate-
SV brouchre-
ec-
amalgmation-
JDA-zen-
JDA-zen-
Unnamed document-
sv plan-
sv plan-
om-
ZEN 4-
Balance Sheet 2015 - 2016File: 3CA FY 2014-15 ay 2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet Fy 2013-14 Ay-2014-15.pdf-
Balance Sheet 2013 - 2014File: Bs auditor Direct report Fy 2012-13 Ay 2013-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Auditor Report Fy 2014-15 Ay 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Balance Sheet Fy 2014-15 AY 2015-16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Balance Sheet Fy 2013-14 Ay-2014-15.pdf-
Director's Report 2015 - 2016File: Auditor Report Fy 2014-15 Ay 2015-16.pdf-
Director's Report 2014 - 2015File: Auditor Report Fy 2013-14 Ay 2014-15.pdf-
Director's Report 2013 - 2014File: Director Report 13-14.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement NA.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow Statement NA.pdf-
Auditor's Report 2015 - 2016File: Auditor Report Fy 2014-15 Ay 2015-16.pdf-
Auditor's Report 2014 - 2015File: Auditor Report Fy 2013-14 Ay 2014-15.pdf-
Auditor's Report 2013 - 2014File: Auditor Report 2013-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR AY 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR AY 2014-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR AY 2014-15.pdf-
affidavit cum declaaration-
Prospectus/BrochureFile: SV brouchre_1506511779446.pdf-
Advertisement Copy 1File: zen(ad).jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_180420_001542.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BLUEVALLEY ZEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED,

M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED, has 1 registration on RERA Karnataka, including BLUEVALLEY ZEN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BLUEVALLEY ZEN is delayed beyond 10 May 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BLUEVALLEY ZEN?

The registered promoter entity is M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED,, a company as per the filing. Its CIN U45200KA2008PTC046468 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BLUEVALLEY ZEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in BLUEVALLEY ZEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLUEVALLEY ZEN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLUEVALLEY ZEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.