Registration approved Residential/Group Housing project

BLISS

By FINELINE INFRA PRIVATE LIMITED

RG-KA-50408 · RERA PRM/KA/RERA/1251/309/PR/200205/003239 · Last updated on RERA Karnataka portal: 23 Jan 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
May 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 66 documents Report an error

BLISS is a Residential/Group Housing project by FINELINE INFRA PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/200205/003239 on 5 Feb 2020. Possession is promised by 31 May 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameBLISS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/200205/003239
  • ReraGenie IDRG-KA-50408

Builder

  • NameFINELINE INFRA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45205KA2013PTC069459
  • Authorized SignatorySuhail Ahmed Shariff
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2020First promiseAug 2022Revised toMay 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Feb 2020
  • Promised completion31 May 2023
  • Revised completionRevised to 31 May 2023 (originally 31 Aug 2022)
  • Buildings1 building record
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Wing---83083

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 23 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 23 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,044 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 22.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni Sambyal Singh
EngineerRS Consultants / R.SYED KHADER

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionAug 2022 → May 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed66

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/200205/003239 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BESCOM NOCFile: BESCOM NOC.pdf23 Jan 2020
BWSSB NOCFile: BWSSB NOC.pdf23 Jan 2020
Bank Challan paid for Rs. 40440/-File: Canara bank challan.pdf17 Dec 2019
Project Head DetailsFile: Project Head Details.pdf17 Dec 2019
BWSSB NOC- AcknowledgementFile: BWSSB NOC - Ack.pdf17 Dec 2019
BESCOM NOC - AcknowledgementFile: BESCOM NOC - Ack.pdf17 Dec 2019
KSPCB NOCFile: KSPCB NOC.pdf17 Dec 2019
CertificateFile: Certificate of Incorporation-030613 (1).pdf-
3a Sanction plan and Building License-compressed_compressed-
Draft Agreement of sale AL-ZASZ BLISS - Final-
Sale Deed _ RTC-
ELEVATIONS AND SECTION-
Draft Of Allotment letter AL-ZASSZ BLISS-
Bliss LRes2-
Specs Lres-
2a EC from 1940 till 24-10-19-compressed-
3b Affidavit under sec 3(1) of RERA-
2c Notarized joint affidavit cum declaration-
Khatha-
JD-
DC Conversion_compressed-
26 Approval- NOC under sec 14 of KTCP Act-
27 Fire Force department-
28 Airport Authority of India-
32 SEIAA-
33 BSNL-
46 NOC in case of building proposals abutting to neighbouring properties-
Unnamed document-
39 Urban Land Ceiling-
38 BMRCL-
41Urban Arts Commission-
42 Inspector of Factories controller of explosives Railways-
43 District Magistrate-
44 Coastal Regulation Zone Authority-
ELEVATIONS AND SECTION-
ELEVATIONS AND SECTION-
DC Conversion_compressed-
LSR-
Balance Sheet 2018 - 2019File: Balance Sheet 2018.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet 2017.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet 2016.pdf-
Audited Profit and Loss Statement 2018 - 2019File: 2018.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2016.pdf-
Director's Report 2018 - 2019File: Alzassz - Director Report 2017-18.pdf-
Director's Report 2017 - 2018File: Alzassz - Director Report 2016-17.pdf-
Director's Report 2016 - 2017File: 2016.pdf-
Cash Flow Statement 2018 - 2019File: 2018.pdf-
Cash Flow Statement 2017 - 2018File: 2017.pdf-
Auditor's Report 2018 - 2019File: Alzassz - Auditor Report_2017-18.pdf-
Auditor's Report 2017 - 2018File: 2017.pdf-
Auditor's Report 2016 - 2017File: Alzassz - Auditor Report_2015-16.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: FY 18-19.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: FY 17-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: FY 16-17.pdf-
2b Notarized Form B-
Prospectus/BrochureFile: AL-ZASSZ Bliss Brochure (LR).pdf-
Advertisement Copy 1File: Advertisement copy.jpeg-
Tower Excel SheetFile: Flat wise breakup 17.09.2020.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: CFO Report - KSPCB.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5 Architect Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Completion Affidavit.pdf-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Rahath Gardenia-Completed-No date filed
MIMS Residency-Completed-No date filed
Greystone-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBLISSOther 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: FINELINE INFRA PRIVATE LIMITED

FINELINE INFRA PRIVATE LIMITED has 1 registration on RERA Karnataka, including BLISS. Its filings declare 3 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BLISS is delayed beyond 31 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BLISS?

The registered promoter entity is FINELINE INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U45205KA2013PTC069459 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BLISS?

The professionals named in the filing: Architect: Ani Sambyal Singh; Engineer: RS Consultants / R.SYED KHADER. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLISS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.