BILL-MART

By B G STEEL AND INFRA

RG-MH-01812 · RERA P50100021239 · Last updated on MahaRERA portal: 25 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Akola registration emailed to you, free during the pilot beta.
May 2028Possession promisedmoved 48 months from the original
2 of 11Construction stages doneacross 6 buildings; furthest along: Excavation, 97%
83 of 174Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

BILL-MART is a Commercial project by B G STEEL AND INFRA in Akola, Maharashtra, registered with MahaRERA as P50100021239 on 14 Jun 2019. Possession is promised by 30 May 2028. The completion date has moved by 48 months from the original filing. 91 of the 174 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameBILL-MART
  • TypeCommercial
  • Location
    • Mouje Akkalkot
    • Mini Byepass
    • Washim Road
    • Mouje Akkalkot
    • Akola
    • Akkalkot
    • Akola
    • 444002
  • Pincode444002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50100021239
  • ReraGenie IDRG-MH-01812

Builder

  • NameB G STEEL AND INFRA
  • Entity typePartnership
  • PartnersDIMPLE MANOJ BILALA, MANOJ MOHANLAL BILALA

Key dates

this monthRegisteredJun 2019First promiseMay 2024Revised toMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2019
  • Promised completion30 May 2028
  • Revised completionRevised to 30 May 2028 (originally 30 May 2024)
  • Buildings6 building records
  • Documents filed109 files

Current status

52%91 of 174 units booked
83.4%Work done, per cost certificate

Figures as on 25 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BILL-MARTNA550174174
Section AAA44000
Section AAB44000
Section AAC44000
Section AAD44000
Section AAE55000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 97%.

BILL-MART73%
ActivityProgress
Excavation97%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Section AA · wing ANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Section AA · wing BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Section AA · wing CNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Section AA · wing DNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Section AA · wing ENot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes94%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes85%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed201

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots201
Open Space201

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025

Approvals and building plan

Sanctioning authorityAkola Municipal Corporation
Permissible FSI15687.3
Proposed, not sanctioned15,687 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRAWAGI TOWER, TILAK ROAD, AKOLA
Estimated costRs 33.21 cr
Cost incurredRs 27.70 cr
Work done83.41%
BuildingWingEstimatedIncurred
BILL-MARTNARs 31.19 crRs 25.89 cr
-NARs 2.01 crRs 1.81 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH THOLE AND ASSOCIATES
EngineerMAKRAND S PANDE
Chartered AccountantYash Nagar
PartnerRole in project
B G STEEL AND INFRA-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50100017613May 2024 → May 2025

Reason as filed by the promoterWe have received revised permission and it is uploaded on the portal, due to increase in number of units we request to increase the period by 1 year as per Section 7(3) of the Act.

EA27062501821May 2024 → May 2028

Reason as filed by the promoterWe, B G Steel And Infra, the promoter of the real estate project “Bill Mart” (MahaRERA Registration No. P50100021239), hereby request an extension of the project completion timeline due to unavoidable delays beyond our control. The original Commencement Certificate (CC) was issued on 27/05/2019. Due to project-related changes, we applied for revised permissions on 01/03/2021. However, there was no response from the Municipal Corporation of Akola, prompting us to issue a legal notice on 16/09/2021. The Hon’ble Court, on 19/11/2022, granted deemed permission, but the revised CC was still not iss

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 May 2023

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1..pdf25 Jul 2026
Withdrawal Update Form 1File: FORM 1 2025-26 Q4.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q4.pdf2 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q4..pdf2 May 2026
Withdrawal Update Form 1File: Form 1 Architect.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q3 Sign.pdf29 Jan 2026
Withdrawal Update Form 1File: Architect Certificate June-25.pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer June-25.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q1-Sign.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 2025-26 Q2-Sign.pdf24 Oct 2025
Form 1File: Form 1 Architect.pdf27 Jun 2025
Form 2File: Form 2 Engineer.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Rera Sold Unsold Inventory.pdf27 Jun 2025
Form 3File: Form 3 Q4 24-25 sign.pdf27 Jun 2025
Form 3File: Form 3 Q3 24-25_1 sign.pdf27 Jun 2025
Form 1File: Form 1 2024-25 Q3.pdf27 Jun 2025
Form 2File: Form 2 2024-25 Q3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q3.pdf27 Jun 2025
Commencement certificateFile: Revision Commencement Certificate.pdf26 Jun 2025
Building plan approvalFile: Revision sanction Plan.pdf26 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A Quality Assuarance Certificate-Not Uploade.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024-25 Q3.pdf21 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024-25 Q3.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q2.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf21 Jan 2025
Certificates of CA (Form 3)File: From 3_.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Rera Sold Unsold Inventory.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate sept 2024.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate sept 2024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: RERA sold unsold Inventory.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Rera Sold Unsold Inventory sept 2024.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect.pdf7 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer.pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A.pdf7 Jun 2024
Certificates of CA (Form 3)File: FORM 3.pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Audit Report 23-24.pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Audit Report 22-23.pdf4 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect's Certificate.pdf17 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Rera Sold Unsold Inventory.pdf17 Jan 2024
Certificates of CA (Form 3)File: FORM 3_compressed.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Billmart Sold_unsold October .pdf15 Nov 2023
Building plan approvalFile: 11zon_JPG-to-PDF.pdf29 Aug 2023
Building Plan Approval (IOD)File: 11zon_JPG-to-PDF.pdf29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 11zon_JPG-to-PDF.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf28 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23.pdf28 Aug 2023
Certificates of CA (Form 3)File: Form 3 31-07-2023.pdf12 Aug 2023
Building plan approvalFile: Revision sanction Plan.pdf9 Aug 2023
Layout approvalFile: BILL MART Tentative Layout APPROVED LETTER.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: BILL MART Tentative Layout APPROVED LETTER.pdf9 Aug 2023
Building Plan Approval (IOD)File: Revision sanction Plan.pdf9 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Revision Commencement Certificate.pdf9 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect certificate July 2023.pdf9 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Engineer Certificate July 2023.pdf9 Aug 2023
Disclosure of sold/ booked inventoryFile: Rera sold unsold inventory July 2023.pdf9 Aug 2023
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf9 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf17 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Deem Permission Court Order_compressed.pdf15 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rera Form 2A 31-03-2022.pdf9 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Application to issue commencement certificate.pdf8 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect certificate 31-03-2023.pdf8 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Form 2 31-03-2023.pdf8 May 2023
Disclosure of sold/ booked inventoryFile: Rera Sold Unsold 31-03-2023.pdf8 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Deem permission inform letter.pdf27 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Deem permission notice_compressed.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf22 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf19 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf19 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventry.pdf19 Dec 2022
Other - LegalFile: Municipal Corporation Receipt.pdf19 Dec 2022
Other - TechnicalFile: Plinth Certificate.pdf19 Dec 2022
Declaration about Commencement CertificateFile: Declaration 22.pdf12 Jun 2022

How this compares with Akola

52%of this project is bookeddistrict median 0%
10%of Akola projects moved their completion datethis one moved by 48 months
33%of Akola registrations have lapsed or been cancelledthis one is on the register

Computed across the 120+ Akola projects on ReraGenie, from their own filings.

Keep BILL-MART on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouje Akkalkot, Akola120+ in Akola

2 kmBILL-MARTCompleted 2Lapsed / revoked 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: B G STEEL AND INFRA

B G STEEL AND INFRA has 1 registration on MahaRERA, including BILL-MART. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Akola district page.

Frequently asked questions

What are my rights if BILL-MART is delayed beyond 30 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BILL-MART?

The registered promoter entity is B G STEEL AND INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BILL-MART?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BILL-MART?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BILL-MART?

The professionals named in the filing: Architect: SANTOSH THOLE AND ASSOCIATES; Engineer: MAKRAND S PANDE; Chartered Accountant: Yash Nagar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BILL-MART?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BILL-MART. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BILL-MART to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.