Home / Browse projects / Thane, Maharashtra / BHUMIRAJ HILLS

Registered Litigation declared Others project

BHUMIRAJ HILLS

By BHUMIRAJ BUILDERS PVT. LTD.

RG-MH-40275 · RERA P51700019655 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 22 cases
  • Completion date moved by 40 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 40 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
43 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

BHUMIRAJ HILLS is a Others project by BHUMIRAJ BUILDERS PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700019655 on 20 Feb 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 40 months from the original filing. 0 of the 43 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameBHUMIRAJ HILLS
  • TypeOthers
  • Location
    • SECTOR 30/31
    • CBD BELAPUR
    • Navi Mumbai (M Corp.)
    • Thane
    • 400614
  • Pincode400614
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019655
  • ReraGenie IDRG-MH-40275

Builder

  • NameBHUMIRAJ BUILDERS PVT. LTD.
  • Entity typeCompany
  • DirectorBHUPENDRA MURJI SHAH
  • Other registrations3 more →

Key dates

this monthRegisteredFeb 2019First promiseAug 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 29 Aug 2024)
  • Buildings1 building record
  • Documents filed150 files

Current status

0%0 of 43 units booked

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 5NA111039443

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

TOWER 5: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,656 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI79800.0
Proposed, not sanctioned1,578 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 38 39, Patel Heritage, Plot No 15 and 17 sector 7 kharghar navi mumbai 410210

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh RADHAKISHAN CHANDA
ArchitectDimensions Architects Pvt Ltd
EngineerRajesh Shah
Chartered AccountantDhaval Joshi & Associates
Chartered AccountantR H Mehta & Co
PartnerRole in project
BHUMIRAJ BUILDERS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018920Aug 2024 → Dec 2027

Reason as filed by the promoterPrimary reason was lender not disbursing further money post ILFS Scenario. Further Covid hit the development adding woes to the project. Promoter continued development with its own capital to the extent feasible. However lender backing out and further pressurizing to repay the borrowed amount resulted in complete stoppage of work. Promoter sensing the action of lender has stopped booking and hence very less amount of apartment were sold. Due to friction between lender and promoter, many cases were filed among each other and whole matter was amicably settled in month of November 23 and hence ex

Litigation declared22

CaseCourtStatus
505/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
507/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
509/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
511/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
513/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
515/2016BELAPUR CIVIL COURTSIMILAR CASES DISPOSED IN PROMOTER FAVOR ORDER UPLOADED IN OTHER SECTION INFO IN LEGAL DECLARATION
180/2018HIGH COURT BOMBAYPRE ADMISSION STATUS INFO IN LEGAL DECLARATION
489/2016BELAPUR CIVIL COURTDISMISSAL ORDER INFO IN LEGAL DECLARATION
APPEAL/DESK-1/MNL/619/2023ADDITIONAL COMMISSIONER KOKAN DIVISION MUMBAIHEARING UNDER PROCESS INFO IN LEGAL DECLARATION
138/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
137/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
154/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
CP IB NO 1210 MB/2021NATIONAL COMPANY LAW TRIBUNAL MUMBAICase Withdrawn and Disposed
L 6667/2022HIGH COURT BOMBAYCase Withdrawn and Disposed
OA No 121/2022DRTWITHDRAWN
SECURITIZATION APPLICATION NO 232/2022DRTWITHDRAWN
100/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
127/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
31/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
91/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
36/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT
35/2023BELAPUR COURTAPPEAL FILED AGAINST PROMOTERS FAVORABLE ORDER OF PREVIOUS COURT

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Tower 5.pdf16 Jul 2026
Form 2File: Form 2 Tower 5.pdf16 Jul 2026
Form 3File: Form 3 Tower 5.pdf16 Jul 2026
Disclosure of Sold and Booked InventoryFile: Tower 5.pdf16 Jul 2026
Form 1File: Tower 5 Form 1.pdf25 Apr 2026
Form 2File: Tower 5 Form 2.pdf25 Apr 2026
Form 3File: Tower 5 Form 3.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Tower 5 Booking.pdf25 Apr 2026
Form 1File: Tower 5.pdf25 Apr 2026
Form 2File: Tower 5.PDF25 Apr 2026
Form 3File: Tower 5.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Tower 5.PDF25 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Tower No 5.pdf13 Feb 2026
Form 1File: Form 1 T-5 s.pdf4 Nov 2025
Form 2File: Form 2T-5.pdf4 Nov 2025
Form 3File: Form 3 T 5.PDF4 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold List T 5.PDF4 Nov 2025
Form 2A (FY 2019-2020)File: 2019-20.pdf18 Jul 2025
Form 2A (FY 2020-2021)File: 2020-21.pdf18 Jul 2025
Form 2A (FY 2021-2022)File: 2021-22.pdf18 Jul 2025
Form 2A (FY 2022-2023)File: 2022-23.pdf18 Jul 2025
Form 2A (FY 2023-2024)File: 2023-24.pdf18 Jul 2025
Form 1File: Form 1 Tower 5.PDF17 Jul 2025
Form 2File: Form 2 Tower 5.PDF17 Jul 2025
Form 3File: Form 3 Tower 5.PDF17 Jul 2025
Disclosure of Sold and Booked InventoryFile: T5 Sold List.PDF17 Jul 2025
Form 1File: Form1 T5.pdf17 Jun 2025
Form 2File: Tower 5.pdf17 Jun 2025
Form 3File: Form 3 T5.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Tower 5.PDF17 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T5.PDF29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-5.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T5.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (3).pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan-13-16.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-5.PDF15 Jul 2024
Disclosure of sold/ booked inventoryFile: Tower 5.PDF30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T5.PDF28 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: T5.PDF28 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-5.PDF17 Apr 2024
Certificates of CA (Form 3)File: T5.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-20.pdf26 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21.pdf26 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22.pdf26 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf26 Jan 2024
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf26 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-5.PDF24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 23.PDF24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 23.PDF24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.PDF24 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Unit Disclosure.pdf24 Jan 2024
Certificates of CA (Form 3)File: Form 3 T 5.PDF24 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_17_01_2022_17_56_30_144.pdf21 Nov 2023
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_17_01_2022_17_53_22_623.pdf21 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BBPL.pdf21 Nov 2023
Certificates of CA (Form 3)File: T-5.PDF20 Nov 2023
Certificates of CA (Form 3)File: T-5.PDF20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: T5.pdf18 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5.PDF6 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T5.PDF14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5.PDF20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: T 5.PDF28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5.PDF19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T5.PDF19 Jan 2023
Copy of the legal title reportFile: T 5.pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T5.pdf4 Oct 2022
Copy of the legal title reportFile: t5.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T5 compressed.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T5.PDF27 May 2022
Copy of the legal title reportFile: Tower 5.PDF26 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T5.PDF24 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5_compressed.pdf2 Feb 2022
Copy of the legal title reportFile: Tower 5_Title Report_compressed.pdf15 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Tower No 5 2018_19.pdf11 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Tower No 5 2019_20.pdf11 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Tower No 5 2020_21.pdf11 Nov 2021
Copy of the legal title reportFile: Tower 5_Title Report upto Sep 30,2021.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert T5.pdf13 Oct 2021

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 40 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHUMIRAJ HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CBD BELAPUR7,600+ in Thane

2 kmBHUMIRAJ HILLSCompleted 18Lapsed / revoked 7Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: BHUMIRAJ BUILDERS PVT. LTD.

BHUMIRAJ BUILDERS PVT.LTD. has 4 registrations on MahaRERA, including BHUMIRAJ HILLS and BHUMIRAJ HILLS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if BHUMIRAJ HILLS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHUMIRAJ HILLS?

The registered promoter entity is BHUMIRAJ BUILDERS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHUMIRAJ HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHUMIRAJ HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHUMIRAJ HILLS?

The professionals named in the filing: Architect: Rajesh RADHAKISHAN CHANDA; Architect: Dimensions Architects Pvt Ltd; Engineer: Rajesh Shah; Chartered Accountant: Dhaval Joshi & Associates; Chartered Accountant: R H Mehta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHUMIRAJ HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHUMIRAJ HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHUMIRAJ HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.