Home / Browse projects / Thane, Maharashtra / BHUMIRAJ HILLS

Registration lapsed No litigation declared Others project

BHUMIRAJ HILLS

By BHUMIRAJ BUILDERS PRIVATE LIMITED

RG-MH-03283 · RERA P51700020763 · Last updated on MahaRERA portal: 28 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

BHUMIRAJ HILLS is a Others project by BHUMIRAJ BUILDERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700020763 on 8 May 2019. Possession was promised by 30 Mar 2025 and is now 19 months past that date.

At a glance

Project

  • NameBHUMIRAJ HILLS
  • TypeOthers
  • Location
    • SECTOR 30 /31
    • CBD BELAPUR
    • Navi Mumbai (M Corp.)
    • Thane
    • 400614
  • Pincode400614
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020763
  • ReraGenie IDRG-MH-03283

Builder

  • NameBHUMIRAJ BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorBHUPENDRA MURJI SHAH

Key dates

19 months past promisethis monthRegisteredMay 2019PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 May 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 7NA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

TOWER 7: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,125 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI79800.0
Proposed, not sanctioned2,120 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 , PLATINUM SHREE CHINTAMANI CHS LTD SECTOR 14 SANPADA NAVI MUMBAI-400705

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
BHUMIRAJ BUILDERS PRIVATE LIMITED-

Litigation declared16

CaseCourtStatus
505/2016BELAPUR CIVIL COURTPENDING
507/2016BELAPUR CIVIL COURTPENDING
509/2016BELAPUR CIVIL COURTPENDING
511/2016BELAPUR CIVIL COURTPENDING
513/2016BELAPUR CIVIL COURTPENDING
515/2016BELAPUR CIVIL COURTPENDING
489/2016BELAPUR CIVIL COURTPENDING
180/2018HIGH COURT BOMBAYPENDING
SR 10017/20/3192/2020SDO ThanePENDING
445/2018Thane CourtPENDING
446/2018Thane CourtPENDING
447/2018Thane CourtPENDING
CP IB NO 1210 MB /2021NATIONAL COMPANY LAW TRIBUNAL MUMBAIPENDING
L 6667/2022HIGH COURT BOMBAYPENDING
OA No 121/2022DRTPENDING
SECURITIZATION APPLICATION NO 232/2022DRTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (1).pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T 7.PDF29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-7.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan-17-20.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-7.PDF15 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-7.PDF16 Apr 2024
Certificates of CA (Form 3)File: T7.PDF16 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_17_01_2022_17_56_30_144.pdf21 Nov 2023
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_17_01_2022_17_53_22_623.pdf21 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BBPL.pdf21 Nov 2023
Certificates of CA (Form 3)File: T-7.PDF20 Nov 2023
Certificates of CA (Form 3)File: T-7.PDF20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: T7.pdf18 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 7.PDF6 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T7.PDF14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 7.PDF20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: T 7.PDF28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 7.PDF19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T7.PDF19 Jan 2023
Copy of the legal title reportFile: T 7.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T7.pdf4 Oct 2022
Copy of the legal title reportFile: T7.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T7 compressed.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T7.PDF27 May 2022
Copy of the legal title reportFile: Tower 7.PDF26 May 2022
Certificates of CA (Form 3)File: T7.PDF24 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 7_compressed.pdf2 Feb 2022
Copy of the legal title reportFile: Tower 7_Title Report_compressed.pdf15 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Tower No 7 2019_20.pdf11 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Tower No 7 2020_21.pdf11 Nov 2021
Copy of the legal title reportFile: Tower 7_Title Report upto Sep 30,2021.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert T7.pdf13 Oct 2021
Certificates of CA (Form 3)File: Tower 7_form_3 upto Sep 30,2021.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T7.pdf17 Aug 2021
Copy of the legal title reportFile: T7.pdf15 Aug 2021
Certificates of CA (Form 3)File: Tower 7_form_3 upto Jun 30,2021.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Tower 7.PDF24 May 2021
Copy of the legal title reportFile: Title Report T7.pdf17 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert T7.pdf17 May 2021
Certificates of CA (Form 3)File: Form 3 T7.pdf17 May 2021
OtherFile: 323_compressed.pdf14 Feb 2021
OtherFile: 337_compressed.pdf14 Feb 2021
OtherFile: 407_compressed.pdf14 Feb 2021
OtherFile: 417_compressed.pdf14 Feb 2021
OtherFile: 419_compressed.pdf14 Feb 2021
OtherFile: 425_compressed.pdf14 Feb 2021
OtherFile: 423_compressed.pdf14 Feb 2021
OtherFile: 421_compressed.pdf14 Feb 2021
Copy of the legal title reportFile: Title Report T7.pdf19 Aug 2020
Certificates of CA (Form 3)File: Tower 7_form_3 upto Mar 31,2020.pdf19 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDF20191130_15141515.pdf30 Nov 2019
Copy of the legal title reportFile: PDF20191128_20114609.pdf28 Nov 2019
OtherFile: 342 of 2016.pdf26 Nov 2019
OtherFile: 506 of 2016.pdf26 Nov 2019
OtherFile: 508 of 2016.pdf26 Nov 2019
OtherFile: 510 of 2016.pdf26 Nov 2019
OtherFile: 512 Of 2016.pdf26 Nov 2019
OtherFile: 514 of 2016.pdf26 Nov 2019
OtherFile: Arch Bldg 7.pdf14 Aug 2019
OtherFile: Adv Bldg 7.pdf14 Aug 2019
Building plan approvalFile: 1.pdf3 May 2019
Building plan approvalFile: 2 (1).pdf3 May 2019
Building plan approvalFile: 3.pdf3 May 2019
Building plan approvalFile: 4.pdf3 May 2019
Layout approvalFile: Layout.pdf3 May 2019
PAN CardFile: Bhumiraj_Builders_Pan_Card.pdf3 May 2019
Copy of the legal title reportFile: Title Rt7.pdf3 May 2019
Details of encumbrancesFile: Details of Encumbrances.pdf3 May 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf3 May 2019
Building Plan Approval (IOD)File: 1.pdf3 May 2019
Building Plan Approval (IOD)File: 2 (1).pdf3 May 2019
Building Plan Approval (IOD)File: 3.pdf3 May 2019
Building Plan Approval (IOD)File: 4.pdf3 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Scan20190503_19275669.pdf3 May 2019
Declaration in FORM BFile: FORM B.pdf3 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf3 May 2019
Certificates of CA (Form 3)File: Form 3.pdf3 May 2019
Proforma of Allotment letterFile: Allotment.pdf3 May 2019
Proforma of Allotment letterFile: Agreement 7.pdf3 May 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHUMIRAJ HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CBD BELAPUR7,600+ in Thane

2 kmBHUMIRAJ HILLSCompleted 18Lapsed / revoked 6Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: BHUMIRAJ BUILDERS PRIVATE LIMITED

BHUMIRAJ BUILDERS PRIVATE LIMITED has 1 registration on MahaRERA, including BHUMIRAJ HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that BHUMIRAJ HILLS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BHUMIRAJ HILLS is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHUMIRAJ HILLS?

The registered promoter entity is BHUMIRAJ BUILDERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHUMIRAJ HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHUMIRAJ HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in BHUMIRAJ HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHUMIRAJ HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHUMIRAJ HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.