BHUMIRAJ HILLS

By BHUMIRAJ BUILDERS PVT.LTD.

RG-MH-94253 · RERA P51700016926 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 16 cases
  • Completion date moved by 55 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 55 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 79%
70 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 235 documents Report an error

BHUMIRAJ HILLS is a Others project by BHUMIRAJ BUILDERS PVT.LTD. in Thane, Maharashtra, registered with MahaRERA as P51700016926 on 22 Jun 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 55 months from the original filing. 5 of the 75 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameBHUMIRAJ HILLS
  • TypeOthers
  • Location
    • SECTOR 30/31
    • AGROLI BELAPUR
    • Navi Mumbai (M Corp.)
    • Thane
    • 400614
  • Pincode400614
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016926
  • ReraGenie IDRG-MH-94253

Builder

  • NameBHUMIRAJ BUILDERS PVT.LTD.
  • Entity typeCompany
  • DirectorBHUPENDRA MURJI SHAH
  • Other registrations3 more →

Key dates

this monthRegisteredJun 2018First promiseMay 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jun 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 May 2023)
  • Buildings2 building records
  • Documents filed235 files

Current status

7%5 of 75 units booked
83.8%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 2NA111039443
TOWER 3NA111032032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 79%.

TOWER 257%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 353%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises2%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
TOWER 211
TOWER 311

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,598 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAVI MUMBAI MUNCIPAL CORPORATION
Permissible FSI79800.0
Proposed, not sanctioned2,841 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No38,3, Patel Heritage,Plot No 15 and 17 Sector 7 Kharghar Navi Mumbai
Estimated costRs 14.69 cr
Cost incurredRs 12.31 cr
Work done83.83%
BuildingWingEstimatedIncurred
TOWER 2NARs 6.24 crRs 6.16 cr
TOWER 3NARs 6.24 crRs 6.16 cr
-NARs 2.20 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architects pvt ltd
ArchitectRajesh R. C.
EngineerCSE Consultants
Chartered AccountantDhaval Joshi & Associates
Chartered AccountantR. H. Mehta & Co.
PartnerRole in project
BHUMIRAJ BUILDERS PVT.LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018035May 2023 → Dec 2027

Reason as filed by the promoterPrimary reason was lender not disbursing further money post ILFS Scenario. Further Covid hit the development adding woes to the project. Promoter continued development with its own capital to the extent feasible. However lender backing out and further pressurizing to repay the borrowed amount resulted in complete stoppage of work. Promoter sensing the action of lender has stopped booking and hence very less amount of apartment were sold. Due to friction between lender and promoter, many cases were filed among each other and whole matter was amicably settled in month of November 23 and hence ex

Litigation declared16

CaseCourtStatus
505/2016BELAPUR CIVIL COURTPENDING
507/2016BELAPUR CIVIL COURTPENDING
509/2016BELAPUR CIVIL COURTPENDING
511/2016BELAPUR CIVIL COURTPENDING
513/2016BELAPUR CIVIL COURTPENDING
515/2016BELAPUR CIVIL COURTPENDING
180/2018HIGH COURT BOMBAYPENDING
489/2016BELAPUR CIVIL COURTPENDING
SR 10017/20/3192/2020SDO ThanePENDING
445/2018Thane Court Pending
446/2018Thane CourtPENDING
447/2018Thane CourtPENDING
CP IB No 1210 MB/2021National Company Law TribunalPENDING
L 6667/2022HIGH COURT BOMBAYPENDING
OA No 121/2022DRTPENDING
SECURITIZATION APPLICATION NO 232/2022DRTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed235

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 235 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 Tower 2N3.pdf16 Jul 2026
Withdrawal Update Form 1File: T2N3 Form 1.pdf2 May 2026
Withdrawal Update Form 2File: T2N3 Form 2.pdf2 May 2026
Withdrawal Update Form 3File: T2N3 Form 3.pdf2 May 2026
Withdrawal Update Form 1File: Tower 2N3.pdf27 Apr 2026
Withdrawal Update Form 2File: Tower 2N3 Mar 26.PDF27 Apr 2026
Withdrawal Update Form 3File: Tower 2N3.pdf27 Apr 2026
Withdrawal Update Form 1File: T-2N3.PDF25 Apr 2026
Withdrawal Update Form 1File: T-2N3.PDF25 Apr 2026
Withdrawal Update Form 2File: Scan-5-8.pdf25 Apr 2026
Withdrawal Update Form 2File: Tower 2N3 Mar 26.PDF25 Apr 2026
Withdrawal Update Form 3File: T2N3.PDF25 Apr 2026
Withdrawal Update Form 3File: Tower 2N3.pdf25 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Tower No 2 N 3.pdf13 Feb 2026
Form 1File: Form 1 T2N3.pdf4 Nov 2025
Form 2File: Form 2 T2N3.pdf4 Nov 2025
Form 3File: Form 3 T2N3 (2).pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold List T2N3.PDF4 Nov 2025
Form 2A (FY 2019-2020)File: 2019-20.pdf18 Jul 2025
Form 2A (FY 2020-2021)File: 2020-21.pdf18 Jul 2025
Form 2A (FY 2021-2022)File: 2021-22.pdf18 Jul 2025
Form 2A (FY 2022-2023)File: 2022-23.pdf18 Jul 2025
Form 2A (FY 2023-2024)File: 2023-24.pdf18 Jul 2025
Form 1File: Form 1 Tower 2N3 Final.pdf17 Jul 2025
Form 2File: Form 2 Tower 2 N 3.PDF17 Jul 2025
Form 3File: Form 3 Tower 2N3 Final.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Tower 2N3 Sold List.PDF17 Jul 2025
Form 1File: Form 1 T2n3.pdf17 Jun 2025
Form 2File: Tower 2N3.pdf17 Jun 2025
Form 3File: Form 3 T2n3.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Tower 2&3.PDF17 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form 3_compressed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (1).pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T 1.PDF29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T 2N3.PDF29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-2N3.pdf12 Nov 2024
Certificates of CA (Form 3)File: TOWER 2 N 3.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: File.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan-5-8.pdf22 Jul 2024
Certificates of CA (Form 3)File: T2N3.PDF22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-2N3.PDF15 Jul 2024
Disclosure of sold/ booked inventoryFile: Tower 2N3.PDF30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T2N3.PDF28 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: T2N3.PDF28 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T2N3.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-2N3.PDF17 Apr 2024
Certificates of CA (Form 3)File: T2N3.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-147-150.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-143-146.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-139-142.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-135-138.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-131-134.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-127-130.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-123-126.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-119-122.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-115-118.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-111-114.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-107-110.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-103-106.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-99-102.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-95-98.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-91-94.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-87-90.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan0003-83-86.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan0003-79-82.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan0003-75-78.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan0003-71-74.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-65-70.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-57-64.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-52-56.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-47-51.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-42-46.pdf12 Feb 2024
Certificates of CA (Form 3)File: Scan0003-37-41.pdf12 Feb 2024

How this compares with Thane

7%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 55 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHUMIRAJ HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGROLI BELAPUR7,600+ in Thane

2 kmBHUMIRAJ HILLSCompleted 18Lapsed / revoked 7Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: BHUMIRAJ BUILDERS PVT.LTD.

BHUMIRAJ BUILDERS PVT.LTD. has 4 registrations on MahaRERA, including BHUMIRAJ HILLS and BHUMIRAJ HILLS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if BHUMIRAJ HILLS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHUMIRAJ HILLS?

The registered promoter entity is BHUMIRAJ BUILDERS PVT.LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHUMIRAJ HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHUMIRAJ HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHUMIRAJ HILLS?

The professionals named in the filing: Architect: Dimensions Architects pvt ltd; Architect: Rajesh R. C.; Engineer: CSE Consultants; Chartered Accountant: Dhaval Joshi & Associates; Chartered Accountant: R. H. Mehta & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHUMIRAJ HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHUMIRAJ HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHUMIRAJ HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.