Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Sep 2023Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 71 documents Report an error

BHOOMIKA ELITES is a Residential/Group Housing project by B M R BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170322/004769 on 17 Mar 2022. Possession is promised by 29 Sep 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBHOOMIKA ELITES
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/170322/004769
  • ReraGenie IDRG-KA-02409

Builder

  • NameB M R BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AAVFB7439H1ZR
  • Authorized SignatoryRAM MOHAN V
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Mar 2022
  • Promised completion29 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHOOMIKA ELITES---84084

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 2 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
M SHASHI KUMAR--
M SHASHI KUMAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 24.50 cr-
On-site expenditure-Salaries of workersRs 65.00 lakh-
On-site expenditure-Site OverheadRs 25.00 lakh-
On-site expenditure-Consultants FeesRs 5.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHAMED MAQSOOD AHMED
EngineerMOHAMED MAQSOOD AHMED
Chartered AccountantNIKHIL N

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01362/2023-B M R BUILDERS AND DEVELOPERS06/09/2023

Documents filed71

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170322/004769 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form BFile: Form-B.pdf2 Mar 2022
Bank statementFile: IDBD Bank statement.pdf2 Mar 2022
BESCOM NOCFile: BESCOM NOC.pdf2 Mar 2022
Quarterly updateFile: Quarterly update details.jpeg2 Mar 2022
BWSSB NOCFile: NOC of BWSSB.pdf2 Mar 2022
Quarterly update detailFile: Quarterly update Details.pdf2 Mar 2022
AOS As per RERAFile: Agreement of Sale Proforma - Bhoomika Elite.pdf2 Mar 2022
Draft Sale DeedFile: DRAFT Sale Deed BHOMIKA ELITE.pdf2 Mar 2022
Guidance valueFile: Subregistor value.pdf2 Mar 2022
STPFile: STP plan.pdf2 Mar 2022
STP clarificationFile: Clarification about installation of STP in the Project.pdf2 Mar 2022
Area DetailsFile: Area details.pdf2 Mar 2022
cancellation or registered JDA dated 23-04-2012 in favor of Gurupriya Housing private limitedFile: Cancellation of JDA 716 21-22.pdf13 Dec 2021
notarized form-BFile: FORM - B.pdf13 Dec 2021
certified copy obtained by the concerned Sub-registrarFile: Karnataka sarkara nondani and mudranka (1).pdf13 Dec 2021
Non- litigation affidavitFile: Non Litigation.pdf13 Dec 2021
Building LicenseFile: Building License.pdf13 Dec 2021
STP in the projectFile: STP.pdf13 Dec 2021
NOC issued by BWSSBFile: NOC of BWSSB.pdf13 Dec 2021
NOC issued by BESCOMFile: BESCOM NOC.pdf13 Dec 2021
Proforma of Agreement for SaleFile: Sale Agreement Bhoomika Elites.pdf13 Dec 2021
Proforma For Sale DeedFile: Sale Deed BHOMIKA ELITE.pdf13 Dec 2021
RTC, survey 66/14-
Mutation, survey 66/14-
Encumbrance Certificate, survey 66/14-
Conversion/Alienation Order, survey 66/14-
Sale/Title/Gift Deed, survey 66/14-
JDA, survey 66/14-
Khatha, survey 66/14-
RTC, survey 66/17-
Mutation, survey 66/17-
Encumbrance Certificate, survey 66/17-
Conversion/Alienation Order, survey 66/17-
Sale/Title/Gift Deed, survey 66/17-
JDA, survey 66/17-
Khatha, survey 66/17-
Registration CertificateFile: certificate of registration of firm.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NON LITIGATION.pdf-
Balance Sheet 2020 - 2021File: BMR balance sheet.pdf-
Balance Sheet 2019 - 2020File: BS (1).pdf-
Audited Profit and Loss Statement 2020 - 2021File: BMR profit and loss.pdf-
Audited Profit and Loss Statement 2019 - 2020File: P&L.pdf-
Auditor's Report 2019 - 2020File: 3CB.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: B M R BUILDERS AND DEVELOPERS_16-Dec-2020_830891131.pdf-
PLAN_compressed (1)-
PLAN_compressed-
PLAN_compressed-
Bhoomika Elite Brochure-
RERA FORMB-
Affidavit-
Affidavit cum declaration-
BESCOM NOC-
68 BWSSB NOC Portal-
KSPCB-
Unnamed document-
Prospectus/BrochureFile: Bhoomika Elite Brochure.pdf-
Occupancy CertificateFile: OC.pdf-
Consent for operation issued by KSPCBFile: KSPCB -ELITES.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5 Architects Certificate - Completion.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA Certificate - Completion.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: AFFIDAVIT CUM DECLARATION.pdf-
ENGINNER'S CERTIFICATE (FORM - 06)File: Form 6 Engineers certificate Completion.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
BHOOMIKA SUNRISESurvey No.64/1, Kembathalli Village, ANJANAPURA Road, BangaloreCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BHOOMIKA ELITES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: B M R BUILDERS AND DEVELOPERS

B M R BUILDERS AND DEVELOPERS has 2 registrations on RERA Karnataka, including BHOOMIKA ELITES and BHOOMIKA MAYFLOWER. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BHOOMIKA ELITES is delayed beyond 29 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BHOOMIKA ELITES?

The registered promoter entity is B M R BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAVFB7439H1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BHOOMIKA ELITES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BHOOMIKA ELITES?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at BHOOMIKA ELITES?

The professionals named in the filing: Architect: MOHAMED MAQSOOD AHMED; Engineer: MOHAMED MAQSOOD AHMED; Chartered Accountant: NIKHIL N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHOOMIKA ELITES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHOOMIKA ELITES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHOOMIKA ELITES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.