Home / Browse projects / Beed, Maharashtra / BHAGWANDAS NAGRI
BHAGWANDAS NAGRI
By VAISHANAVI COTTON INDUSTRIES
RG-MH-08794 · RERA P52300022115 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Beed registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHAGWANDAS NAGRI is a Residential / Group Housing project by VAISHANAVI COTTON INDUSTRIES in Beed, Maharashtra, registered with MahaRERA as P52300022115 on 27 Aug 2019. Possession was promised by 30 Jun 2026 and is now 4 months past that date.
At a glance
Project
- NameBHAGWANDAS NAGRI
- TypeResidential / Group Housing
- Location
- Survey No.30/1/2
- Bahirwadi
- Adj. to New Mondha
- Tq.Dist Beed
- Bid (M Cl)
- Beed
- 431122
- Pincode431122
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52300022115
- ReraGenie IDRG-MH-08794
Builder
- NameVAISHANAVI COTTON INDUSTRIES
- Entity typePartnership
- PartnerHARISHCHANDRA SHRIPAT PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Aug 2019
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings16 building records
- Documents filed80 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BHAGWANDAS NAGRI BUILDING NO 01 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 02 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 03 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 04 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 05 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 06 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 07 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 08 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 09 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 10 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 11 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 12 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 13 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 14 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 15 | NA | 4 | 4 | 0 | 0 | 0 |
| BHAGWANDAS NAGRI BUILDING NO 16 | NA | 4 | 4 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building16
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
99 of 176 construction stages are filed complete across 16 buildings. The stage furthest along is Internal walls, at 90%.
BHAGWANDAS NAGRI BUILDING NO 0127%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BHAGWANDAS NAGRI BUILDING NO 0227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BHAGWANDAS NAGRI BUILDING NO 0327%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BHAGWANDAS NAGRI BUILDING NO 0485%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGWANDAS NAGRI BUILDING NO 0585%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGWANDAS NAGRI BUILDING NO 0686%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BHAGWANDAS NAGRI BUILDING NO 0791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BHAGWANDAS NAGRI BUILDING NO 0891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BHAGWANDAS NAGRI BUILDING NO 0985%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BHAGWANDAS NAGRI BUILDING NO 1071%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
BHAGWANDAS NAGRI BUILDING NO 1179%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
BHAGWANDAS NAGRI BUILDING NO 1279%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
BHAGWANDAS NAGRI BUILDING NO 1376%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
BHAGWANDAS NAGRI BUILDING NO 1491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BHAGWANDAS NAGRI BUILDING NO 1591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BHAGWANDAS NAGRI BUILDING NO 1691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 25% |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARC ASSOCIATES |
| Engineer | KAILASH TODKARI |
| Engineer | ER CHINMAY THIGLE |
| Engineer | CHINMAY THIGLE |
| Chartered Accountant | Rameshwar Ranbhare |
| Chartered Accountant | HARI DARAKH and ASSOCIATES |
| Partner | Role in project |
|---|---|
| VAISHANAVI COTTON INDUSTRIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Dec 2024
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2020-2021)File: 2 BHAGWANDAS Form-2A (2020-21).pdf | 26 Jun 2026 |
| Form 2A (FY 2021-2022)File: 3 BHAGWANDAS Form-2A (2021-22).pdf | 26 Jun 2026 |
| Form 2A (FY 2022-2023)File: 4 BHAGWANDAS Form-2A (2022-23).pdf | 26 Jun 2026 |
| Form 2A (FY 2023-2024)File: 5 BHAGWANDAS Form-2A (2023-24).pdf | 26 Jun 2026 |
| Form 2A (FY 2024-2025)File: 6 BHAGWANDAS Form-2A (2024-25).pdf | 26 Jun 2026 |
| Form 2A (FY 2025-2026)File: 7 BHAGWANDAS Form-2A (2025-26).pdf | 26 Jun 2026 |
| Form 1File: 1 Form 1 - Dec 24.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 - Dec 24.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Dec 24.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold Unsold Dec 24.pdf | 24 Jun 2026 |
| Form 1File: 1 Form 1 Mar 25.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 Mar 25.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Mar 25.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold-Unsold Mar 25.pdf | 24 Jun 2026 |
| Form 1File: 1 Form 1 Jun 25.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 Jun 25.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Jun 25.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold-Unsold Jun 25.pdf | 24 Jun 2026 |
| Form 1File: 1 Form 1 Sep 25.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 Sep 25.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Sep 25.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold-Unsold Sep 25.pdf | 24 Jun 2026 |
| Form 1File: 1 Form 1 Dec 25.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 Dec 25.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Dec 25.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold-Unsold Dec 25.pdf | 24 Jun 2026 |
| Form 1File: 1 Form 1 Mar 26.pdf | 24 Jun 2026 |
| Form 2File: 2 Form 2 Mar 26.pdf | 24 Jun 2026 |
| Form 3File: 3 Form-3 Mar 26.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold-Unsold Mar 26.pdf | 24 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vaishnavi Cotton_compressed.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Bhagwandas Nagri.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 Bhagwandas Nagri .pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - Architect's Mar 22.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Architect's Dec 22.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - Architect's Mar 23.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - Architect's Jun 23.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 - Architect's Sep 23.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 - Architect's Dec 23.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 - Architect's Mar 24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 - Architect's Jun 24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 - Architect's Sep 24.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architect's Dec 21.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Engineer Dec 22.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Engineer Sep 24.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 - Engineer Jun 24.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - Engineer Mar 24.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - Engineer Dec 23.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - Engineer Sep 23.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Engineer Jun 23.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Engineer Mar 23.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer Mar 22.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Engineer Dec 21.pdf | 18 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC PART.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Form 2A Engineers Certificate March 22.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Form 2A Engineers Certificate March 23.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Form 2A Engineers Certificate March 24.pdf | 18 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser of Booking Building_compressed.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20 (1).pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 (1).pdf | 13 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Vaishnavi Cotton-1-8_compressed.pdf | 19 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Vaishnavi Cotton-9-16_compressed.pdf | 19 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Certificate FORM 1_compressed.pdf | 20 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Site Engg FORM 2_compressed.pdf | 20 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Engg FORM 2A_compressed.pdf | 20 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE FORM 3_compressed (1).pdf | 20 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 (1).pdf | 20 Aug 2019 |
| Layout approvalFile: Building plan.pdf | 16 Aug 2019 |
| Building plan approvalFile: NA copy.pdf | 16 Aug 2019 |
| Copy of the legal title reportFile: search report1.pdf | 16 Aug 2019 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 16 Aug 2019 |
| Copy of Layout Approval (in case of layout)File: Building plan.pdf | 16 Aug 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: NA copy.pdf | 16 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 16 Aug 2019 |
| Declaration in FORM BFile: Form B (1).pdf | 16 Aug 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE (1).pdf | 16 Aug 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate1.pdf | 16 Aug 2019 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FORMAT.pdf | 16 Aug 2019 |
| PAN CardFile: Vaishnavi Cotton Pan.pdf | 15 Aug 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Beed
Computed across the 95 Beed projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BHAGWANDAS NAGRI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bahirwadi,Adj. to New Mondha, Tq.Dist Beed95 in Beed
Jijau Srushti 9
Suresh Ambadas Giram
PADMAVATI NAGAR
HANUMANT DASHARATHRAO SHINDE
SHINDE NAGAR
PRADIP ABHIMANYU SHINDE
Laxmi Heights
AJINKYA BABURAO SHIRALE
SANT DNYANESHWAR NAGAR
GOPALRAO GOVINDRAO MISAL
AMBY VALLEY
NIRMITI LANDMARK
Builder: VAISHANAVI COTTON INDUSTRIES
VAISHANAVI COTTON INDUSTRIES has 1 registration on MahaRERA, including BHAGWANDAS NAGRI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Beed district page.
Frequently asked questions
What does it mean that BHAGWANDAS NAGRI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BHAGWANDAS NAGRI is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHAGWANDAS NAGRI?
The registered promoter entity is VAISHANAVI COTTON INDUSTRIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHAGWANDAS NAGRI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BHAGWANDAS NAGRI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHAGWANDAS NAGRI?
The professionals named in the filing: Architect: ARC ASSOCIATES; Engineer: KAILASH TODKARI; Engineer: ER CHINMAY THIGLE; Engineer: CHINMAY THIGLE; Chartered Accountant: Rameshwar Ranbhare; Chartered Accountant: HARI DARAKH and ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHAGWANDAS NAGRI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback