Bavisha Gardeniaa Phase 3
RG-KA-95061 · RERA PRM/KA/RERA/1251/308/PR/210422/004144 · Last updated on RERA Karnataka portal: 16 Apr 2021
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Bavisha Gardeniaa Phase 3 is a Residential/Group Housing project by Bhavisha Properties in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210422/004144 on 22 Apr 2021. Possession is promised by 28 Feb 2022.
At a glance
Project
- NameBavisha Gardeniaa Phase 3
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/210422/004144
- ReraGenie IDRG-KA-95061
Builder
- NameBhavisha Properties
- Entity typeProprietorship Firm
- Authorized SignatoryS. Prasad Naidu
- Other registrations13 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Apr 2021
- Promised completion28 Feb 2022
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PHASE 3 | - | - | - | 92 | 0 | 92 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 16 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | Not applicable |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
As on 16 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M. Krishna Reddy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr. Ramesha D B |
| Engineer | Mr. G. Praveen Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed91
As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210422/004144 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| TITLE DEED IN THE NAME OF KRISHNA REDDYFile: TITLE DEED IN THE NAME OF KRISHNA REDDY.pdf | 16 Apr 2021 |
| RTCFile: RTC.pdf | 16 Apr 2021 |
| RTCFile: RTC.pdf | 16 Apr 2021 |
| WATER NOCFile: WATER FROM PANCHAYATH.pdf | 16 Apr 2021 |
| SELF ATTESTED PANFile: Self Attested PAN.pdf | 5 Apr 2021 |
| BALANCE SHEET 2019 20File: Balance Sheet 2019 20.pdf | 5 Apr 2021 |
| PROFIT AND LOSS 2019 20File: P AND L 2019 20.pdf | 5 Apr 2021 |
| ITR 2019 20File: ITR 2019 20.pdf | 5 Apr 2021 |
| BANK AFFIDAVIT RERA FORMATFile: BANK AFFIDAVIT RERA FORMAT.pdf | 5 Apr 2021 |
| RTC FOR SY 41/1A1File: RTC Gardeniaa 3 SY 41 A.pdf | 5 Apr 2021 |
| RTC FOR SY 41/1BFile: RTC Gardeniaa 3 SY 41B.pdf | 5 Apr 2021 |
| RTC FOR SY 42/1File: RTC Gardeniaa 3 SY 42 1.pdf | 5 Apr 2021 |
| ENCUMBRANCE CERTIFICATE FOR SY NO 41/1B1File: Gardeniaa Phase 3 EC Of Sy No. 41 1B1.pdf | 5 Apr 2021 |
| ENCUMBRANCE CERTIFICATE FOR SY NO 41/1B1File: EC FOR SY NO 41 1B1 FROM 1 4 2004 TO 21 01 2020.pdf | 5 Apr 2021 |
| ENCUMBRANCE CERTIFICATE FOR SY NO 42/1File: EC FOR SY NO 42 1 FROM 1 4 2004 TO 21 1 2020.pdf | 5 Apr 2021 |
| ENCUMBRANCE CERTIFICATE FOR SY NO 42/1File: Gardeniaa Phase 3 EC of Sy No 42 1 From 1 04 18 to till Date.pdf | 5 Apr 2021 |
| ENCUMBRANCE CERTIFICATE FOR SY NO 41/1A1File: Gardeniaa Phase 3 Sy No 41 1A1.pdf | 5 Apr 2021 |
| GROUND FLOOR PLANFile: Ground Floor Plan.pdf | 5 Apr 2021 |
| ELEVATION SECTION PLANFile: Elevation Plan.pdf | 5 Apr 2021 |
| NOC PCBFile: NOC PCB.pdf | 5 Apr 2021 |
| GROUND FLOOR AND TYPICAL FLOOR PLANFile: Ground Floor and Typical Floor Plan.pdf | 5 Apr 2021 |
| BANK ACCOUNT NUMBERFile: Bank Account.jpeg | 5 Apr 2021 |
| CertificateFile: REGISTRATION CERTIFICATE.pdf | - |
| COMMENCEMENT CERTIFICATE | - |
| PLAN Single Plot Plan | - |
| PLAN 1 | - |
| DRAFT SALE DEED G3 | - |
| DRAFT SALE AGREEMENT G3 | - |
| RTC | - |
| PLAN Single Plot Plan | - |
| PLAN ALL FLOOR AND TERRACE | - |
| ALLOTMENT G3 | - |
| BROCHURE | - |
| specification | - |
| EC | - |
| AFFIDAVIT SEC 3 | - |
| AFFIDAVIT CUM DECLARATION | - |
| KHATHA | - |
| JDA | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| NA FILE (2) | - |
| NA FILE (2) | - |
| NA FILE (2) | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| PLAN SITE PLAN | - |
| GROUND FLOOR PLAN | - |
| CONVERSION 1MB | - |
| Unnamed document | - |
| Balance Sheet 2019 - 2020File: BALANCE SHEET 2019 1MB.pdf | - |
| Balance Sheet 2018 - 2019File: BALANCE SHEET 2018 1MB.pdf | - |
| Balance Sheet 2017 - 2018File: Balance Sheet FY 2017.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: P&L 2019.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P&L 2018.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: P&L 2017.pdf | - |
| Director's Report 2019 - 2020File: NA FILE (2).jpg | - |
| Director's Report 2018 - 2019File: NA FILE (2).jpg | - |
| Director's Report 2017 - 2018File: NA FILE (2).jpg | - |
| Cash Flow Statement 2019 - 2020File: CASH FLOW ALL YEARS.pdf | - |
| Cash Flow Statement 2018 - 2019File: CASH FLOW ALL YEARS.pdf | - |
| Auditor's Report 2019 - 2020File: AUDITOR 2019.jpg | - |
| Auditor's Report 2018 - 2019File: AUDITOR 2018.pdf | - |
| Auditor's Report 2017 - 2018File: AUDITOR 2017.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Bavisha Gardeniaa Phase 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Bhavisha Properties
Bhavisha Properties has 14 registrations on RERA Karnataka, including Bavisha Gardeniaa and Bhavisha Bentley Greens. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Bavisha Gardeniaa Phase 3 is delayed beyond 28 Feb 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Bavisha Gardeniaa Phase 3?
The registered promoter entity is Bhavisha Properties, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Bavisha Gardeniaa Phase 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Bavisha Gardeniaa Phase 3?
The professionals named in the filing: Architect: Mr. Ramesha D B; Engineer: Mr. G. Praveen Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bavisha Gardeniaa Phase 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback