Home / Browse projects / Bengaluru Urban, Karnataka / AYDIN INFRA SIGNATURE 3
AYDIN INFRA SIGNATURE 3
By AYDIN INFRA
RG-KA-28329 · RERA PRM/KA/RERA/1251/310/PR/190625/007853 · Last updated on RERA Karnataka portal: 10 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
AYDIN INFRA SIGNATURE 3 is a Residential/Group Housing project by AYDIN INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190625/007853 on 19 Jun 2025. Possession is promised by 5 Aug 2027. 6 of the 12 units on this registration are recorded sold or booked, and 6 of 14 construction stages are filed complete.
At a glance
Project
- NameAYDIN INFRA SIGNATURE 3
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/190625/007853
- ReraGenie IDRG-KA-28329
Builder
- NameAYDIN INFRA
- Entity typePartnership Firm
- GSTIN29ACDFA0411A1ZA
- Authorized SignatorySyed Aslam Basha
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Jun 2025
- Promised completion5 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 10 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 12 | 0 | 12 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 14 construction stages are filed complete. The stage furthest along is Plastering inside, at 95%.
Building: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 95% |
| Joinery: Doors, Windows, Ventilators etc | 60% |
| Basic work of Water supply, Sanitary and Electrification | 60% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 70% |
| Railing and Grill fixing | 10% |
| Electrification, Water supply and Sanitary Finishing | 60% |
| Painting | 70% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 85% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 10 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 45% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 50% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 65% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 50% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 90% |
| Lifts | Yes | 50% |
| Corridor/Lobbies | Yes | 65% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 25% |
| Basement | Yes | 95% |
| Terrace | Yes | 35% |
| Outer Wall | Yes | 65% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 30% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K Lakshman | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 8.00 cr | Rs 56.13 lakh |
| On-site expenditure-Salaries of workers | Rs 1.00 cr | Rs 2.42 lakh |
| On-site expenditure-Consultants Fees | Rs 20.00 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 20.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 10.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ani Sambyal |
| Engineer | Ramesh Muthu Dasappa |
| Chartered Accountant | KAUSTUBHA L |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed91
As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190625/007853 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate Signed Aydin.pdf | 10 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate.pdf | 10 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate.pdf | 10 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 10 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate June 2026.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate June 2026.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf | 9 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 9 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Ca certificate new.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect Certificate.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Aydin Infra Signature 3.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Signature 3-Dec-2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate DEC 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Dec 2025.pdf | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Aydin Infra Profit & Loss 2023-2024File: 1 Aydin Infra Profit & Loss 2023-2024.pdf | 30 May 2025 |
| Aydin Infra Balance sheet 2023-2024File: 1 Aydin Infra Balance sheet 2023-2024.pdf | 30 May 2025 |
| Balance Sheet 2023-24File: 1 Balance Sheet 2023-24.pdf | 30 May 2025 |
| Profit and Loss 2023-24File: 1 Profit and Loss 2023-24.pdf | 30 May 2025 |
| Balance sheet Syed Aslam bashFile: 1 Balance sheet Syed Aslam bash.pdf | 30 May 2025 |
| GST Registration Aydin InfraFile: GST Registration Aydin Infra.pdf | 30 May 2025 |
| Source of Fund with supportive documentsFile: 2 Source of Fund with supportive documents.pdf | 30 May 2025 |
| Title DeedFile: 3 Title Deed.pdf | 30 May 2025 |
| Village mapFile: 5 Village map.pdf | 30 May 2025 |
| Floor plan & Section PlanFile: 7 Floor plan & Section Plan.pdf | 30 May 2025 |
| Water NOCFile: 8 Water NOC.pdf | 30 May 2025 |
| Bescom NOC and fees paid reciptFile: 8 Bescom NOC and fees paid recipt.pdf | 30 May 2025 |
| Query AnswersFile: Query Answers.pdf | 30 May 2025 |
| Balnce sheet & Profit and LossFile: 2 Balnce sheet & Profit and Loss.pdf | 6 May 2025 |
| Title DeedFile: 3 Title Deed.pdf | 6 May 2025 |
| KhataFile: 4 Khata.pdf | 6 May 2025 |
| Zonal RegulationFile: 8 Zonal Regulation.pdf | 6 May 2025 |
| Floor planFile: 10 Floor plan.pdf | 6 May 2025 |
| Section PlanFile: 10 Section Plan.pdf | 6 May 2025 |
| Abstract estimationFile: 14 Abstract estimation.pdf | 6 May 2025 |
| Queries ReplyFile: Queries Reply.pdf | 6 May 2025 |
| Source of Fund with supportive documentsFile: 1 Source of Fund with supportive documents.pdf | 4 Apr 2025 |
| GST Registration Aydin InfraFile: 2 GST Registration Aydin Infra.pdf | 4 Apr 2025 |
| Balance Sheet with SchedulesFile: 3 Balance Sheet with Schedules.pdf | 4 Apr 2025 |
| profit & Loss with SchedulesFile: 3 profit & Loss with Schedules.pdf | 4 Apr 2025 |
| KhataFile: 8 Khata.pdf | 4 Apr 2025 |
| Non Litigation AffidavitFile: 9 Non Litigation Affidavit.pdf | 4 Apr 2025 |
| Single Layout Plan DeclrationFile: 10 Single Layout Plan Declration.pdf | 4 Apr 2025 |
| Single Layout Order DeclrationFile: 11 Single Layout Order Declration.pdf | 4 Apr 2025 |
| Approved Building planFile: 12 Approved Building plan.pdf | 4 Apr 2025 |
| KSPCB NOC DeclarationFile: 19 KSPCB NOC Declaration.pdf | 4 Apr 2025 |
| Declration STPFile: 21 Declration STP.pdf | 4 Apr 2025 |
| AGREEMENT FOR SALEFile: 24 AGREEMENT FOR SALE.pdf | 4 Apr 2025 |
| ALLOTMENT LETTERFile: 24 ALLOTMENT LETTER.pdf | 4 Apr 2025 |
| JDA AfidavitFile: JDA Afidavit.pdf | 4 Apr 2025 |
| No Mortage AffidavitFile: No Mortage Affidavit.pdf | 4 Apr 2025 |
| Query answersFile: Query anwers 04-04-2025.pdf | 4 Apr 2025 |
| Registration CertificateFile: GST Registration Aydin Infra.pdf | - |
| GST CertificateFile: GST Registration Aydin Infra.pdf | - |
| Partnership DeedFile: Partnershp Deed Aydin Infra.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 5 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 6 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| Balance Sheet 2023 - 2024File: Aydin Infra Balance sheet 2023-2024.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Aydin Infra profit & Loss 2023-2024.pdf | - |
| Building License | - |
| Approved Building plan | - |
| Sectional drawing | - |
| Structural Stability Certificate | - |
| Project Specfication | - |
| Form B affidavit | - |
| Sec 3(1) | - |
| legal Report | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AYDIN INFRA SIGNATURE 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: AYDIN INFRA
AYDIN INFRA has 1 registration on RERA Karnataka, including AYDIN INFRA SIGNATURE 3. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AYDIN INFRA SIGNATURE 3 is delayed beyond 5 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AYDIN INFRA SIGNATURE 3?
The registered promoter entity is AYDIN INFRA, a partnership firm as per the filing. Its GSTIN 29ACDFA0411A1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AYDIN INFRA SIGNATURE 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AYDIN INFRA SIGNATURE 3?
The professionals named in the filing: Architect: Ani Sambyal; Engineer: Ramesh Muthu Dasappa; Chartered Accountant: KAUSTUBHA L. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AYDIN INFRA SIGNATURE 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback