Home / Browse projects / Bengaluru Urban, Karnataka / ATZ AREVA
ATZ AREVA
RG-KA-10384 · RERA PRM/KA/RERA/1251/446/PR/210705/004180 · Last updated on RERA Karnataka portal: 1 Mar 2025
Source: official RERA Karnataka filing
Red flags
- 37 complaints at RERA Karnataka
- Completion date moved by 30 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
ATZ AREVA is a Residential/Group Housing project by ATZ PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210705/004180 on 5 Jul 2021. Possession is promised by 30 Jun 2026. The completion date has moved by 30 months from the original filing. 37 complaints are on record with the regulator.
At a glance
Project
- NameATZ AREVA
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/210705/004180
- ReraGenie IDRG-KA-10384
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Jul 2021
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 1 Dec 2023)
- Buildings1 building record
- Documents filed126 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ATZ AREVA | - | - | - | 90 | 0 | 90 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 1 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 1 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | No | Not applicable |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S KUSHAL PROPERTIES, Represented by its partners Mr. Mohammed Azar Pasha and Smt. Chandraprabha | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT.LTD. |
| Engineer | MANOHAR CONSULTANTS, CIVIL AND STRUCTURAL ENGINEERS |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApplied for modification
No reason recorded in the filing
Complaints filed with RERA Karnataka37
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00112/2024 | - | ATZ PROPERTIES | 23/01/2024 |
| 00213/2024 | - | ATZ PROPERTIES | 21/02/2024 |
| 00223/2024 | - | ATZ PROPERTIES | 23/02/2024 |
| 00404/2024 | - | ATZ PROPERTIES | 22/04/2024 |
| 00407/2024 | - | ATZ PROPERTIES | 23/04/2024 |
| 00417/2024 | - | ATZ PROPERTIES | 29/04/2024 |
| 00423/2024 | - | ATZ PROPERTIES | 04/05/2024 |
| 00545/2024 | - | ATZ PROPERTIES | 05/06/2024 |
| 00546/2024 | - | ATZ PROPERTIES | 05/06/2024 |
| 00548/2024 | - | ATZ PROPERTIES | 06/06/2024 |
| 00557/2024 | - | ATZ PROPERTIES | 07/06/2024 |
| 00580/2024 | - | ATZ PROPERTIES | 12/06/2024 |
| 00604/2024 | - | ATZ PROPERTIES | 18/06/2024 |
| 00623/2024 | - | ATZ PROPERTIES | 21/06/2024 |
| 00633/2024 | - | ATZ PROPERTIES | 25/06/2024 |
| 00634/2024 | - | ATZ PROPERTIES | 25/06/2024 |
| 00638/2024 | - | ATZ PROPERTIES | 26/06/2024 |
| 00720/2024 | - | ATZ PROPERTIES | 13/08/2024 |
| 00900/2024 | - | ATZ PROPERTIES | 17/09/2024 |
| 00902/2024 | - | ATZ PROPERTIES | 17/09/2024 |
| 00914/2024 | - | ATZ PROPERTIES | 21/09/2024 |
| 00242/2025 | - | ATZ PROPERTIES | 04/02/2025 |
| 00264/2025 | - | ATZ PROPERTIES | 10/02/2025 |
| 00356/2025 | - | ATZ PROPERTIES | 01/03/2025 |
| 00784/2025 | - | ATZ PROPERTIES | 28/05/2025 |
| 00488/2026 | - | ATZ PROPERTIES | 07/05/2026 |
| 00503/2026 | - | ATZ PROPERTIES | 11/05/2026 |
| 00504/2026 | - | ATZ PROPERTIES | 11/05/2026 |
| 00505/2026 | - | ATZ PROPERTIES | 11/05/2026 |
| 00513/2026 | - | ATZ PROPERTIES | 12/05/2026 |
| 00568/2026 | - | ATZ PROPERTIES | 21/05/2026 |
| 00590/2026 | - | ATZ PROPERTIES | 26/05/2026 |
| 00604/2026 | - | ATZ PROPERTIES | 27/05/2026 |
| 00613/2026 | - | ATZ PROPERTIES | 29/05/2026 |
| 00772/2026 | - | ATZ PROPERTIES | 02/07/2026 |
| 01068/2026 | - | ATZ PROPERTIES | 27/08/2026 |
| 01116/2026 | - | ATZ PROPERTIES | 10/09/2026 |
Documents filed126
As listed on the registration, under the names the promoter filed them with; the newest 80 of 126 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210705/004180 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer CertificateFile: ENGINEER CERTIFICATE.PDF | 1 Mar 2025 |
| Engineer Certificate structureFile: Engineer Certificate Structural.PDF | 1 Mar 2025 |
| sold and unsold consent letterFile: CONSENT LETTER AREVA.PDF | 1 Mar 2025 |
| BWSSB NOCFile: BWSSB - 2025.PDF | 1 Mar 2025 |
| BESCOM NOCFile: BESCOM 74-75.PDF | 1 Mar 2025 |
| NOTARIZED AFFIDAVITFile: AFFIDAVIT AREVA.PDF | 1 Mar 2025 |
| AIRPORT NOCFile: AIRPORT AUTHORITY AREVA NOC.PDF | 1 Mar 2025 |
| Annual audit reportFile: ATZ PROPERTIES 23-24_Anual report.pdf | 29 Jan 2025 |
| quatrely upload updateFile: Quarterly Update Details Q4.pdf | 29 Jan 2025 |
| Notarized Affidavit EX7File: RERA FORM EX 7 AFFIDIVIT.PDF | 29 Jan 2025 |
| renewal blue printFile: Approved Drawing Plan G+12_.pdf | 29 Jan 2025 |
| renew order copyFile: Areva Building Licence G+12.PDF | 29 Jan 2025 |
| engineer certificateFile: ENGINEER CERTIFICATE.PDF | 29 Jan 2025 |
| Engineer certificate Ex-6File: RERA FORM EX 7 AFFIDIVIT (old).PDF | 29 Jan 2025 |
| ANUUAL AUDIT REPORTFile: ATZ PROPERTIES 23-24_Anual report.pdf | 2 Jan 2025 |
| NOTARIZED AFFIDAVIT IN FORM EX-7File: RERA FORM EX 7 AFFIDIVIT.PDF | 2 Jan 2025 |
| QUATERLY UPLOADFile: Quarterly Update Details Q4.pdf | 2 Jan 2025 |
| ENGINNER CERTIFICATEFile: Engineer Certificate RERA.PDF | 2 Jan 2025 |
| FORM B AFFIDAVITFile: RERA FORM B.PDF | 2 Jan 2025 |
| BBMP DEMAND NOTEFile: BBMP DEMAND NOTE - AREVA.PDF | 2 Jan 2025 |
| BUILDING LIECENCEFile: BDA SANCTION PLAN ORDER AREVA.PDF | 2 Jan 2025 |
| Bank Details: A/C Name- ATZ AREVA, A/c No. 73790200001097File: Passbook for rera-areva -1.PDF | 20 Mar 2021 |
| Sale deed in the name of Mr.Mohammed Azhar PashaFile: SALE DEED FOR AZAR PASHA - RERA Areva.pdf | 20 Mar 2021 |
| Gift Deed in the name of Smt.ChandraprabhaFile: gift deed.pdf | 20 Mar 2021 |
| Partnership Deed in the name of M/s Kushal properties-Partners-Mr.Mohammed Azhar Pasha and Smt.ChandFile: PARTNERSHIP DEED.PDF | 20 Mar 2021 |
| EC for both Survey NumbersFile: Main EC -RERA.pdf | 20 Mar 2021 |
| Sanctioned floor PlansFile: Sanctioned floor plans.pdf | 20 Mar 2021 |
| Amalgamation DeedFile: Amalgamation Deed-RERA.pdf | 20 Mar 2021 |
| CertificateFile: REGISTRATION CERTIFICATE.PDF | - |
| Project Details | - |
| Already registered project ongoing detailsFile: Directors Reporrt 2023-24.PDF | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Areva Building Licence G+12 PDF.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: Directors Reporrt 2023-24.PDF | - |
| List Of AllotteesFile: Directors Reporrt 2023-24.PDF | - |
| List Of ComplaintsFile: Directors Reporrt 2023-24.PDF | - |
| Consent LetterFile: RERA FORM B.PDF | - |
| List Of Pending LitigationsFile: Directors Reporrt 2023-24.PDF | - |
| Chartered Accountant CertificateFile: CA Certificate RERA.pdf | - |
| Notarized AffidavitFile: RERA FORM EX 7 AFFIDIVIT.PDF | - |
| Engineer CertificateFile: ENGINEER CERTIFICATE.PDF | - |
| Architect CertificateFile: ARCHITECT CERTIFICATE RERA.PDF | - |
| Structural Engineer Certificate for stability of structureFile: Engineer Certificate RERA.PDF | - |
| Modification of Plan DetailsFile: Site Plan Floor_AREVA.pdf | - |
| Modification of Plan DetailsFile: Approved Drawing Plan G+12_compressed.pdf | - |
| Modification of Plan DetailsFile: Directors Reporrt 2023-24.PDF | - |
| Modification of Plan DetailsFile: Directors Reporrt 2023-24.PDF | - |
| Modification of Plan DetailsFile: Sold Unsold Details.xlsx | - |
| Modification of Plan DetailsFile: Sold Unsold Details.xlsx | - |
| Document 1File: Fire NOC Updated.pdf | - |
| Document 2File: Airport Authority NOC 74-75.PDF | - |
| Document 3File: BESCOM 74-75.PDF | - |
| Document 4File: BWSSB 74-75.PDF | - |
| Document 5File: NOC KSPCB AREVA.PDF | - |
| Document 6File: BSNL 74-75.PDF | - |
| Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE RERA.PDF | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate RERA.PDF | - |
| CA Certificate for Funds UtilizationFile: CA certificate RERA_RERA.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE RERA.PDF | - |
| Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE.PDF | - |
| CA Certificate for Funds required for Project CompletionFile: CA certificate RERA_RERA.pdf | - |
| AffidavitFile: RERA FORM EX 7 AFFIDIVIT.PDF | - |
| Latest Encumbrance CertificateFile: areva latest EC.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Approval Letter For AREVA | - |
| Approved Layout Plan | - |
| proforma for Sale deed for rera | - |
| proforma agreement of sale for rera | - |
| RTC FOR RERA | - |
| Approved Section of building plan areva | - |
| Area development plan of project | - |
| proforma of alloment letter for rera | - |
| Brochure of current | - |
| Project Specification | - |
| EC for 74-75 for rera | - |
| affidavit for areva_ | - |
| AFFIDAVIT CUM DECLATION FOR AREVA | - |
| KATHA CERTIFICATE AND ABSTRACT OF 74-75 | - |
| JDA OF AREVA for RERA | - |
| SHARING AGREEMENT OF AREVA | - |
| Unnamed document | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ATZ ESTRELLA | - | Ongoing | Dec 2021 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ATZ AREVA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 89 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ATZ PROPERTIES
ATZ Properties has 2 registrations on RERA Karnataka, including ATZ ESTRELLA and ATZ AREVA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ATZ AREVA is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ATZ AREVA?
The registered promoter entity is ATZ PROPERTIES, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ATZ AREVA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ATZ AREVA?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at ATZ AREVA?
The professionals named in the filing: Architect: ASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT.LTD.; Engineer: MANOHAR CONSULTANTS, CIVIL AND STRUCTURAL ENGINEERS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATZ AREVA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.