Home / Browse projects / Bengaluru Urban, Karnataka / ATZ AREVA

Registration approved Residential/Group Housing project

ATZ AREVA

By ATZ PROPERTIES

RG-KA-10384 · RERA PRM/KA/RERA/1251/446/PR/210705/004180 · Last updated on RERA Karnataka portal: 1 Mar 2025

Source: official RERA Karnataka filing

Red flags

  • 37 complaints at RERA Karnataka
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jun 2026Possession promisedmoved 30 months from the original
37Complaints at RERA Karnatakaon this registration
Jump to the 126 documents Report an error

ATZ AREVA is a Residential/Group Housing project by ATZ PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210705/004180 on 5 Jul 2021. Possession is promised by 30 Jun 2026. The completion date has moved by 30 months from the original filing. 37 complaints are on record with the regulator.

At a glance

Project

  • NameATZ AREVA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/210705/004180
  • ReraGenie IDRG-KA-10384

Builder

  • NameATZ PROPERTIES
  • Entity typeProprietorship Firm
  • Authorized SignatoryATHIQUE AHMED
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2021First promiseDec 2023Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Jul 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 1 Dec 2023)
  • Buildings1 building record
  • Documents filed126 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATZ AREVA---90090

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 1 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,755 sq m
Named landowners1
LandownerVillageDistrict
M/S KUSHAL PROPERTIES, Represented by its partners Mr. Mohammed Azar Pasha and Smt. Chandraprabha--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 32.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT.LTD.
EngineerMANOHAR CONSULTANTS, CIVIL AND STRUCTURAL ENGINEERS

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/446/PR/250207/004180Dec 2023 → Dec 2024

Reason as filed by the promoterApplied for modification

ExtensionDec 2024 → Jun 2026

No reason recorded in the filing

Complaints filed with RERA Karnataka37

Case no.ComplainantRespondentFiled
00112/2024-ATZ PROPERTIES23/01/2024
00213/2024-ATZ PROPERTIES21/02/2024
00223/2024-ATZ PROPERTIES23/02/2024
00404/2024-ATZ PROPERTIES22/04/2024
00407/2024-ATZ PROPERTIES23/04/2024
00417/2024-ATZ PROPERTIES29/04/2024
00423/2024-ATZ PROPERTIES04/05/2024
00545/2024-ATZ PROPERTIES05/06/2024
00546/2024-ATZ PROPERTIES05/06/2024
00548/2024-ATZ PROPERTIES06/06/2024
00557/2024-ATZ PROPERTIES07/06/2024
00580/2024-ATZ PROPERTIES12/06/2024
00604/2024-ATZ PROPERTIES18/06/2024
00623/2024-ATZ PROPERTIES21/06/2024
00633/2024-ATZ PROPERTIES25/06/2024
00634/2024-ATZ PROPERTIES25/06/2024
00638/2024-ATZ PROPERTIES26/06/2024
00720/2024-ATZ PROPERTIES13/08/2024
00900/2024-ATZ PROPERTIES17/09/2024
00902/2024-ATZ PROPERTIES17/09/2024
00914/2024-ATZ PROPERTIES21/09/2024
00242/2025-ATZ PROPERTIES04/02/2025
00264/2025-ATZ PROPERTIES10/02/2025
00356/2025-ATZ PROPERTIES01/03/2025
00784/2025-ATZ PROPERTIES28/05/2025
00488/2026-ATZ PROPERTIES07/05/2026
00503/2026-ATZ PROPERTIES11/05/2026
00504/2026-ATZ PROPERTIES11/05/2026
00505/2026-ATZ PROPERTIES11/05/2026
00513/2026-ATZ PROPERTIES12/05/2026
00568/2026-ATZ PROPERTIES21/05/2026
00590/2026-ATZ PROPERTIES26/05/2026
00604/2026-ATZ PROPERTIES27/05/2026
00613/2026-ATZ PROPERTIES29/05/2026
00772/2026-ATZ PROPERTIES02/07/2026
01068/2026-ATZ PROPERTIES27/08/2026
01116/2026-ATZ PROPERTIES10/09/2026

Documents filed126

As listed on the registration, under the names the promoter filed them with; the newest 80 of 126 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210705/004180 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer CertificateFile: ENGINEER CERTIFICATE.PDF1 Mar 2025
Engineer Certificate structureFile: Engineer Certificate Structural.PDF1 Mar 2025
sold and unsold consent letterFile: CONSENT LETTER AREVA.PDF1 Mar 2025
BWSSB NOCFile: BWSSB - 2025.PDF1 Mar 2025
BESCOM NOCFile: BESCOM 74-75.PDF1 Mar 2025
NOTARIZED AFFIDAVITFile: AFFIDAVIT AREVA.PDF1 Mar 2025
AIRPORT NOCFile: AIRPORT AUTHORITY AREVA NOC.PDF1 Mar 2025
Annual audit reportFile: ATZ PROPERTIES 23-24_Anual report.pdf29 Jan 2025
quatrely upload updateFile: Quarterly Update Details Q4.pdf29 Jan 2025
Notarized Affidavit EX7File: RERA FORM EX 7 AFFIDIVIT.PDF29 Jan 2025
renewal blue printFile: Approved Drawing Plan G+12_.pdf29 Jan 2025
renew order copyFile: Areva Building Licence G+12.PDF29 Jan 2025
engineer certificateFile: ENGINEER CERTIFICATE.PDF29 Jan 2025
Engineer certificate Ex-6File: RERA FORM EX 7 AFFIDIVIT (old).PDF29 Jan 2025
ANUUAL AUDIT REPORTFile: ATZ PROPERTIES 23-24_Anual report.pdf2 Jan 2025
NOTARIZED AFFIDAVIT IN FORM EX-7File: RERA FORM EX 7 AFFIDIVIT.PDF2 Jan 2025
QUATERLY UPLOADFile: Quarterly Update Details Q4.pdf2 Jan 2025
ENGINNER CERTIFICATEFile: Engineer Certificate RERA.PDF2 Jan 2025
FORM B AFFIDAVITFile: RERA FORM B.PDF2 Jan 2025
BBMP DEMAND NOTEFile: BBMP DEMAND NOTE - AREVA.PDF2 Jan 2025
BUILDING LIECENCEFile: BDA SANCTION PLAN ORDER AREVA.PDF2 Jan 2025
Bank Details: A/C Name- ATZ AREVA, A/c No. 73790200001097File: Passbook for rera-areva -1.PDF20 Mar 2021
Sale deed in the name of Mr.Mohammed Azhar PashaFile: SALE DEED FOR AZAR PASHA - RERA Areva.pdf20 Mar 2021
Gift Deed in the name of Smt.ChandraprabhaFile: gift deed.pdf20 Mar 2021
Partnership Deed in the name of M/s Kushal properties-Partners-Mr.Mohammed Azhar Pasha and Smt.ChandFile: PARTNERSHIP DEED.PDF20 Mar 2021
EC for both Survey NumbersFile: Main EC -RERA.pdf20 Mar 2021
Sanctioned floor PlansFile: Sanctioned floor plans.pdf20 Mar 2021
Amalgamation DeedFile: Amalgamation Deed-RERA.pdf20 Mar 2021
CertificateFile: REGISTRATION CERTIFICATE.PDF-
Project Details-
Already registered project ongoing detailsFile: Directors Reporrt 2023-24.PDF-
Modified plan details site plan, floor plans, Plan Licence LetterFile: Areva Building Licence G+12 PDF.pdf-
Elevation, Sections, Specifications ( If changes are there )File: Directors Reporrt 2023-24.PDF-
List Of AllotteesFile: Directors Reporrt 2023-24.PDF-
List Of ComplaintsFile: Directors Reporrt 2023-24.PDF-
Consent LetterFile: RERA FORM B.PDF-
List Of Pending LitigationsFile: Directors Reporrt 2023-24.PDF-
Chartered Accountant CertificateFile: CA Certificate RERA.pdf-
Notarized AffidavitFile: RERA FORM EX 7 AFFIDIVIT.PDF-
Engineer CertificateFile: ENGINEER CERTIFICATE.PDF-
Architect CertificateFile: ARCHITECT CERTIFICATE RERA.PDF-
Structural Engineer Certificate for stability of structureFile: Engineer Certificate RERA.PDF-
Modification of Plan DetailsFile: Site Plan Floor_AREVA.pdf-
Modification of Plan DetailsFile: Approved Drawing Plan G+12_compressed.pdf-
Modification of Plan DetailsFile: Directors Reporrt 2023-24.PDF-
Modification of Plan DetailsFile: Directors Reporrt 2023-24.PDF-
Modification of Plan DetailsFile: Sold Unsold Details.xlsx-
Modification of Plan DetailsFile: Sold Unsold Details.xlsx-
Document 1File: Fire NOC Updated.pdf-
Document 2File: Airport Authority NOC 74-75.PDF-
Document 3File: BESCOM 74-75.PDF-
Document 4File: BWSSB 74-75.PDF-
Document 5File: NOC KSPCB AREVA.PDF-
Document 6File: BSNL 74-75.PDF-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE RERA.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate RERA.PDF-
CA Certificate for Funds UtilizationFile: CA certificate RERA_RERA.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE RERA.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE.PDF-
CA Certificate for Funds required for Project CompletionFile: CA certificate RERA_RERA.pdf-
AffidavitFile: RERA FORM EX 7 AFFIDIVIT.PDF-
Latest Encumbrance CertificateFile: areva latest EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Approval Letter For AREVA-
Approved Layout Plan-
proforma for Sale deed for rera-
proforma agreement of sale for rera-
RTC FOR RERA-
Approved Section of building plan areva-
Area development plan of project-
proforma of alloment letter for rera-
Brochure of current-
Project Specification-
EC for 74-75 for rera-
affidavit for areva_-
AFFIDAVIT CUM DECLATION FOR AREVA-
KATHA CERTIFICATE AND ABSTRACT OF 74-75-
JDA OF AREVA for RERA-
SHARING AGREEMENT OF AREVA-
Unnamed document-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
ATZ ESTRELLA-OngoingDec 2021Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 30 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ATZ AREVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmATZ AREVAOther 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: ATZ PROPERTIES

ATZ Properties has 2 registrations on RERA Karnataka, including ATZ ESTRELLA and ATZ AREVA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ATZ AREVA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ATZ AREVA?

The registered promoter entity is ATZ PROPERTIES, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ATZ AREVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ATZ AREVA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at ATZ AREVA?

The professionals named in the filing: Architect: ASLAM ARCHITECTS AND INTERIOR DESIGNERS PVT.LTD.; Engineer: MANOHAR CONSULTANTS, CIVIL AND STRUCTURAL ENGINEERS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATZ AREVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATZ AREVA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATZ AREVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.