Red flags
- 2 complaints at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Assetz Marq Building 3 - Tower 6 is a Residential/Group Housing project by Assetz Whitefield Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/201001/003626 on 1 Oct 2020. Possession is promised by 30 Sep 2024. 2 complaints are on record with the regulator.
At a glance
Project
- NameAssetz Marq Building 3 - Tower 6
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/201001/003626
- ReraGenie IDRG-KA-44130
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on1 Oct 2020
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 6 | - | - | - | 345 | 0 | 345 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 18 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Khan Global Engineering Consultants Private Limited |
| Engineer | Design Tree Service Consultants Pvt Ltd |
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01101/2025 | - | Assetz Whitefield Homes Private Limited | 29/08/2025 |
| 01144/2025 | - | Assetz Whitefield Homes Private Limited | 08/09/2025 |
Documents filed70
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/201001/003626 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Covering LetterFile: Covering Letter.pdf | 18 Sep 2020 |
| Annexure 1 -Fees ClarificationFile: Annexure 01 - Fee clarification.pdf | 18 Sep 2020 |
| Annexure 2 -Project Head DetailsFile: Annexure 02 Project Head Details.pdf | 18 Sep 2020 |
| Annexure 3 - Bank account PassbookFile: Annexure 03 Bank account passbook.pdf | 18 Sep 2020 |
| Annexure 5-Audited Financial Statement Last Three yearsFile: Annexure 05 Audited Financial statement for three years.pdf | 18 Sep 2020 |
| Annexure 6 -Sale DeedFile: Annexure 06 - Sale Deed.pdf | 18 Sep 2020 |
| Annexure 7- Project Land Owner DetailsFile: Annexure 07 -Land Owner Details.pdf | 18 Sep 2020 |
| Annexure 8 -Plan SanctionFile: Annexure 08 -Plan Sanction.pdf | 18 Sep 2020 |
| Annexure 9-Demarked Master PlanFile: Annexure 09 -Demarked Master Plan.pdf | 18 Sep 2020 |
| Annexure 10-KSPCB NOCFile: Annexure 10 -KSPCB NOC.pdf | 18 Sep 2020 |
| Annexure 11-BWSSB NOCFile: Annexure 11 - BWSSB NOC.pdf | 18 Sep 2020 |
| Annexure 12-Phasewise Registered Projects & Future Dev ProjectsFile: Annexure 12 -Phasewise Registered Projets & Future Dev Project.pdf | 18 Sep 2020 |
| CertificateFile: Annexure A-COI.pdf | - |
| Annexure 9A - Building 3 Order | - |
| Annexure 9B - Approved Building Plan | - |
| Annexure 16 - Proforma Sale deed | - |
| Annexure 10 - Marq 2B ATS 10 Sep 20 | - |
| Annexure 11 - Sale Deed | - |
| Annexure 12 - Section & Elevation | - |
| Annexure 13 - Approved DP Drawing | - |
| Annexure 14 - Proforma of allotment letter | - |
| Annexure 15 - Brochure | - |
| Annexure 17 - Spec and Amenities | - |
| Annexure 8 -EC | - |
| Annexure J - affidavit Vilotion | - |
| Annexure K - Joint Affidavit | - |
| Annexure 19 - Khatha of the entire project | - |
| Annexure 18 - JDA Assetz Whitefield | - |
| Annexure 20 - Conversion Order - Gazette Final | - |
| Annexure 31 - MARQ RELINQUISHMENT DEED | - |
| Annexure 21 - Marq - Fire NOC | - |
| Annexure 22 - Revised AAI | - |
| Annexure 23 - BESCOM NOC | - |
| Annexure 24 - BWSSB NOC | - |
| Annexure 25 - Addendum to KSPCB NOC | - |
| Annexure 26 - Marq MOEF NOC | - |
| Annexure 27 - Marq BSNL NOC 2_001 | - |
| Unnamed document | - |
| Annexure 29 - Sectional Drawings | - |
| Annexure 28 - Existing Section Plan | - |
| Annexure 30 - DSK Title Opinion | - |
| Balance Sheet 2018 - 2019File: Not yet Audited.pdf | - |
| Balance Sheet 2017 - 2018File: Annexure 1c-BS 18-19.pdf | - |
| Balance Sheet 2016 - 2017File: Annexure 1b-BS 17-18.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: Not yet Audited.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: Annexure 2c-P&L 18-19.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: Annexure 2b -P&L 17-18.pdf | - |
| Director's Report 2018 - 2019File: Not yet Audited.pdf | - |
| Director's Report 2017 - 2018File: Annexure 3c-DR 18-19.pdf | - |
| Director's Report 2016 - 2017File: Annexure 3b-DR 17-18.pdf | - |
| Cash Flow Statement 2018 - 2019File: Not yet Audited.pdf | - |
| Cash Flow Statement 2017 - 2018File: Annexure 4c CF 18-19.pdf | - |
| Auditor's Report 2018 - 2019File: Not yet Audited.pdf | - |
| Auditor's Report 2017 - 2018File: Annexure 5c-AR-18-19.pdf | - |
| Auditor's Report 2016 - 2017File: Annexure 5b -AR 17-18.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: Not yet Audited.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: Annexure 6c -ITR 18-19.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: Annexure 6b -ITR 17-18.pdf | - |
| Annexure G -Form B | - |
| Prospectus/BrochureFile: Annexure 1 -Brochure.pdf | - |
| Advertisement Copy 1File: Annexure 2 -Advertishment.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_201001_003626.xlsx | - |
| Loan raised documentFile: NOC Charge satisaction.pdf | - |
| Stability CertificateFile: Structural Stability.pdf | - |
| NOC issued by the Fire Force department after completion of workFile: FIRE CLEARANCE CERTIFICATE.pdf | - |
| Occupancy CertificateFile: Occupancy Certificate.pdf | - |
| Architect certificate for having completed the work(in format no 5)File: Architect Certificate.pdf | - |
| Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA - Marq 2 2.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf | - |
| Engineer CertificateFile: Engineer certificate.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz Marq Building 3 - Tower 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Assetz Whitefield Homes Private Limited
Assetz Whitefield Homes Private Limited has 4 registrations on RERA Karnataka, including Assetz Marq Phase 3B and Assetz Marq Building 2 - Tower 5. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz Marq Building 3 - Tower 6 is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Marq Building 3 - Tower 6?
The registered promoter entity is Assetz Whitefield Homes Private Limited, a company as per the filing. Its CIN U70109KA2012PTC063873 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Marq Building 3 - Tower 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Assetz Marq Building 3 - Tower 6?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Assetz Marq Building 3 - Tower 6?
The professionals named in the filing: Architect: Khan Global Engineering Consultants Private Limited; Engineer: Design Tree Service Consultants Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Marq Building 3 - Tower 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback