Registration approved Residential/Group Housing project

Assetz Marq Building 3 - Tower 6

By Assetz Whitefield Homes Private Limited

RG-KA-44130 · RERA PRM/KA/RERA/1251/446/PR/201001/003626 · Last updated on RERA Karnataka portal: 18 Sep 2020

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Sep 2024Possession promisedno revision filed
2Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

Assetz Marq Building 3 - Tower 6 is a Residential/Group Housing project by Assetz Whitefield Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/201001/003626 on 1 Oct 2020. Possession is promised by 30 Sep 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAssetz Marq Building 3 - Tower 6
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/201001/003626
  • ReraGenie IDRG-KA-44130

Builder

  • NameAssetz Whitefield Homes Private Limited
  • Entity typeCompany
  • CINU70109KA2012PTC063873
  • Authorized SignatoryAkshay Kishore Diwani
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2020PromisedSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Oct 2020
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 6---3450345

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 18 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,575 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 184.79 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKhan Global Engineering Consultants Private Limited
EngineerDesign Tree Service Consultants Pvt Ltd

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
01101/2025-Assetz Whitefield Homes Private Limited29/08/2025
01144/2025-Assetz Whitefield Homes Private Limited08/09/2025

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/201001/003626 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Covering LetterFile: Covering Letter.pdf18 Sep 2020
Annexure 1 -Fees ClarificationFile: Annexure 01 - Fee clarification.pdf18 Sep 2020
Annexure 2 -Project Head DetailsFile: Annexure 02 Project Head Details.pdf18 Sep 2020
Annexure 3 - Bank account PassbookFile: Annexure 03 Bank account passbook.pdf18 Sep 2020
Annexure 5-Audited Financial Statement Last Three yearsFile: Annexure 05 Audited Financial statement for three years.pdf18 Sep 2020
Annexure 6 -Sale DeedFile: Annexure 06 - Sale Deed.pdf18 Sep 2020
Annexure 7- Project Land Owner DetailsFile: Annexure 07 -Land Owner Details.pdf18 Sep 2020
Annexure 8 -Plan SanctionFile: Annexure 08 -Plan Sanction.pdf18 Sep 2020
Annexure 9-Demarked Master PlanFile: Annexure 09 -Demarked Master Plan.pdf18 Sep 2020
Annexure 10-KSPCB NOCFile: Annexure 10 -KSPCB NOC.pdf18 Sep 2020
Annexure 11-BWSSB NOCFile: Annexure 11 - BWSSB NOC.pdf18 Sep 2020
Annexure 12-Phasewise Registered Projects & Future Dev ProjectsFile: Annexure 12 -Phasewise Registered Projets & Future Dev Project.pdf18 Sep 2020
CertificateFile: Annexure A-COI.pdf-
Annexure 9A - Building 3 Order-
Annexure 9B - Approved Building Plan-
Annexure 16 - Proforma Sale deed-
Annexure 10 - Marq 2B ATS 10 Sep 20-
Annexure 11 - Sale Deed-
Annexure 12 - Section & Elevation-
Annexure 13 - Approved DP Drawing-
Annexure 14 - Proforma of allotment letter-
Annexure 15 - Brochure-
Annexure 17 - Spec and Amenities-
Annexure 8 -EC-
Annexure J - affidavit Vilotion-
Annexure K - Joint Affidavit-
Annexure 19 - Khatha of the entire project-
Annexure 18 - JDA Assetz Whitefield-
Annexure 20 - Conversion Order - Gazette Final-
Annexure 31 - MARQ RELINQUISHMENT DEED-
Annexure 21 - Marq - Fire NOC-
Annexure 22 - Revised AAI-
Annexure 23 - BESCOM NOC-
Annexure 24 - BWSSB NOC-
Annexure 25 - Addendum to KSPCB NOC-
Annexure 26 - Marq MOEF NOC-
Annexure 27 - Marq BSNL NOC 2_001-
Unnamed document-
Annexure 29 - Sectional Drawings-
Annexure 28 - Existing Section Plan-
Annexure 30 - DSK Title Opinion-
Balance Sheet 2018 - 2019File: Not yet Audited.pdf-
Balance Sheet 2017 - 2018File: Annexure 1c-BS 18-19.pdf-
Balance Sheet 2016 - 2017File: Annexure 1b-BS 17-18.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Not yet Audited.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Annexure 2c-P&L 18-19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Annexure 2b -P&L 17-18.pdf-
Director's Report 2018 - 2019File: Not yet Audited.pdf-
Director's Report 2017 - 2018File: Annexure 3c-DR 18-19.pdf-
Director's Report 2016 - 2017File: Annexure 3b-DR 17-18.pdf-
Cash Flow Statement 2018 - 2019File: Not yet Audited.pdf-
Cash Flow Statement 2017 - 2018File: Annexure 4c CF 18-19.pdf-
Auditor's Report 2018 - 2019File: Not yet Audited.pdf-
Auditor's Report 2017 - 2018File: Annexure 5c-AR-18-19.pdf-
Auditor's Report 2016 - 2017File: Annexure 5b -AR 17-18.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Not yet Audited.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Annexure 6c -ITR 18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Annexure 6b -ITR 17-18.pdf-
Annexure G -Form B-
Prospectus/BrochureFile: Annexure 1 -Brochure.pdf-
Advertisement Copy 1File: Annexure 2 -Advertishment.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_201001_003626.xlsx-
Loan raised documentFile: NOC Charge satisaction.pdf-
Stability CertificateFile: Structural Stability.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE CLEARANCE CERTIFICATE.pdf-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA - Marq 2 2.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit.pdf-
Engineer CertificateFile: Engineer certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Assetz Marq Building 3 - Tower 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAssetz Marq Building 3 -Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: Assetz Whitefield Homes Private Limited

Assetz Whitefield Homes Private Limited has 4 registrations on RERA Karnataka, including Assetz Marq Phase 3B and Assetz Marq Building 2 - Tower 5. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Assetz Marq Building 3 - Tower 6 is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Assetz Marq Building 3 - Tower 6?

The registered promoter entity is Assetz Whitefield Homes Private Limited, a company as per the filing. Its CIN U70109KA2012PTC063873 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Assetz Marq Building 3 - Tower 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Assetz Marq Building 3 - Tower 6?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Assetz Marq Building 3 - Tower 6?

The professionals named in the filing: Architect: Khan Global Engineering Consultants Private Limited; Engineer: Design Tree Service Consultants Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Assetz Marq Building 3 - Tower 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Assetz Marq Building 3 - Tower 6. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Assetz Marq Building 3 - Tower 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.