Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Ashish Green is a Residential/Group Housing project by Aashish Developer and Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180130/002243 on 30 Jan 2018. Possession is promised by 30 Sep 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameAshish Green
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/180130/002243
  • ReraGenie IDRG-KA-65023

Builder

  • NameAashish Developer and Builders
  • Entity typePartnership Firm
  • Authorized SignatoryManish Amarnath Garg
  • Other registrations5 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2018First promiseDec 2020Revised toSep 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Jan 2018
  • Promised completion30 Sep 2021
  • Revised completionRevised to 30 Sep 2021 (originally 31 Dec 2020)
  • Buildings1 building record
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-A---72072

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,388 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.97 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVasant kumar associates
EngineerManohar consultants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2020 → Sep 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180130/002243 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Gst Certificate.pdf-
CC -
CC -
Site Plan-
RERA-Phased Project Sale Deed-
RERA-ATS-Phased development__Aashsih_20171011-
Sale deed -
Plan Typical 1st, 2nd, 3rd floor-
Survey Sketch Govt-
Application for Allotment-
ASHISH GREEN - Brochure-min-
Pollotion Control Board-
Project specification-
EC from 3-10-2017 to 20-11-2017-
Khatha -
Conversion Copy-
Conversion Copy-
Pollotion Control Board-
Unnamed document-
Site Plan-
Plan Basement floor (2)-
Site Plan-
Legal Report-
Balance Sheet 2016 - 2017File: Balance Sheet 2016-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2014-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Trading Profit & Loss Account 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Trading Profit & Loass account 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Trading Profit & Loss Account 2014-15.pdf-
Director's Report 2016 - 2017File: Audit Report 2016-17.pdf-
Director's Report 2015 - 2016File: Audit Report 2015-16.pdf-
Director's Report 2014 - 2015File: Audit Report 2014-15.pdf-
Cash Flow Statement 2016 - 2017File: Balance Sheet 2016-17.pdf-
Cash Flow Statement 2015 - 2016File: Balance Sheet 2015-16.pdf-
Auditor's Report 2016 - 2017File: Audit Report 2016-17.pdf-
Auditor's Report 2015 - 2016File: Audit Report 2015-16.pdf-
Auditor's Report 2014 - 2015File: Audit Report 2014-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income tax Ack Copy 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Ack Copy 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Income Tax Ack Copy 2014-15.pdf-
FORM-B-
Prospectus/BrochureFile: ASISH GREEN-BROUCHER.pdf-
Advertisement Copy 1File: Market add.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180130_002243.xlsx-
Occupancy CertificateFile: OC.pdf-
Completion certificate issued by the competent authorityFile: OC.pdf-
Registered Agreement of SaleFile: Sale Agreement AG.pdf-
Registered conveyance deed for an individual unitFile: Sale deed.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Ashish Green on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Aashish Developer and Builders

Aashish Developer and Builders has 6 registrations on RERA Karnataka, including Ashish Green and ASHISH GREEN B-BLOCK. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Ashish Green is delayed beyond 30 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Ashish Green?

The registered promoter entity is Aashish Developer and Builders, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Ashish Green?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Ashish Green?

The professionals named in the filing: Architect: Vasant kumar associates; Engineer: Manohar consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashish Green?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashish Green. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashish Green to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.