Home / Browse projects / Bengaluru Urban, Karnataka / ANAND ALPINE
ANAND ALPINE
By ANAND GROUP
RG-KA-01630 · RERA PRM/KA/RERA/1251/310/PR/190531/002592
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
ANAND ALPINE is a Residential/Group Housing project by ANAND GROUP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190531/002592 on 31 May 2019. Possession is promised by 15 Dec 2024. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameANAND ALPINE
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/190531/002592
- ReraGenie IDRG-KA-01630
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on31 May 2019
- Promised completion15 Dec 2024
- Revised completionRevised to 15 Dec 2024 (originally 15 Mar 2024)
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANAND ALPINE | - | - | - | 179 | 0 | 179 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ADITHYA.G. KASHYAP |
| Engineer | PRAVEEN KUMAR GURBALA |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed84
As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190531/002592 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: Firm & Authorization Certificate.pdf | - |
| Already registered project ongoing detailsFile: ANAND ALPINE - RERA CERTIFICATE.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: BBMP Online Licence.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: NO CHANGES.pdf | - |
| List Of AllotteesFile: List Of Allottees.pdf | - |
| List Of ComplaintsFile: List Of Complaints.pdf | - |
| Consent LetterFile: Allotties Consent Letters.pdf | - |
| List Of Pending LitigationsFile: List Of Pending Litigations.pdf | - |
| Chartered Accountant CertificateFile: Form -4 Chartered Accountant.pdf | - |
| Notarized AffidavitFile: Affidavit.pdf | - |
| Engineer CertificateFile: Form- 6 Engineer Certificate.pdf | - |
| Architect CertificateFile: Form 5 Architect's Certificate.pdf | - |
| Structural Engineer Certificate for stability of structureFile: Strl Stability Certificate.pdf | - |
| Modification of Plan DetailsFile: SITE PLAN.PDF | - |
| Modification of Plan DetailsFile: BBMP online Drawings.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Modification of Plan DetailsFile: Total units, sold and unsold details.pdf | - |
| Modification of Plan DetailsFile: Total units, sold and unsold details.pdf | - |
| Land owner Consent LetterFile: Land owner Consent Letter.pdf | - |
| Plan approval Letter | - |
| All floor Plans | - |
| UPLOAD LATER | - |
| UPLOAD LATER | - |
| Sale deed_ All | - |
| Section & Elevation | - |
| Area CDP Plan | - |
| UPLOAD LATER | - |
| Project Specification sheet | - |
| All ECs | - |
| Anand Group ( AFFIDAVET FOR PROJECT ANAND ALPINE) - Copy | - |
| JDA - Affidavit | - |
| Khatha | - |
| JDA & Sharing agreement | - |
| Land Docs_MR_AKB_Tippany_katha | - |
| A Conversion order of our Project Anand Alpine | - |
| Fire Emergency | - |
| Airportauthority | - |
| BESCOM | - |
| BWSSB | - |
| KSPCB | - |
| Sate environmental | - |
| BSNL | - |
| Unnamed document | - |
| Section & Elevation | - |
| All floor Plans | - |
| Section & Elevation | - |
| Khatha | - |
| Balance Sheet 2017 - 2018File: BS PL ITR of 2017 18.pdf | - |
| Balance Sheet 2016 - 2017File: BS PL ITR of 2016 17.pdf | - |
| Balance Sheet 2015 - 2016File: BS PL ITR of 2015 16.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: BS PL ITR of 2017 18.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: BS PL ITR of 2016 17.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: BS PL ITR of 2015 16.pdf | - |
| Director's Report 2017 - 2018File: Undetaking from CA on Directors Report.pdf | - |
| Director's Report 2016 - 2017File: Undetaking from CA on Directors Report.pdf | - |
| Director's Report 2015 - 2016File: Undetaking from CA on Directors Report.pdf | - |
| Cash Flow Statement 2017 - 2018File: Undetaking from CA on Cash Flow.pdf | - |
| Cash Flow Statement 2016 - 2017File: Undetaking from CA on Cash Flow.pdf | - |
| Auditor's Report 2017 - 2018File: BS PL ITR of 2017 18.pdf | - |
| Auditor's Report 2016 - 2017File: BS PL ITR of 2016 17.pdf | - |
| Auditor's Report 2015 - 2016File: BS PL ITR of 2015 16.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: BS PL ITR of 2017 18.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: BS PL ITR of 2016 17.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: BS PL ITR of 2015 16.pdf | - |
| Form B | - |
| Prospectus/BrochureFile: Brochure ANAND GROUP.pdf | - |
| Advertisement Copy 1File: ADVERTISEMENT COPY ANAND GROUP.jpg | - |
| Tower Excel SheetFile: PRMKARERA1251310PR190531002592.xlsx | - |
| Loan raised documentFile: Un-secured Loan.pdf | - |
| Stability CertificateFile: stability certificate.pdf | - |
| Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: BWSSB Receipt.pdf | - |
| NOC issued by the Fire Force department after completion of workFile: Fire force.pdf | - |
| Consent for operation issued by KSPCBFile: CFO COPY.pdf | - |
| Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Anand Alpine Lift License.pdf | - |
| Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM Power Sanction letter - ANAND ALPINE.pdf | - |
| Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB Water Connection - Anand Alpine.pdf | - |
| Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Architecture work Completion certificate.pdf | - |
| Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Association not formed.pdf | - |
| Details of undivided share of land handed over to the association of allotteesFile: Association not formed.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ANAND ALPINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 30 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ANAND GROUP
ANAND GROUP has 2 registrations on RERA Karnataka, including ANAND SOMU AARUSH and ANAND ALPINE. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ANAND ALPINE is delayed beyond 15 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ANAND ALPINE?
The registered promoter entity is ANAND GROUP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ANAND ALPINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ANAND ALPINE?
The professionals named in the filing: Architect: ADITHYA.G. KASHYAP; Engineer: PRAVEEN KUMAR GURBALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANAND ALPINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback