Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2025Possession promisedmoved 33 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

Amrutha Platinum Towers is a Residential/Group Housing project by Amrutha Rama Constructions Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180420/001525 on 20 Apr 2018. Possession is promised by 30 Sep 2025. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameAmrutha Platinum Towers
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/180420/001525
  • ReraGenie IDRG-KA-64465

Builder

  • NameAmrutha Rama Constructions Pvt Ltd
  • Entity typeCompany
  • CINU45400TG2015PTC099475
  • Authorized SignatoryB.Madhusudhan Rao

Key dates

this monthRegisteredApr 2018First promiseDec 2022Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Apr 2018
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---2380238
B---1600160

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,016 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2022 → not stated

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/231116/001525not stated → Sep 2024

Reason as filed by the promoterApplied for modification; Applied for modification

ExtensionSep 2024 → Sep 2025

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180420/001525 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Amrutha reg.pdf-
Project Details-
Already registered project ongoing detailsFile: Already registered project ongoing details.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: BBMP Modified Plan Approval_compressed.pdf-
List Of AllotteesFile: New Sold.pdf-
Consent LetterFile: Conce lett (1) (1).pdf-
Chartered Accountant CertificateFile: Form 4 RERA CA Certificate(QU)-FY23-24 Q3(Modified)_0001.pdf-
Notarized AffidavitFile: Affidavit MP.pdf-
Engineer CertificateFile: Form 6.pdf-
Architect CertificateFile: Form 5.pdf-
Structural Engineer Certificate for stability of structureFile: Structural Engineer Certificate for stability of structure.pdf-
Modification of Plan DetailsFile: Amu plan.pdf-
Modification of Plan DetailsFile: Modified Approved Plan.pdf-
Modification of Plan DetailsFile: Clarification for commencement certificate_compressed.pdf-
Modification of Plan DetailsFile: Old Sold & Unsold_compressed_compressed.pdf-
Modification of Plan DetailsFile: New Sold Unsold_compressed.pdf-
Document 1File: KSPCB-NOC.pdf-
Concent Letter Set oneFile: Conce lett (1)-1-50.pdf-
Concent Letter Set TwoFile: Conce lett (1)-51-116.pdf-
TDR DocsFile: TDR 1.pdf-
TDR DocsFile: TDR 2.pdf-
TDR DocsFile: TDR 3.pdf-
TDR DocsFile: TDR 4.pdf-
TDR DocsFile: TDR 5.pdf-
TDR DocsFile: TDR 6.pdf-
TDR DocsFile: TDR 7.pdf-
Architect Certificate for Work Completion Schedule till DateFile: FORM 1_0001.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: FORM 5_0001.pdf-
CA Certificate for Funds UtilizationFile: FORM 3_0001.pdf-
Architect Certificate for Pending Work Completion Schedule.File: FORM 2_0001.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: FORM 7 _0001_compressed.pdf-
CA Certificate for Funds required for Project CompletionFile: FORM 4_0001.pdf-
AffidavitFile: FORM B _0001_compressed.pdf-
Latest Encumbrance CertificateFile: EC Latest.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letters a.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and Unsold Units List-Amrutha Platinum Towers.pdf-
Amu plan-
Amu rama sale deed-
Amu plan-
Amrutha EC-
Amrutha katha-
amu convr-
Amu plan-
Amu plan-
Form B Rama-
Prospectus/BrochureFile: APT BROCHURE.pdf-
Advertisement Copy 1File: APT BROCHURE.pdf-
Tower Excel SheetFile: PRMKARERA1251446PR180420001525.xlsx-
Loan raised documentFile: FINENQ_StatementOfAccount 40000000000025.pdf-
Occupancy CertificateFile: OC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit Amrutha Platinum Towers.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 33 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Amrutha Platinum Towers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Amrutha Rama Constructions Pvt Ltd

Amrutha Rama Constructions Pvt Ltd has 1 registration on RERA Karnataka, including Amrutha Platinum Towers. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Amrutha Platinum Towers is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Amrutha Platinum Towers?

The registered promoter entity is Amrutha Rama Constructions Pvt Ltd, a company as per the filing. Its CIN U45400TG2015PTC099475 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Amrutha Platinum Towers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Amrutha Platinum Towers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amrutha Platinum Towers. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amrutha Platinum Towers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.