AMRUTHA HEIGHTS - PHASE II is a Residential/Group Housing project by AMRUTHA SHELTERS PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200113/003151 on 13 Jan 2020. Possession is promised by 30 Sep 2025. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameAMRUTHA HEIGHTS - PHASE II
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/200113/003151
- ReraGenie IDRG-KA-17280
Builder
- NameAMRUTHA SHELTERS PVT LTD
- Entity typeCompany
- CINU45200AP2012PTC084716
- Authorized SignatoryB.Madhusudhan Rao
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Jan 2020
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2024)
- Buildings3 building records
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | - | - | - | 72 | 0 | 72 |
| Tower B | - | - | - | 72 | 0 | 72 |
| Tower C | - | - | - | 72 | 0 | 72 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 7 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 7 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASLAM ARCHITECTS |
| Engineer | Munish Sharma |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed67
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200113/003151 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Demarked plan copy for Phase 2 (Block B) Basement PlanFile: Demarked Plase 2-Floor Plan -Block- B.pdf | 7 Jan 2020 |
| Demarked plan copy for Phase 2 (Block B) Floor PlanFile: Demarked Plase 2-Floor Plan -Block- B.pdf | 7 Jan 2020 |
| Modified plan for both projects ( Block A and Block B)- Basement PlanFile: Modified-Plan-Basement.pdf | 7 Jan 2020 |
| Modified plan for both projects ( Block A and Block B)-Floor PlanFile: Modified-Plan-Floor.pdf | 7 Jan 2020 |
| Architect Certificate for site area for Block A and Block BFile: Architect-Ltr-for area seperation for both projects.pdf | 7 Jan 2020 |
| Fire NOC Clarification and Acknowledgement letterFile: Fire NOC Clarification.pdf | 7 Jan 2020 |
| Modified site plan for Black A and Block BFile: Modified-plan-Site.pdf | 7 Jan 2020 |
| Demarked site plan for Block B ( Amrutha heights Phase 2)File: Site-Plan-Block B.pdf | 7 Jan 2020 |
| Details for Fees Clarification attachedFile: Fees-Clarification.pdf | 2 Jan 2020 |
| Audited Balance sheet FY 18-19File: BSht-18-19.pdf | 2 Jan 2020 |
| Audited P/L FY 18-19File: PL-18-19.pdf | 2 Jan 2020 |
| Audited Cash Flow statement FY 18-19File: Cash-flow-18-19.pdf | 2 Jan 2020 |
| Previous Project Fees CopyFile: Challn-for-FEES-last-prjct.pdf | 2 Jan 2020 |
| Plan Licence Letter copyFile: Plan-Fees-BBMP.pdf | 2 Jan 2020 |
| Clarification on C CFile: CC-Clarification.pdf | 2 Jan 2020 |
| NOC- BSNL copyFile: NOC-BSNL.pdf | 2 Jan 2020 |
| NOC- BESCOM copyFile: NOC-Bescom.pdf | 2 Jan 2020 |
| NOC - Airport Authority copyFile: NOC-Airport.pdf | 2 Jan 2020 |
| NOC - BWSSB - CopyFile: NOC-BWSSB.pdf | 2 Jan 2020 |
| NOC - PCB - CopyFile: NOC-PCB.pdf | 2 Jan 2020 |
| NOC - State LVL EnvoirnmentFile: NOC-St-Lvl-Envoirnment.pdf | 2 Jan 2020 |
| Khatha Abstarct copy - CombinedFile: Khatha-amalg-hgts-2.pdf | 2 Jan 2020 |
| Title Deed (Partition Deed) for Sy. No. 1/5(JD Land)File: Mother deed for JD land.pdf | 2 Jan 2020 |
| E C for 15 yearsFile: EC-Latest-15YRS.pdf | 2 Jan 2020 |
| Building licence / plan letterFile: Plan-Fees-BBMP.pdf | 2 Jan 2020 |
| De-marked Architecture plans for 6029 Sq. MTrsFile: Architect-plan-4-Site Plan.pdf | 2 Jan 2020 |
| Architecture Plans for BasementFile: Archtect-Plan-1-Basement.pdf | 2 Jan 2020 |
| Architecture Plans Ground FloorFile: Architect-plan-5-Groun Floor.pdf | 2 Jan 2020 |
| Architecture Plans Floue PlanFile: Archtect-plan-3-Floor plan.pdf | 2 Jan 2020 |
| Architecture Plans ElevationFile: Archtect-plan-2-Elevation.pdf | 2 Jan 2020 |
| Architect PlansFile: Archtect-Plan-1.pdf | 23 Dec 2019 |
| Architect PlansFile: Archtect-plan-2.pdf | 23 Dec 2019 |
| Architect PlansFile: Archtect-plan-3.pdf | 23 Dec 2019 |
| Architects PlansFile: Architect-plan-4.pdf | 23 Dec 2019 |
| Architects PlansFile: Architect-plan-5.pdf | 23 Dec 2019 |
| CertificateFile: ASPL-Cer.pdf | - |
| Approved plan | - |
| Sale deed and RTC | - |
| Arc Plan | - |
| Arc Plan | - |
| E C Application | - |
| Khataha-Amlgn-Hgts2 | - |
| JDA 26-06-2019 | - |
| Conversion order_compressed (1) | - |
| Balance Sheet 2018 - 2019File: B-Sheet-2019.pdf | - |
| Balance Sheet 2017 - 2018File: B -Sheet-2018.pdf | - |
| Balance Sheet 2016 - 2017File: B-Sheet-2017.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P&L-2019.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: P&L-2018.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P&L-2017.pdf | - |
| Director's Report 2018 - 2019File: D-Rprt-18-19_compressed.pdf | - |
| Director's Report 2017 - 2018File: D-Rprt-17-18_compressed.pdf | - |
| Director's Report 2016 - 2017File: D-Rprt-16-17_compressed.pdf | - |
| Cash Flow Statement 2017 - 2018File: Cash-Flow-stmnt-18.pdf | - |
| Auditor's Report 2018 - 2019File: Adt Rprt-18-19_compressed.pdf | - |
| Auditor's Report 2017 - 2018File: Adt Rprt-17-18_compressed.pdf | - |
| Auditor's Report 2016 - 2017File: Adt Rprt-16-17_compressed.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ITR-19-20.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: ITR-18-19.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: ITR-17-18.pdf | - |
| Form-B_compressed | - |
| Prospectus/BrochureFile: Heights Phase - II - Brochure.pdf | - |
| Advertisement Copy 1File: Heights Phase - II - Brochure.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_200113_003151.xlsx | - |
| Loan raised documentFile: SOA 400000000102-50cr-AMSTRS.pdf | - |
| Occupancy CertificateFile: OC phase 2.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit Amrutha Heights Phase-II.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AMRUTHA HEIGHTS - PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: AMRUTHA SHELTERS PVT LTD
AMRUTHA SHELTERS PVT LTD has 1 registration on RERA Karnataka, including AMRUTHA HEIGHTS - PHASE II. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AMRUTHA HEIGHTS - PHASE II is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AMRUTHA HEIGHTS - PHASE II?
The registered promoter entity is AMRUTHA SHELTERS PVT LTD, a company as per the filing. Its CIN U45200AP2012PTC084716 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AMRUTHA HEIGHTS - PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AMRUTHA HEIGHTS - PHASE II?
The professionals named in the filing: Architect: ASLAM ARCHITECTS; Engineer: Munish Sharma. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMRUTHA HEIGHTS - PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback