ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / AMITHA WISDOM HOMES

Registration approved Residential/Group Housing project

AMITHA WISDOM HOMES

By CADABAMS SENIOR DWELLING LLP

RG-KA-82053 · RERA PRM/KA/RERA/1251/310/PR/190410/002522

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2024Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 41 documents Report an error

AMITHA WISDOM HOMES is a Residential/Group Housing project by CADABAMS SENIOR DWELLING LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190410/002522 on 10 Apr 2019. Possession is promised by 31 Dec 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameAMITHA WISDOM HOMES
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/190410/002522
  • ReraGenie IDRG-KA-82053

Builder

  • NameCADABAMS SENIOR DWELLING LLP
  • Entity typePartnership Firm
  • Authorized SignatoryCADABAM M RAMESH
  • Board MemberSUDHA R CADABAM

Key dates

this monthRegisteredApr 2019First promiseMar 2024Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Apr 2019
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 31 Mar 2024)
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMITHA WISDOM HOMES---1420142

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,260 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 40.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKHAN ENGINEERING CONSULTANCY PVT LTD
EngineerKHAN ENGINEERING CONSULTANCY PVT LTD

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2024 → Dec 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190410/002522 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: LLP Certificate of LLP Incorporation Cadabams Senior Dwelling LLP.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form-EX1_20230429_0001.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form-Ex5_20230429_0001.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate .pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form-EX2_20230429_0001.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form-Ex6_20230429_0001.pdf-
CA Certificate for Funds required for Project CompletionFile: 20230502_CSDLLP_RERAFormEx-4.pdf-
AffidavitFile: Form_B_RERA_Extension.pdf-
Latest Encumbrance CertificateFile: EC_22-23_latest.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
bmrda commencement certificate-
APPROVED PLAN 1-
APPROVED PLAN 2-
AWH SALE DEED -
ATS Agreement of sale -
SALE DEED-
APPROVED PLAN 3-
APPROVED PLAN 4-
Allotment letter amitha wisdom homes -
Brochure-
Amitha Wisdom homes Project specification-
EC 110-
Affidivat-
KHATHA-
LLP CADABAMS SENIOR DWELLING LLP -
RTC-
CONVERSION DOCU-
fire noc -
airport noc-
BESCOM NOC-
bwssb local noc-
kspcb noc-
bsnl noc-
APPROVED PLAN 1-
APPROVED PLAN 1-
Amitha Wisdom homes Project specification-
CONVERSION DOCU-
FORM B RAMESH CADABAMS187-
Prospectus/BrochureFile: Wisdom Home Brochure web (1).pdf-
Advertisement Copy 1File: Amitha Wisdom HOmes Advertisement Brouchre.pdf-
Tower Excel SheetFile: Building Details PRM_KA_RERA_1251_310_PR_190410_002522 (1).xls-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep AMITHA WISDOM HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: CADABAMS SENIOR DWELLING LLP

CADABAMS SENIOR DWELLING LLP has 1 registration on RERA Karnataka, including AMITHA WISDOM HOMES. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if AMITHA WISDOM HOMES is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of AMITHA WISDOM HOMES?

The registered promoter entity is CADABAMS SENIOR DWELLING LLP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in AMITHA WISDOM HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AMITHA WISDOM HOMES?

The professionals named in the filing: Architect: KHAN ENGINEERING CONSULTANCY PVT LTD; Engineer: KHAN ENGINEERING CONSULTANCY PVT LTD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMITHA WISDOM HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMITHA WISDOM HOMES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMITHA WISDOM HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.