Home / Browse projects / Thane, Maharashtra / AMAKIN MOHAMMADIYA COMPLEX PHASE III

Completed No litigation declared Residential / Group Housing project

AMAKIN MOHAMMADIYA COMPLEX PHASE III

By RAJ CORPORATION

RG-MH-94310 · RERA P51700010706 · Last updated on MahaRERA portal: 6 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 65%
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

AMAKIN MOHAMMADIYA COMPLEX PHASE III is a Residential / Group Housing project by RAJ CORPORATION in Thane, Maharashtra, registered with MahaRERA as P51700010706 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameAMAKIN MOHAMMADIYA COMPLEX PHASE III
  • TypeResidential / Group Housing
  • Location
    • Vikas Naka
    • Kachore Village
    • KACHORE
    • Kalyan
    • Thane
    • 421304
  • Pincode421304
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010706
  • ReraGenie IDRG-MH-94310

Builder

  • NameRAJ CORPORATION
  • Entity typePartnership
  • Partnerskiran Dilipkumar Parekh, Dilip Himmatlal parekh
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed118 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A5 HUSAMI BNA380000
B3 NOORANI ANA350000
B4 NOORANI BNA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

A5 HUSAMI B40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.12%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B3 NOORANI A37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B4 NOORANI B37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered52
Open Space65
BuildingClosed/CoveredOpen SpaceTotal
A5 HUSAMI B224062
B3 NOORANI A151025
B4 NOORANI B151530

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,711 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AMAKIN MOHAMMEDIYAH PRIVATE LIMITEDMumbai CityMumbai City

Approvals and building plan

Permissible FSI62041.83
Proposed, not sanctioned19,568 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch111 SANJY BUILDING JAWAHAR NAGAR GOREGAON WEST MUMBAI 400062

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Uday r Satavalekar
EngineerMadhav chikodi and asso
PartnerRole in project
RAJ CORPORATION-

Litigation declared3

CaseCourtStatus
FA782/14/2014BOMBAY HIGH COURTPENDING
RCC267/14/2014KALYAN COURTPENDING
RCS123/2013/2013KALYAN COURTFINAL ORDER

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Apr 2023

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: OC LAYOUT PLAN01.PDF6 Apr 2023
Layout approvalFile: OC LAYOUT PLAN02.PDF6 Apr 2023
Layout approvalFile: OC LAYOUT PLAN03.PDF6 Apr 2023
Layout approvalFile: OC LAYOUT PLAN04.pdf6 Apr 2023
Copy of Layout Approval (in case of layout)File: OC LAYOUT PLAN01.PDF6 Apr 2023
Copy of Layout Approval (in case of layout)File: OC LAYOUT PLAN02.PDF6 Apr 2023
Copy of Layout Approval (in case of layout)File: OC LAYOUT PLAN03.PDF6 Apr 2023
Copy of Layout Approval (in case of layout)File: OC LAYOUT PLAN04.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf6 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf6 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf6 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Noorani Society Registration Number.pdf4 Jan 2023
Certificates of CA (Form 5)File: CA CERTIFICATE (FORM 5).pdf1 Nov 2022
Layout approvalFile: OC COPY.pdf16 Jul 2022
Layout approvalFile: OC PLAN 01.pdf16 Jul 2022
Layout approvalFile: OC PLAN 02.pdf16 Jul 2022
Layout approvalFile: OC PLAN 03.pdf16 Jul 2022
Layout approvalFile: OC PLAN 04.pdf16 Jul 2022
Layout approvalFile: OC COPY 1ST TO 14TH FLOOR.pdf16 Jul 2022
Layout approvalFile: OC PLAN-001 GR TO 14TH FLOOR.pdf16 Jul 2022
Layout approvalFile: OC PLAN-002 GR TO 14TH FLOOR.pdf16 Jul 2022
Layout approvalFile: OC PLAN-003 GR TO 14TH FLOOR.pdf16 Jul 2022
Layout approvalFile: OC PLAN-004 GR TO 14TH FLOOR.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC COPY.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN 01.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN 02.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN 03.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN 04.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC COPY 1ST TO 14TH FLOOR.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN-001 GR TO 14TH FLOOR.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN-002 GR TO 14TH FLOOR.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN-003 GR TO 14TH FLOOR.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: OC PLAN-004 GR TO 14TH FLOOR.pdf16 Jul 2022
Certificates of CA (Form 3)File: Form 3_compressed_compressed.pdf16 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICTE.pdf5 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf5 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERTIFICATE.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GNR CINSULTANT.pdf15 Mar 2022
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf15 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form1).pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate (Form 2).pdf1 Sep 2021
Certificates of CA (Form 3)File: CA Certificate (Form 3).pdf1 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.pdf26 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf26 May 2021
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3.pdf26 May 2021
Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf2 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTURAL FORM 1.pdf31 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FORM 2.pdf31 Oct 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Husami Society Registration Certificate.pdf12 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT.pdf9 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER.pdf9 Feb 2020
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf9 Feb 2020
Certificates of CA (Form 3)File: CA Certificate Form 3.pdf20 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A5 HUSAMI OCCUPANCY CERTIFICATE.pdf20 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf17 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf17 Jun 2019
Certificates of CA (Form 3)File: CA CERTIFICATE Form 3.pdf17 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf20 May 2019
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3.pdf20 May 2019
Certificates of Architect (Form 4)File: Architec Certificate FORM 4.pdf20 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECTS.pdf2 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf2 Feb 2019
Certificates of CA (Form 3)File: CERTIFICATE OF CA FORM 3.pdf2 Feb 2019
Certificates of CA (Form 5)File: Certificates of CA (Form 5).pdf30 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf (1).pdf25 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf.pdf25 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf (2).pdf25 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf (3).pdf25 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf (4).pdf25 Oct 2018
Certificates of CA (Form 3)File: jpg-to-pdf (5).pdf25 Oct 2018
Certificates of CA (Form 3)File: CA CERTIFICATE DT SEP 2018 (2).pdf25 Oct 2018
OtherFile: Amakin_Declaration_Raj Application.pdf1 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC COPY 2017.pdf31 Mar 2018
Layout approvalFile: LAYOUT PLAN.pdf30 Mar 2018
Building plan approvalFile: CC PLAN 3 OF 8.pdf30 Mar 2018
Building plan approvalFile: CC PLAN 2 OF 8.pdf30 Mar 2018
Building plan approvalFile: CC PLAN 4 OF 8.pdf30 Mar 2018
Building plan approvalFile: CC PLAN 5 OF 8.pdf30 Mar 2018
Building plan approvalFile: cc plan 6 of 8.pdf30 Mar 2018
Building plan approvalFile: cc plan 7 of 8.pdf30 Mar 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NAJMI APPARTMENTAMAKIN MOHAMMADIYA COMPLEX PHASE II BHOHIR WADI ASADE VILLAGE46CompletedJan 2012Late, May 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMAKIN MOHAMMADIYA COMPLEX PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kachore Village7,600+ in Thane

2 kmAMAKIN MOHAMMADIYA COMPLCompleted 40Lapsed / revoked 28Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: RAJ CORPORATION

RAJ CORPORATION has 5 registrations on MahaRERA, including RAJ OAKS and AMAKIN MOHAMMADIYA COMPLEX PHASE III. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AMAKIN MOHAMMADIYA COMPLEX PHASE III is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMAKIN MOHAMMADIYA COMPLEX PHASE III?

The registered promoter entity is RAJ CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMAKIN MOHAMMADIYA COMPLEX PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMAKIN MOHAMMADIYA COMPLEX PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMAKIN MOHAMMADIYA COMPLEX PHASE III?

The professionals named in the filing: Architect: Ar. Uday r Satavalekar; Engineer: Madhav chikodi and asso. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMAKIN MOHAMMADIYA COMPLEX PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMAKIN MOHAMMADIYA COMPLEX PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMAKIN MOHAMMADIYA COMPLEX PHASE III to a free account