Home / Browse projects / Bengaluru Urban, Karnataka / Allure Avani Phase I
Allure Avani Phase I
By Allure Awani Private Limited
RG-KA-22794 · RERA PRM/KA/RERA/1251/446/PR/050824/006959 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Allure Avani Phase I is a Residential/Group Housing project by Allure Awani Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/050824/006959 on 5 Aug 2024. Possession is promised by 8 May 2028. 48 of the 138 units on this registration are recorded sold or booked, and 8 of 16 construction stages are filed complete.
At a glance
Project
- NameAllure Avani Phase I
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/050824/006959
- ReraGenie IDRG-KA-22794
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Aug 2024
- Promised completion8 May 2028
- Revised completionNone
- Buildings1 building record
- Documents filed220 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 138 | 0 | 138 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 16 construction stages are filed complete. The stage furthest along is Weather Proof work(tile, at 65%.
Building: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 5% |
| Basic work of Water supply, Sanitary and Electrification | 45% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 45% |
| Painting | 20% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 65% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 40% |
| Internal and External work including landscapes as per sanctioned drawings | 30% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 60% |
| Sewage and Drainage System | Yes | 60% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 80% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 75% |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | Yes | 80% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 60% |
| Parks & Tree planting | Yes | 20% |
| Street Lighting | Yes | 25% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 8% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Chikkavenkatamma D/O Late Narayanappa | - | - |
| Sunil Kumar V S/O Venkatappa N | - | - |
| S Chikka Venkatappa S/O Late Seenappa | - | - |
| S Chikka Venkatappa S/O Late Seenappa | - | - |
| S Chikka Venkatappa S/O Late Seenappa | - | - |
| Venkatappa S/O Narayanappa | - | - |
| S Chikka Venkatappa S/O Late Seenappa | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 227.88 cr | Rs 102.55 cr |
| On-site expenditure-Site Overhead | Rs 43.95 cr | Rs 5.84 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 15.93 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 9.00 cr | Rs 6.42 cr |
| On-site expenditure-Consultants Fees | Rs 5.90 cr | Rs 2.77 cr |
| On-site expenditure-Salaries of workers | Rs 1.71 cr | Rs 92.90 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aslam Architects & Interior Designers Pvt Ltd |
| Engineer | N K Srinivasulu |
| Chartered Accountant | M PadmanabhaBhat |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed220
As listed on the registration, under the names the promoter filed them with; the newest 80 of 220 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/050824/006959 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Ph-01 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Ph-01 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Ph-01 Q2.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Allure Avani 1 Q1 FY26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Allure Avani 1 Q1 FY 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Allure Avani 1 Q1 FY26-27.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: ca 1.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: arc 1.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: en.pdf | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: ca.pdf | 6 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: arc.PDF | 6 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: eng.pdf | 6 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 6 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 6 Feb 2026 |
| Clarafication for Source of Funds V4File: 5 Clarafication for Source of Funds V4.pdf | 1 Aug 2024 |
| Dileep Chakravarthy - NetworthFile: 5 Dileep Chakravarthy - Networth.pdf | 1 Aug 2024 |
| Balance Sheet FY 2021-22-DileepFile: Balance Sheet FY 2021-22-Dileep.pdf | 1 Aug 2024 |
| ITR Ack -FY 2021-22-Dileep BFile: ITR Ack -FY 2021-22-Dileep B.pdf | 1 Aug 2024 |
| Clarafication for Source of FundsFile: 5 Clarafication for Source of Funds.pdf | 1 Aug 2024 |
| Networth - Ravi AnemFile: Networth Ravi.PDF | 1 Aug 2024 |
| Bank Statement Ravi SirFile: Bank Statement Ravi Sir.pdf | 1 Aug 2024 |
| Loan Sanction LetterFile: Loan Sanction Letter.pdf | 1 Aug 2024 |
| Clarafication for Source of FundsFile: 5 Clarafication for Source of Funds V3.pdf | 30 Jul 2024 |
| CDP MapFile: 25 CDP Map V1.pdf | 11 Jun 2024 |
| CDP Map As received from Town Planning Authorities - Kammasandra VillageFile: 25 CDP Map V0.pdf | 11 Jun 2024 |
| Village Map received from Town Planning Authorities - Kammasandra VillageFile: 26 Village Map.pdf | 11 Jun 2024 |
| CDP MapFile: 25 CDP Map.pdf | 29 May 2024 |
| Village MapFile: 26 Village Map.pdf | 29 May 2024 |
| Commencement CertificateFile: 27 Commencement Certificate.pdf | 29 May 2024 |
| SEIAAFile: 28 SEIAA Fee Challan and Affidavit.pdf | 29 May 2024 |
| Built Up Area Difference with KSPCBFile: 29 KSPCB Area Difference Affidavit.pdf | 29 May 2024 |
| Building LicenseFile: 31 Building License Affidavit.pdf | 29 May 2024 |
| Affidivit For NOC & AreaFile: Affidavit For NOC.pdf | 29 May 2024 |
| Source of FundsFile: 5 Clarafication for Source of Funds V2.pdf | 29 May 2024 |
| Source of FundsFile: Loan Sanction Letter.pdf | 29 May 2024 |
| 1a Collection StatementFile: 1a Collection Statement.pdf | 20 May 2024 |
| 1b RERA StatementFile: 1b RERA Statement.pdf | 20 May 2024 |
| 1c Current StatementFile: 1c Current Statement.pdf | 20 May 2024 |
| Bank AffidavitFile: 2 Bank Affidavit.pdf | 20 May 2024 |
| 3a Balance SheetFile: 3a Balance Sheet.pdf | 20 May 2024 |
| 3b P & L FY 2022-23File: 3b P & L FY 2022-23.pdf | 20 May 2024 |
| PAN Self AttestedFile: 4 PAN Self Attested.pdf | 20 May 2024 |
| aMPBhatICAIMemberCardFile: 7 aMPBhatICAIMemberCard.pdf | 20 May 2024 |
| 8a RTC 57-2 FY 24File: 8a RTC 57-2 FY 24.pdf | 20 May 2024 |
| 8b RTC 58-1 FY22-23File: 8b RTC 58-1 FY22-23.pdf | 20 May 2024 |
| 8c RTC 58-2 FY 22File: 8c RTC 58-2 FY 22.pdf | 20 May 2024 |
| 8d RTC 57-2 FY22File: 8d RTC 57-2 FY22.pdf | 20 May 2024 |
| 8e RTC 73-2 FY 23File: 8e RTC 73-2 FY 23.pdf | 20 May 2024 |
| 8f RTC 73-2 FY 22File: 8f RTC 73-2 FY 22.pdf | 20 May 2024 |
| 8g RTC 73-1 FY 23File: 8g RTC 73-1 FY 23.pdf | 20 May 2024 |
| 8h RTC 73-1 FY 22File: 8h RTC 73-1 FY 22.pdf | 20 May 2024 |
| 8i RTC 59-1 FY 23File: 8i RTC 59-1 FY 23.pdf | 20 May 2024 |
| 8j RTC 59-2 FY 23File: 8j RTC 59-2 FY 23.pdf | 20 May 2024 |
| 8k RTC 58-2 FY 23File: 8k RTC 58-2 FY 23.pdf | 20 May 2024 |
| 9a EC 57-2File: 9a EC 57-2.pdf | 20 May 2024 |
| 9b EC 58-1File: 9b EC 58-1.pdf | 20 May 2024 |
| 9b EC 58-1File: 9b EC 58-1.pdf | 20 May 2024 |
| 9c EC 58-2File: 9c EC 58-2.pdf | 20 May 2024 |
| 9d EC 59-1File: 9d EC 59-1.pdf | 20 May 2024 |
| 9f EC 59-2File: 9f EC 59-2.pdf | 20 May 2024 |
| 9g EC 73-1File: 9g EC 73-1.pdf | 20 May 2024 |
| 9h EC 73-2File: 9h EC 73-2.pdf | 20 May 2024 |
| 10a Conversion Order 58-1File: 10a Conversion Order 58-1.pdf | 20 May 2024 |
| 10b Conversion Order 58-2File: 10b Conversion Order 58-2.pdf | 20 May 2024 |
| 10c Conversion Order 59-1File: 10c Conversion Order 59-1.pdf | 20 May 2024 |
| 10e Conversion Order 59-2File: 10e Conversion Order 59-2.pdf | 20 May 2024 |
| 10f Conversion Order 73-1File: 10f Conversion Order 73-1.pdf | 20 May 2024 |
| 10g Conversion Order 73-2File: 10g Conversion Order 73-2.pdf | 20 May 2024 |
| 12a Release deed 57-2File: 12a Release deed 57-2.pdf | 20 May 2024 |
| 12b Title 57-2 1989File: 12b Title 57-2 1989_compressed.pdf | 20 May 2024 |
| 13a Certified TC 58-2 1986 V1 PG 3File: 13a Certified TC 58-2 1986 V1 PG 3.pdf | 20 May 2024 |
| 13b Certificed TC 59-1 1985File: 13b Certificed TC 59-1 1985.pdf | 20 May 2024 |
| 13c Certificed TC 59-2 1985File: 13c Certificed TC 59-2 1985.pdf | 20 May 2024 |
| 14a Katha 57-2File: 14a Katha 57-2.pdf | 20 May 2024 |
| 14b Jenti Katha - Allure AvaniFile: 14b Jenti Katha - Allure Avani.pdf | 20 May 2024 |
| 14b Katha 58-1File: 14b Katha 58-1.pdf | 20 May 2024 |
| 14c Katha 58-2File: 14c Katha 58-2.pdf | 20 May 2024 |
| 14d Katha 59-1File: 14d Katha 59-1.pdf | 20 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Allure Avani Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Allure Awani Private Limited
Allure Awani Private Limited has 2 registrations on RERA Karnataka, including Allure Avani Phase I and Allure Avani Phase 2. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Allure Avani Phase I is delayed beyond 8 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Allure Avani Phase I?
The registered promoter entity is Allure Awani Private Limited, a company as per the filing. Its CIN U70109TG2022PTC168127 and GSTIN 29AAXCA8734B1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Allure Avani Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Allure Avani Phase I?
The professionals named in the filing: Architect: Aslam Architects & Interior Designers Pvt Ltd; Engineer: N K Srinivasulu; Chartered Accountant: M PadmanabhaBhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Allure Avani Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback